Search NASA⌕ Search

Engineering topics

Gearhart, Jared Lee

Publications and source records attributed to Gearhart, Jared Lee.

At least 19 records

CI-MOR Final Report: Analysis and Validation of Critical Infrastructure Models using Model Order Reduction

This report summarizes the research and capabilities developed as part of the project “Analysis and Validation of Critical Infrastructure Models using Model Order Reduction” (CI-MOR) LDRD project. CI-MOR research enables the solution of large, complex optimization models that naturally arise in national security challenges involving critical infrastructures. Specifically, CI-MOR researchers developed methods to (1) rigorously approximate complex, nonlinear optimization formulations, (2) identify alternative near-optimal solutions, (3) accelerate optimization workflows used for complex applications, and (4) rigorously integrate domain knowledge in stochastic-process models. This report provides an overview of the research done in CI-MOR, and we describe application exemplars used to illustrate CI-MOR capabilities. Furthermore, we describe the software developed by CI-MOR that researchers can leverage to analyze new applications.

97 MATHEMATICS AND COMPUTING↗

Microgrid Design Toolkit (MDT) User Guide: Software v1.4

The MDT is a decision support software that can provide the information needed to identify optimal microgrid designs in the early stages of the design process. MDT searches the trade space of alternative microgrid designs in terms of user-defined objectives, such as performance, reliability, and cost. It produces a Pareto frontier of solutions embodying the efficient tradeoffs amongst multiple user-defined objectives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Resource Supply-Demand-Routing Model for the COVID-19 Crisis

As part of the Department of Energy response to the novel coronavirus disease (COVID-19) pandemic of 2020, a modeling effort was sponsored by the DOE Office of Science. Through this effort, an integrated planning framework was developed whose capabilities were demonstrated with the combination of a treatment resource demand model and an optimization model for routing supplies. This report documents this framework and models, and an application involving ventilator demands and supplies in the continental United States. The goal of this application is to test the feasibility of implementing nationwide ventilator sharing in response to the COVID-19 crisis. Multiple scenarios were run using different combinations of forecasted and observed patient streams, and it is demonstrated that using a "worst-case forecast for planning may be preferable to best mitigate supply-demand risks in an uncertain future. There is also a brief discussion of model uncertainty and its implications for the results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modeling ocean, rail, and truck transportation flows to support policy analysis

Freight transportation represents about 9.5% of GDP in the U.S., it is responsible for about 8% of greenhouse gas emissions, and supports the import and export of about 3.6 trillion in international trade. It is therefore important that the national freight transportation system is designed and operated efficiently. Hence, this paper develops a mathematical model to estimate international and domestic freight flows across ocean, rail, and truck modes, which can be used to study the impacts of changes in our infrastructure, as well as the imposition of new user fees and changes in operating policies. The model integrates a user equilibrium-based logit argument for path selection with a system optimal argument for rail network operations. This leads to the development of a unique solution procedure that is demonstrated in a large-scale analysis focused on all intercity freight and U.S export/import containerized freight. The model results are compared with the reported flow volumes. Here, the model is applied to two case studies: a disruption of the seaports of Los Angeles and Long Beach (LA and LB) similar to the impacts that would be felt in an earthquake; and implementation of new user fees at the California ports.

99 GENERAL AND MISCELLANEOUS↗

Contingency Contractor Optimization Phase 3 Sustainment Cost by JCA Implementation Guide

This document provides implementation guidance for implementing personnel group FTE costs by JCA Tier 1 or 2 categories in the Contingency Contractor Optimization Tool – Engineering Prototype (CCOT-P). CCOT-P currently only allows FTE costs by personnel group to differ by mission. Changes will need to be made to the user interface inputs pages and the database

97 MATHEMATICS AND COMPUTING↗

Scope Complexity Options Risks Excursions (SCORE) Factor Mathematical Description.

The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options, resulting in scores. SCORE factors extend this capability by providing estimates of complexity relative to a base system (i.e., all design options are normalized to one weapon system). First, a clearly defined set of scope elements for a warhead option is established. The complexity of each scope element is estimated by Subject Matter Experts (SMEs), including a level of uncertainty, relative to a specific reference system. When determining factors, complexity estimates for a scope element can be directly tied to the base system or chained together via comparable scope elements in a string of reference systems that ends with the base system. The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA-12 led Enterprise Modeling and Analysis Consortium (EMAC). Historically, it has provided the data elicitation, integration, and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Scope Complexity Options Risks Excursions (SCORE) Version 3.0 Mathematical Description.

The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options. The results of this model allow those considering these options to understand the complexity tradeoffs between proposed warhead options. The core idea of SCORE is to divide a warhead option into a well- defined set of scope elements and then estimate the complexity of each scope element against a well understood reference system. The uncertainty associated with estimates can also be captured. A weighted summation of the relative complexity of each scope element is used to determine the total complexity of the proposed warhead option or portions of the warhead option (i.e., a National Work Breakdown Structure code). The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA- 12 led Enterprise Modeling and Analysis Consortium (EMAC), that has provided the data elicitation, integration and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Risk Evaluation for Identification and Intervention in Dual Use Research of Concern (DURC) for International Biological R&D Activity

This report summarizes the work performed as part of a Laboratory Directed Research and Development project focused on evaluating and mitigating risk associated with biological dual use research of concern. The academic and scientific community has identified the funding stage as the appropriate place to intervene and mitigate risk, so the framework developed here uses a portfolio-level approach and balances biosafety and biosecurity risks, anticipated project benefits, and available mitigations to identify the best available investment strategies subject to cost constraints. The modeling toolkit was designed for decision analysis for dual use research of concern, but is flexible enough to support a wide variety of portfolio-level funding decisions where risk/benefit tradeoffs are involved. Two mathematical optimization models with two solution methods are included to accommodate stakeholders with varying levels of certainty about priorities between metrics. An example case study is presented.

59 BASIC BIOLOGICAL SCIENCES↗

Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 Sustainment Requirements Document Contingency Contractor Optimization Tool - Prototype

This requirements document serves as an addendum to the Contingency Contractor Optimization Phase 2, Requirements Document [1] and Phase 3 Requirements Document [2]. The Phase 2 Requirements document focused on the high-level requirements for the tool. The Phase 3 Requirements document provided more detailed requirements to which the engineering prototype was built in Phase 3. This document will provide detailed requirements for features and enhancements being added to the production pilot in the Phase 3 Sustainment.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

97 MATHEMATICS AND COMPUTING↗