NSLS-II commissioning and operation

The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

43 PARTICLE ACCELERATORS↗

NSLS-II injector commissioning and initial operation

The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

43 PARTICLE ACCELERATORS↗

Design of the NSLS-II Top-Off Safety System

The NSLS-II accelerators finished commissioning in the fall of 2014, with beamline commissioning underway. Part of the design for the NSLS-II is to operate in top off mode. The Top Off Safety System (TOSS) is presently being installed. In this report we discuss the Top Off Safety System design and implementation, along with the necessary tracking results and radiological calculations.

43 PARTICLE ACCELERATORS↗

NSLS-II Booster Design

The NSLS-II booster is required to produce a 3 GeV bunch train with an accelerated charge of about 10 nC at a repetition rate of 1 Hz and a horizontal beam emittance around 40 nm-rad. Injection into the booster ring takes place at an energy of 200 MeV. The booster magnetic field and RF voltage are ramped for 500 ms to accelerate the electron beam from the injection energy to the nominal energy of 3 GeV. At the maximum field of the ramp, the electron beam is extracted from the booster and injected into the Storage Ring. We allow for a maximum beam loss of 30% during injection, 20% maximum loss during extraction. Thus the charge to be accelerated in the booster is 10 nC which corresponds to an average beam current of 20 mA. Since the dynamic aperture of the storage ring is limited, the quality of the injected beam has received serious consideration. In particular, the booster emittance may impact the injection efficiency. As the beam intensity in the storage ring is intended to be quasi-constant by frequently (once per minute) injecting beam into the storage ring (top-off injection) good injection efficiency is mandatory to minimize the frequency of top-off cycles, radiation dose induced by the lost electrons and perturbations of the stored beam orbit driven by the injection transients. During the last 10 years, many 3 rd generation synchrotron light facilities have been put into operation. Nearly all of these facilities have chosen a full energy booster synchrotron as an injector together with a low energy linac as pre-injector.

43 PARTICLE ACCELERATORS↗