Search NASA⌕ Search

Engineering topics

Gardner, C. J.

Publications and source records attributed to Gardner, C. J..

At least 19 records

Gold-gold luminosity increase in RHIC for a beam energy scan with colliding beam energies extending below the nominal injection energy

The Beam Energy Scan phase II (BES-II), performed in the Relativistic Heavy Ion Collider (RHIC) from 2019 to 2021, explored the phase transition between quark-gluon plasma and hadronic gas. BES-II exceeded the goal of a fourfold increase in the average luminosity over that achieved during Beam Energy Scan phase I (BES-I), at five gold beam energies: 9.8, 7.3, 5.75, 4.59, and 3.85 GeV / nucleon. This was accomplished by addressing several beam dynamics effects, including intrabeam scattering, beam-beam, space charge, beam instability, and field errors induced by superconducting magnet persistent currents. Some of these effects are especially detrimental at low energies. BES-II achievements are presented, and the measures taken to improve RHIC performance are described. These measures span the whole RHIC complex, including ion beam sources, injectors, beam lifetime improvements in RHIC, and operation with the world’s first bunched beam Low Energy RHIC electron Cooler (LEReC).

43 PARTICLE ACCELERATORS↗

Preparation for the Beam Energy Scan II at RHIC in 2020

RHIC will provide Au-Au collisions at beam energies of 5.75, 4.59 GeV/nucleon for physics program in 2020, and at beam energy of 3.85 GeV/nucleon for physics program in 2021 as part of the BeamEnergy Scan II (BES-II). The oper- ational experience gained in the first year (2019) of BES-II operation will be applied toward operations in the coming years. This article will present some technical details and the outlook of the BES-II operations in the coming years.

43 PARTICLE ACCELERATORS↗

Emittance growth due to multiple passes through H-minus stripping foil in Booster

Expressions for transverse emittance growth due to turn-by-turn passes through the H-minus stripping foil in Booster are developed here from simple principles of statistics and simple assumptions about the initial distribution of particles incident on the foil. These are meant to complement work already presented by Zeno [1, 2, 3] and Brown [4]. The expressions show that while the average emittance hEi of the distribution simply increases linearly with turn number, the emittance E based on the mean square particle position does so with an additional oscillatory term that depends on the machine tune. It is shown that this term can be ignored as long as the turn number is su ciently large and the tune is su ciently far from integer and half-integer values. Under these conditions the relation between hEi and E is simply hEi = 2 E. This relation is shown to hold for a Gaussian distribution that is matched to the machine lattice. Two symmetry conditions which help characterize the particle distribution are identi ed. These provide justi cation for calling E an emittance. It is shown that if the conditions are satis ed by the initial distribution, they will not be satis ed after a single traversal of the foil and one turn around the machine. However, on subsequent turns the distribution can (and does) return to satisfying the conditions. Moreover, for su ciently large turn number, the symmetry conditions are approximately satis ed. As already noted in [4], the emittance growth per turn is proportional to the lattice beta at the foil and the mean square angular kick received by protons passing through the foil. We take the former to be 5 m. The latter is obtained from simulations performed with the code TRIM [5]. Having these numbers in hand, actual numbers for emittance growth are presented. The reader may wish to start with Section 11 and refer to previous sections as needed or desired.

43 PARTICLE ACCELERATORS↗

Beam energy scan with asymmetric collision at RHIC

A beam energy scan of deuteron-gold collision, with center-of-mass energy at 19.6, 39, 62.4 and 200.7 GeV/n, was performed at the Relativistic Heavy Ion Collider in 2016 to study the threshold for quark-gluon plasma (QGP) production. The lattice, RF, stochastic cooling and other subsystems were in different configurations for the various energies. The operational challenges changed with every new energy. The operational experience at each energy, the operation performance, highlights and lessons of the beam energy scan are reviewed in this report.

43 PARTICLE ACCELERATORS↗

Double and triple-harmonic RF buckets and their use for bunch squeezing in AGS

For the past several years we have merged bunches in AGS in order to achieve the desired intensity per bunch prior to injection into RHIC. The merging is done on a flat porch at or above AGS injection energy. Because the merges involve the reduction of the RF harmonic number by a factor of 2 (for a 2 to 1 merge) and then a factor of 3 (for a 3 to 1 merge), one requires RF frequencies 6hf s , 3hf s , 2hf s and hf s , where f s is the revolution frequency on the porch and h = 4 is the fundamental harmonic number. The standard AGS RF cavities cannot operate at the lowest frequencies 2hf s and hf s ; these are provided by two modified cavities. Upon completion of the merges, the bunches are sitting in harmonic h buckets. In order to be accelerated they need to be squeezed into harmonic 3h buckets. This is accomplished by producing a double-harmonic bucket in which harmonics h and 2h act in concert, and then a triple-harmonic bucket in which harmonics h, 2h, and 3h act in concert. Simulations have shown that the squeeze presents an acceptance bottleneck which limits the longitudinal emittance that can be put into the harmonic 3h bucket. In this note the areas of the double and triple-harmonic buckets are calculated explicitly, and it is shown that these go through a minimum as the RF voltages are raised to the desired values. Several RF voltage ranges are examined, and the acceptance bottleneck is determined for each of these. Finally, the acceptance bottleneck for Au77+ bunches in AGS is calculated for several RF voltage ranges. The main result is that the RF voltages for the low-frequency harmonic h and 2h cavities both must be at least 22 kV in order to achieve an acceptance of 0:6 eV s per nucleon. If the harmonic h and 2h voltages are 15 and 22 kV, respectively, then the acceptance is reduced to 0:548 eV s per nucleon.

43 PARTICLE ACCELERATORS↗

Simulation of 6 to 3 to 1 merge and squeeze of Au77+ bunches in AGS

In order to increase the intensity per Au77+ bunch at AGS extraction, a 6 to 3 to 1 merge scheme was developed and implemented by K. Zeno during the 2016 RHIC run. For this scheme, 12 Booster loads, each consisting of a single bunch, are delivered to AGS per AGS magnetic cycle. The bunch from Booster is itself the result of a 4 to 2 to 1 merge which is carried out on a flat porch during the Booster magnetic cycle. Each Booster bunch is injected into a harmonic 24 bucket on the AGS injection porch. In order to fit into the buckets and allow for the AGS injection kicker rise time, the bunch width must be reduced by exciting quadrupole oscillations just before extraction from Booster. The bunches are injected into two groups of six adjacent harmonic 24 buckets. In each group the 6 bunches are merged into 3 by bringing on RF harmonic 12 while reducing harmonic 24. This is a straightforward 2 to 1 merge (in which two adjacent bunches are merged into one). One ends up with two groups of three adjacent bunches sitting in harmonic 12 buckets. These bunches are accelerated to an intermediate porch for further merging. Doing the merge on a porch that sits above injection energy helps reduce losses that are believed to be due to the space-charge force acting on the bunched particles. (The 6 to 3 merge is done on the injection porch because the harmonic 24 frequency on the intermediate porch would be too high for the AGS RF cavities.) On the intermediate porch each group of 3 bunches is merged into one by bringing on RF harmonics 8 and 4 and then reducing harmonics 12 and 8. One ends up with 2 bunches, each the result of a 6 to 3 to 1 merge and each sitting in a harmonic 4 bucket. This puts 6 Booster loads into each bunch. Each merged bunch needs to be squeezed into a harmonic 12 bucket for subsequent acceleration. This is done by again bringing on harmonic 8 and then harmonic 12. Results of simulations of the 6 to 3 to 1 merge and the subsequent squeeze into harmonic 12 buckets are presented in this note. In particular, they provide a benchmark for what can be achieved with the available RF voltages.

43 PARTICLE ACCELERATORS↗

RHIC operation with asymmetric collisions in 2015

To study low-x shadowing/saturation physics as well as other nuclear effects [1], [2], proton-gold (p-Au, for 5 weeks) and proton-Aluminum (p-Al, for 2 weeks) collisions were provided for experiments in 2015 at the Relativistic Heavy Ion Collider (RHIC), with polarized proton beam in the Blue ring and Au/Al beam in the Yellow ring. The special features of the asymmetric run in 2015 will be introduced. The operation experience will be reviewed as well in the report.

43 PARTICLE ACCELERATORS↗