Space shuttle development Motor No. 9 (DM-9), volume 1

The results obtained during the December 23, 1987 static firing of the DM-9 test article are presented. The DM-9 full-scale static test article employed redesigned solid rocket motor (RSRM) field joint capture feature hardware with J-seal insulation configuration, and nozzle-to-case joint radial bolt design with bonded insulation configuration. The nozzle incorporated RSRM components, including a thicker cowl with involuted outer boot ring. The nozzle employed redundant and verifiable seals in all five joints, and room temperature vulcanization backfill in three joints. With very few exceptions, the DM-9 test article was flight configuration. The test was conducted under extreme weather conditions: temperature of 25 F and wind at 15 to 20 mph. Ballistics performance values were within specification requirements. The RSRM field joint (J-seal) insulation configuration functioned as predicted with no indication of hot gases reaching the capture feature O-rings. There was a blowhole in the polysulfide adhesive in the nozzle-to-case joint, but no evidence of hot gases past the wiper O-ring. Nozzle design changes appeared to perform nominally, with the exception of the outer boot ring, which suffered partial structural breakup late in the test. Field joint heaters maintained the controlling resistance temperature device temperature within the specified requirements during heater operation. The thrust vector control system operated properly. The redesigned water deluge system, temperature conditioning equipment, and other test support equipment performed as planned.

Garecht, Diane M.↗

Flight motor set 360L009 (STS-36). Volume 1: System overview

Flight Motor Set 360L009, as part of NASA Space Shuttle Mission STS-36, a Department of Defence mission, was launched after two launch attempts. One launch was scrubbed following the failure of a ground-based Range Safety computer and one was scrubbed due to cloud cover at the return to launch landing site. As with all previous redesigned solid rocket motor launches, overall motor performance was excellent. There were no debris concerns from either motor. All ballistic and mass property parameters that could be assessed, closely matched the predicted values and were well within the required contract item specification levels. All field joint heaters and igniter joint heaters performed without anomalies. Evaluation of the ground environment instrumentation measurements again verified thermal model analysis data and showed agreement with predicted environmental effects. No launch commit criteria violations occurred. Postflight inspection again verified nominal performance of the insulation, phenolics, metal parts, and seals. Postflight evaluation indicated that both nozzles performed as expected during flight. All combustion gas was contained by insulation in the field and case-to-nozzle joints. Recommendations were made concerning improved thermal modeling and measurements. The rationale for these recommendations and complete result details are presented.

Garecht, Diane M.↗

Flight motor set 360L001 (STS-26R). Volume 1: System overview, revision A

The NASA space shuttle flight STS-26R, launched at 11:37.00.009 am, EDT on 29 Sep. 1988, used the redesigned solid rocket motors (RSRM) 360L001A and 360L001B. Evaluation of the ground environment instrumentation (GEI) data recorded prior to flight showed no launch commit criteria violations; that the field joint heater and aft skirt thermal conditioning systems performed adequately; and that the GEI data showed good agreement with thermal model predictions. Evaluation of the developmental flight instrumentation (DFI) revealed excellent agreement with both the predicted and required ballistic specifications. All parameters were well within the GEI specification requirements including propellant burn rates, specific impulse values, and thrust imbalance. Recorded strain values also indicated satisfactory radial growth and stress levels, as well as verification of adequate safety factors. Postflight inspection of the insulation, seals, case, and nozzles showed overall excellent performance. Some thermal DFI protective cork was missing, and inoperative field joint vent valves on the thermal protection cork allowed water entry into the field joints upon splashdown. Evaluation of these anomalies, as well as complete evaluation of all Redesigned Solid Rocket Motor components, is contained.

Garecht, Diane M.↗

Flight motor set 360L006 (STS-34). Volume 1: System overview

Flight motor set 360L006 was launched at approximately 11:54 a.m. Central Daylight Time (CDT) on 18 October 1989 as part of NASA space shuttle mission STS-34. As with all previous redesigned solid rocket motor launches, overall motor performance was excellent. All ballistic contract end item (CEI) specification parameters were verified with the exceptions of ignition interval and rise rates. Ignition interval and rise rates could not be verified due to the elimination of developmental flight instrumentation from fourth flight and subsequent, but the low sample rate data that were available showed nominal propulsion performance. All ballistic and mass property parameters closely matched the predicted values and were well within the required CEI specification levels that could be assessed, with the exception of the RH-motor vacuum-delivered specific impulse. It exceeds the upper-limit CEI specification due to a bias imposed on the raw data by the OPT/Taber gage measurement differences. Evaluation of the ground environment instrumentation measurements again verified thermal model analysis data and showed agreement with predicted environmental effects. No launch commit criteria thermal violations occurred. Postflight inspection again verified superior performance of the insulation, phenolics, metal parts, and seals. Postflight evaluation indicated both nozzles performed as expected during flight, although splashdown loads tore the left-hand, 45-deg actuator bracket from the nozzle. All combustion gas was contained by insulation in the field and nozzle-to-case joints. Recommendations were made concerning improved thermal modeling and measurements. The rationale for these recommendations, the disposition of all anomalies, and complete result details are contained.

Garecht, Diane M.↗