Search NASA⌕ Search

Engineering topics

Garcia Fajardo, L.

Publications and source records attributed to Garcia Fajardo, L..

First results of AUP Nb3Sn quadrupole horizontal tests

The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.

43 PARTICLE ACCELERATORS↗

Analysis of the Mechanical Performance of the 4.2-m-Long MQXFA Magnets for the Hi-Lumi LHC Upgrade

Under the U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), the 150 mm bore, high-field Nb 3 Sn low-{eta}_MQXFA quadrupole magnets are being fabricated, assembled and tested, in the context of the CERN Hi-Luminosity LHC (HL-LHC) upgrade. These magnets have 4.2 m magnetic length and 4.56 m long iron yoke. To date, eight MQXFA magnets have been tested. One of the magnets additionally underwent a successful endurance test with 40 triggered quenches, and two magnets did not perform as expected. This work summarizes for the first time the available strain gauge data from eight identical Nb 3 Sn MQXFA tested magnets, focusing on the endurance test, and on a possible cause of underperformance of the two magnets that did not pass the vertical test. Here we applied methods to prevent this from happening in future MQXFA magnets, which shown to be effective for last two tested magnets.

43 PARTICLE ACCELERATORS↗

The Challenges and Solutions of Meeting the Assembly Specifications for the 4.5 m Long MQXFA Magnets for the Hi-Luminosity LHC

The U.S. High-Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP) has, in the recent years, developed assembly specifications for the 4.5 m long MQXFA magnets, which are 150 mm aperture high-field Nb 3 Sn low-β quadrupole magnets that are being built for the CERN Hi-Luminosity LHC (HL-LHC) upgrade. While the specifications were based on lessons learned from the LHC Accelerator Research Program (LARP) effort and the MQXFS and MQXFA prototype magnets, the experience gained from having both MQXFA07 and MQXFA08 magnets not meeting performance specifications during cold testing actually catalyzed a better understanding of the impact of the target assembly specifications and a subsequent refinement of the same. This paper summarizes a body of assembly data from the Pre-Series (MQXFA03-MQXFA07) and Series magnets (MQXFA08-MQXFA11) that have been built to date, and discusses the processes employed to successfully face the challenge of ensuring that the assembly specifications are met for the duration of the project.

43 PARTICLE ACCELERATORS↗

Analysis of MQXFA07 Test Non-Conformity

MQXFA07 did not meet acceptance requirement during vertical test. This report presents the analysis of MQXFA07 components related to the limited test performance, and the damage mechanism as it was understood by the MQXFA team.

43 PARTICLE ACCELERATORS↗

Towards 20 T Hybrid Accelerator Dipole Magnets

We report the most effective way to achieve very high collision energies in a circular particle accelerator is to maximize the field strength of the main bending dipoles. In dipole magnets using Nb-Ti superconductor the practical field limit is considered to be 8-9 T. When Nb 3 Sn superconductor material is utilized, a field level of 15-16 T can be achieved. To further push the magnetic field beyond the Nb 3 Sn limits, High Temperature Superconductors (HTS) need to be considered in the magnet design. The most promising HTS materials for particle accelerator magnets are Bi2212 and REBCO. However, their outstanding performance comes with a significantly higher cost. Therefore, an economically viable option towards 20 T dipole magnets could consist in an “hybrid” solution, where both HTS and Nb3Sn materials are used. We discuss in this paper preliminary conceptual designs of various 20 T hybrid magnet concepts. After the definition of the overall design criteria, the coil dimensions and parameters are investigated with finite element models based on simple sector coils. Preliminary 2D cross-section computation results are then presented and three main layouts compared: cos-theta, block, and common-coil. Both traditional designs and more advanced stress-management options are considered.

43 PARTICLE ACCELERATORS↗