An extreme thermal cycling reliability test of ATLAS ITk Strips barrel modules

At the end of Run 3 of the Large Hadron Collider (LHC), the accelerator complex will be upgraded to the High-Luminosity LHC (HL-LHC) in order to increase the total amount of data provided to its experiments. To cope with the increased rates of data, radiation, and pileup, the ATLAS detector will undergo a substantial upgrade, including a replacement of the Inner Detector with a future Inner Tracker, called the ITk. The ITk will be composed of pixel and strip sub-detectors, where the strips portion will be composed of 17,888 silicon strip detector modules. During the HL-LHC running period, the ITk will be cooled and warmed a number of times from about -35°C to room temperature as part of the operational cycle, including warm-ups during yearly shutdowns. To ensure ITk Strips modules are functional after these expected temperature changes, and to ensure modules are mechanically robust, each module must undergo ten thermal cycles and pass a set of electrical and mechanical criteria before it is placed on a local support structure. This paper describes the thermal cycling Quality Control (QC) procedure, and results from the barrel pre-production phase (about 5% of the production volume). Additionally, in order to assess the headroom of the nominal QC procedure of 10 cycles and to ensure modules don't begin failing soon after, four representative ITk Strips barrel modules were thermally cycled 100 times — this study is also described.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A first look at AS-ROC: a Si-Ge integrated chip readout for fast timing

Abstract Advances in timing detector technology require new specialized readout electronics. Applications demand below 10 ps time of arrival resolution and low power for a low repetition rate. A possible path to achieve O(10 ps) time resolution is an integrated chip using Silicon Germanium (SiGe) technology. Using DoE SBIR funding, Anadyne, Inc., in collaboration with UC Santa Cruz, has developed a prototype SiGe front-end readout chip optimized for low power and timing resolution. Two versions of the chip were produced with performance in simulation: a more power version with 10 ps resolution at 5 fC with 1.1 mW/channel, and a less power version with 10 ps resolution at 8 fC with 0.6 mW/channel.The chip was produced at Tower Semiconductor with 350 nm technology. The ASIC from the prototype run shows good performance: a rise time of 0.7–1 ns and 25 mV per fC response with RMS noise <1 mV. Simulation and results from the prototype will be reported in this paper.

Instruments & Instrumentation↗

Specifications and pre-production of n + -in-p large-format strip sensors fabricated in 6-inch silicon wafers, ATLAS18, for the Inner Tracker of the ATLAS Detector for High-Luminosity Large Hadron Collider

Abstract The ATLAS experiment is constructing new all-silicon inner tracking system for HL-LHC. The strip detectors cover the radial extent of 40 to 100 cm. A new approach is adopted to use p-type silicon material, making the readout in n + -strips, so-called n + -in-p sensors. This allows for enhanced radiation tolerance against an order of magnitude higher particle fluence compared to the LHC. To cope with varying hit rates and occupancies as a function of radial distance, there are two barrel sensor types, the short strips (SS) for the inner 2 and the long strips (LS) for the outer 2 barrel cylinders, respectively. The barrel sensors exhibit a square, 9.8 × 9.8 cm 2 , geometry, the largest possible sensor area from a 6-inch wafer. The strips are laid out in parallel with a strip pitch of 75.5 μm and 4 or 2 rows of strip segments. The strips are AC-coupled and biased via polysilicon resistors. The endcap sensors employ a “stereo-annulus” geometry exhibiting a skewed-trapezoid shapes with circular edges. They are designed in 6 unique shapes, R0 to R5, corresponding to progressively increasing radial extents and which allows them to fit within the petal geometry and the 6-inch wafer maximally. The strips are in fan-out geometry with an in-built rotation angle, with a mean pitch of approximately 75 μm and 4 or 2 rows of strip segments. The eight sensor types are labeled as ATLAS18xx where xx stands for SS, LS, and R0 to R5. According to the mechanical and electrical specifications, CAD files for wafer processing were laid out, following the successful designs of prototype barrel and endcap sensors, together with a number of optimizations. A pre-production was carried out prior to the full production of the wafers. The quality of the sensors is reviewed and judged excellent through the test results carried out by vendor. These sensors are used for establishing acceptance procedures and to evaluate their performance in the ATLAS collaboration, and subsequently for pre-production of strip modules and stave and petal structures.

Instruments & Instrumentation↗

ATLAS ITk strip sensor quality control procedures and testing site qualification

Abstract The high-luminosity upgrade of the Large Hadron Collider, scheduled to become operational in 2029, requires the replacement of the ATLAS Inner Detector with a new all-silicon Inner Tracker. Radiation hard n + -in-p micro-strip silicon sensors were developed by the ATLAS Inner Tracker strip collaboration and are produced by Hamamatsu Photonics K.K. Production of the total amount of 22000 strip sensors has started in 2020 and will continue until 2025. The ATLAS strip sensor collaboration has the responsibility to monitor the quality of the fabricated devices by performing detailed measurements of individual sensor characteristics and by comparing the obtained results with the tests done by the manufacturer. Dedicated Quality Control procedures were developed to check whether the delivered large-format sensors adhere to the ATLAS specifications. The institutes performing the Quality Control testing of the pre-production and production ATLAS ITk strip sensors had to initially be qualified for multiple high-throughput tests by successfully completing the Site Qualification process. The Quality Control procedures and the qualification process are described in this paper.

Instruments & Instrumentation↗

Test and extraction methods for the QC parameters of silicon strip sensors for ATLAS upgrade tracker

The Quality Control (QC) of pre-production strip sensors for the Inner Tracker (ITk) of the ATLAS Inner Detector upgrade has finished, and the collaboration has embarked on the QC test programme for production sensors. This programme will last more than 3 years and comprises the evaluation of approximately 22000 sensors. 8 Types of sensors, 2 barrel and 6 endcap, will be measured at many different collaborating institutes. The sustained throughput requirement of the combined QC processes is around 500 sensors per month in total. Measurement protocols have been established and acceptance criteria have been defined in accordance with the terms agreed with the supplier. For effective monitoring of test results, common data file formats have been agreed upon across the collaboration. To enable evaluation of test results produced by many different test setups at the various collaboration institutes, common algorithms have been developed to collate, evaluate, plot and upload measurement data. This allows for objective application of pass/fail criteria and compilation of corresponding yield data. These scripts have been used to process the data of more than 3000 sensors so far, and have been instrumental for identification of faulty sensors and monitoring of QC testing progress.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Silicon strip defects and their impact on electrical performance of readout electronics

Abstract In preparation for the High Luminosity LHC (HL-LHC) runs, the ATLAS inner detector will be completely replaced with an all silicon Inner Tracker (ITk). Hybrid silicon pixel modules will be used for the innermost tracking layers, and silicon micro-strip detectors will be used the outer layers of the tracker. During the production of the detector, the sensors, readout electronics, and other components will undergo a series of quality control (QC) and quality assurance tests. Defects in the fabrication of the sensors will be flagged early in the manufacturer's and ATLAS QC tests. A study of the influence of sensor defects was performed to assess the characteristics of these defects in completed modules, and whether any defect posed a risk to the operation of the front-end readout electronics. All defects were found to have no impact on the performance of the front-end readout electronics for healthy amplifier channels, and defects that short the coupling between the strip implant and the metal readout electrode were only noticeable for strip leakage currents in excess of 250 nA, beyond the end-of-life currents expected for most sensors at the HL-LHC.

Instruments & Instrumentation↗

The ABC130 barrel module prototyping programme for the ATLAS strip tracker

For the Phase-II Upgrade of the ATLAS Detector [1], its Inner Detector, consisting of silicon pixel, silicon strip and transition radiation sub-detectors, will be replaced with an all new 100% silicon tracker, composed of a pixel tracker at inner radii and a strip tracker at outer radii. The future ATLAS strip tracker will include 11,000 silicon sensor modules in the central region (barrel) and 7,000 modules in the forward region (end-caps), which are foreseen to be constructed over a period of 3.5 years. The construction of each module consists of a series of assembly and quality control steps, which were engineered to be identical for all production sites. In order to develop the tooling and procedures for assembly and testing of these modules, two series of major prototyping programs were conducted: an early program using readout chips designed using a 250 nm fabrication process (ABCN-250) [2,2] and a subsequent program using a follow-up chip set made using 130 nm processing (ABC130 and HCC130 chips). This second generation of readout chips was used for an extensive prototyping program that produced around 100 barrel-type modules and contributed significantly to the development of the final module layout. This paper gives an overview of the components used in ABC130 barrel modules, their assembly procedure and findings resulting from their tests.

47 OTHER INSTRUMENTATION↗

Strip sensor performance in prototype modules built for ATLAS ITk

ATLAS experiment is preparing an upgrade of its detector for High-Luminosity LHC (HL-LHC) operation. The upgrade involves installation of the new all-silicon Inner Tracker (ITk). In the context of the ITk preparations, more than 80 strip modules were built with prototype barrel sensors. They were tested with electrical readout on a per-channel basis. In general, an excellent performance was observed, consistent with previous ASIC-level and sensor-level tests. However, the lessons learned included two phenomena important for the future phases of the project. First was the need to store and test the modules in a dry environment due to humidity sensitivity of the sensors. The second was an observation of high noise regions for 2 modules. The high noise regions were tested further in several ways, including monitoring the performance as a function of time and bias voltage. Additionally, direct sensor-level tests were performed on the affected channels. The inter-strip resistance and bias resistance tests showed low values, indicating a temporary loss of the inter-strip isolation. A subsequent recovery of the noise performance was observed. Here we present the test details, an analysis of how the inter-strip isolation affects the module noise, and the relationship with sensor-level quality control tests.