Search NASASearch

Engineering topics

Geaslen, W. D.

Publications and source records attributed to Geaslen, W. D..

Checking Fits With Digital Image Processing

Computer-aided video inspection of mechanical and electrical connectors feasible. Report discusses work done on digital image processing for computer-aided interface verification (CAIV). Two kinds of components examined: mechanical mating flange and electrical plug.

Davis, R. M.

EG&G Florida, Inc., KSC base operations contractor Launch Readiness Assessment System

A computerized Launch Readiness Assessment System (LRAS) which compares 'current status' of readiness against the 'required status' of readiness for the Space Shuttle. The five subsystems of the LRAS are examined in detail. The LRAS Plan specifies the overall system requirements, procedures, and reports. The LRAS Manager drives the operation of the LRAS system. The Responding Units (RU) maintain support plans and procedures which specify the detail requirements for each mission or milestone. The Master Data Tables contain the milestone, responsible RU relationships, and requirements assessment categories. The LRAS Status System serves as the launch readiness assessment reporting system. The relationships between these subsystems are displayed in diagrams.

Geaslen, W. D.