Search NASA⌕ Search

Engineering topics

Gassner, David

Publications and source records attributed to Gassner, David.

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Progress on the design of the interaction region of the Electron-Ion Collider EIC

We present an update on the design of the Interaction Region (IR) for the the Electron Ion Collider (EIC) being built at Brookhaven National Laboratory (BNL). The EIC will collide high energy and highly polarized hadron and electron beams with a center of mass energy up to 140 GeV with luminosities of up to 10^34 /cm^2/s. The IR, located at RHIC's IR6, is designed to meet the requirements of the nuclear physics community as outlined in [1]. A second IR is technically feasible but not part of the project.The magnet apertures are sufficiently large to allow desired collision products to reach the far-forward detectors; the electron magnet apertures in the rear direction are chosen to be large enough to pass the synchrotron radiation fan. In the forward direction the electron apertures are large enough for non-Gaussian tails.The paper discusses a number of recent recent changes to the design. The machine free region was recently increased from 9 to 9.5 m to allow for more space in the forward direction for the detector. The superconducting magnets on the forward side now operate at 1.9 K, which helps crosstalk and space issues.

43 PARTICLE ACCELERATORS↗

Design Status of the Electron-Ion Collider

The Electron-Ion Collider is gearing up for "Critical Decision 2", theproject baseline with defined scope, cost and schedule.Lattice designs are beingfinalized, and preliminary component design is being carried out. Beam dynamicsstudies such as dynamic aperture optimization, instability and polarizationstudies, and beam-beam simulations are continuing in parallel. We report onthe latest developments and the overall status of the project, and presentthe plans for future activities.

43 PARTICLE ACCELERATORS↗

Thermal simulation of the HSR arc BPM Module for EIC

The Electron Ion Collider (EIC) Hadron Storage Ring (HSR) will reuse most of the existing superconducting magnets from the RHIC storage ring. However, the existing stripline beam position monitors (BPM) used for RHIC will not be compatible with the planned EIC hadron beam parameters that include higher intensity, shorter bunches, and some operational scenarios with large radial offsets of the beam in the vacuum chamber. To address these challenges, the existing RHIC stripline BPMs will be shielded, and a new BPM design using button pick-ups and integrated in a new vacuum interconnect/bellows assembly that will be installed adjacent to the existing BPMs. A thermal analysis of the new arc BPM housing and button pick-up design has been conducted to assess the effects caused by beam induced resistive wall heating and signal propagation through the button pick-up cables for several operational scenarios. This report will describe the analysis results to quantify the heat transfer and temperature distribution that can be expected on the new HSR cryogenic arc BPM housings, button pick-ups, and cryo-signal cables.

43 PARTICLE ACCELERATORS↗

High precision magnetic field measurement and mapping of the LEReC 180 degree bending magnet using very low field NMR with hall combined probe (140 - 350 gauss)

The Relativistic Heavy Ion Collider (RHIC) at BNL are using the Low Energy RHIC Electron Cooling (LEReC) to conduct experiments that search for the quantum chromodynamic (QCD) critical point. The first ever electron cooling based on the RF acceleration of electron beams was experimentally demonstrated on April 5, 2019 at LEReC at BNL. The first critical step in obtaining successful 3D non-magnetized cooling of the Au ion bunches in the RHIC cooling section was matching the electron beam energy with a relative error less than 5*10 -4 to the ion beam energy. Part of the LEReC beamline is a dipole magnet that bends the electron beam 180 degree. One of the most outstanding measurement challenges is that the dipole field is so low (≈200 G). Most of the existing NMR probes can only measure fields >400 G. Lower signal-to-noise ratio at low fields is requires the use of larger sample volumes. Working with CAYLAR, a NMR probe has been redesigned and optimized for these low field measurements with high resolution. We report the methods, challenges, and results for extensive magnetic field mappings of the 180 dipole magnet. A combination of NMR and Hall sensors has been successfully implemented to measure uniform field regimes inside the magnet center area and non-uniform field regimes at the magnet ends. Detailed measurement and mapping have been performed at five radii and five heights along the beam trajectory. Meanwhile a finite element magnetic modeling simulation of the magnet using Opera software has been performed. The calculated and measured data are compared, and the calculated data is good reference for measured data over long length mapping from magnet edge to center. The measured magnetic measurement data is directly useful for beam instrumentation, diagnostics and operation.

Magnetic Field Measurement↗