Search NASA⌕ Search

Engineering topics

George, Sean

Publications and source records attributed to George, Sean.

Enabling Pinpoint Landing (PPL) on Mars

Pinpoint landing (PPL) missions will deliver about 1000 kg of useful payload to the surface of Mars. Mid-to-high latitude landing site compatibility is sought which should provide the means to land at sites up to 2.5 km above Mars mean surface altitude. A dispersion and control analysis process is presented which helps to identify the effects of PPL error drivers, quantify the effect of dispersions on landing error and quantify the landing position control capability/authority along the entry path. An entry/descent/landing (EDL) profile is provided. Guided aeroshell is the baseline for all candidate Mars atmospheric entry architectures. A two-stage architecture is considered for the aerodynamic decelerator descent phase: supersonic parachute plus guided subsonic parachute or high-Mach inflatable decelerator plus guided subsonic parachute. The powered descent phase uses propulsive descent stage for soft landing and final error reduction maneuvers. Studies have found that the aeroshell entry face dispersions can be large, but closed-loop guidance can null out resulting errors to within about 2 km. Additionally, projected parachute control is inadequate to correct worst case dispersions without wind forecast data. To mitigate the problems dispersions due to atmospheric uncertainty can be reduced by providing on-board external means to measure density and winds ahead of the vehicle, higher L/D control authority options for the subsonic parachute phase can be investigated, and decelerators with control authority options for the supersonic descent phase can be examined. A navigation error analysis and wind effects summary are included.

aerodynamic↗

Enabling Pinpoint Landing on Mars

This slide presentation reviews the entry, descent and landing (EDL) of a pinpoint landing (PPL) on Mars. These PPL missions will be required to deliver about 1000 kg of useful payload to the surface of Mars, therefore soft landings are of primary interest. The landing sites will be in a mid to to high latitude with possible sites about 2.5 km above the martian mean surface altitude. The applicable EDL is described and reviewed in phases. The evaluation approach is reviewed and the requirements for an accurate landing are reviewed. The descent of the unguided aeroshell entry phase dispersion due to trajectory and ballistic coefficient variations are shown in charts. These charts view the dispersions from three entries, Entry from orbit, and two types of direct entry. There is discussion of the differences in steerable subsonic parachute control vs dispersions, and the propulsive phase delta velocity vs dispersions. Data is presented for the three trajectory phases (i.e., Aeroshell, supersonic and subsonic chute) for Direct entry and low orbit entry. The results of the analysis is presented, including possibilities for mitigation of dispersions. The analysis of the navigation error is summarized, and the trajectory biasing for martian winds is assessed.

aerodynamic↗