Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. It examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

JWST↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Yang, Kan↗

Thermal Considerations for Reducing the Cooldown and Warmup Duration of the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in 2018, is NASAs next-generation flagship telescope. The Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) contain all of the optical surfaces and instruments to capture and analyze the telescopes infrared targets. The integrated OTE and ISIM are denoted as OTIS, and will be tested as a single unit in a critical thermal-vacuum test in mid-2017 at NASA Johnson Space Centers Chamber A facility. The payload will be evaluated for workmanship and functionality in a 20K simulated flight environment during this thermal-vacuum test. However, the sheer thermal mass of the OTIS payload as well as the restrictive gradient, rate, and contamination-related constraints placed on test components precludes rapid cooldown or warmup to its steady-state cryo-balance condition. Hardware safety considerations precludes injection of helium gas for free molecular heat transfer. Initial thermal analysis predicted that transient radiative cooldown from ambient temperatures, while meeting all limits and constraints, would take 33.3 days; warmup similarly would take 28.4 days. This paper discusses methods used to reduce transition times from the original predictions through modulation of boundary temperatures and environmental conditions. By optimizing helium shroud transition rates and heater usage, as well as rigorously re-examining previously imposed constraints, savings of up to three days on cooldown and up to a week on warmup can be achieved. The efficiencies gained through these methods allow the JWST thermal test team to create faster cooldown and warmup profiles, thus reducing the overall test duration and cost, while keeping all of the required test operations.

Thermal↗

Thermal Considerations for Reducing the Cooldown and Warmup Duration of the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in 2018, is NASAs next-generation flagship telescope. The Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) contain all of the optical surfaces and instruments to capture and analyze the telescopes infrared targets. The integrated OTE and ISIM are denoted as OTIS, and will be tested as a single unit in a critical thermal-vacuum test in mid-2017 at NASA Johnson Space Centers Chamber A facility. The payload will be evaluated for workmanship and functionality in a 20K simulated flight environment during this thermal-vacuum test. However, the sheer thermal mass of the OTIS payload as well as the restrictive gradient, rate, and contamination-related constraints placed on test components precludes rapid cooldown or warmup to its steady-state cryo-balance condition. Hardware safety considerations precludes injection of helium gas for free molecular heat transfer. Initial thermal analysis predicted that transient radiative cooldown from ambient temperatures, while meeting all limits and constraints, would take 33.3 days; warmup similarly would take 28.4 days. This paper discusses methods used to reduce transition times from the original predictions through modulation of boundary temperatures and environmental conditions. By optimizing helium shroud transition rates and heater usage, as well as rigorously re-examining previously imposed constraints, savings of up to three days on cooldown and up to a week on warmup can be achieved. The efficiencies gained through these methods allow the JWST thermal test team to create faster cooldown and warmup profiles, thus reducing the overall test duration and cost, while keeping all of the required test operations.

JWST↗

James Webb Space Telescope Integrated Science Instrument Module Thermal Vacuum Thermal Balance Test Campaign at NASA's Goddard Space Flight Center

The James Webb Space Telescope is a large infrared telescope with a 6.5-meter primary mirror, designed as a successor to the Hubble Space Telescope when launched in 2018. Three of the four science instruments contained within the Integrated Science Instrument Module (ISIM) are passively cooled to their operational temperature range of 36K to 40K with radiators, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. Thermal-vacuum testing of the flight science instruments at the ISIM element level has taken place in three separate highly challenging and extremely complex thermal tests within a gaseous helium-cooled shroud inside Goddard Space Flight Centers Space Environment Simulator. Special data acquisition software was developed for these tests to monitor over 1700 flight and test sensor measurements, track over 50 gradients, component rates, and temperature limits in real time against defined constraints and limitations, and guide the complex transition from ambient to final cryogenic temperatures and back. This extremely flexible system has proven highly successful in safeguarding the nearly $2B science payload during the 3.5-month-long thermal tests. Heat flow measurement instrumentation, or Q-meters, were also specially developed for these tests. These devices provide thermal boundaries o the flight hardware while measuring instrument heat loads up to 600 mW with an estimated uncertainty of 2 mW in test, enabling accurate thermal model correlation, hardware design validation, and workmanship verification. The high accuracy heat load measurements provided first evidence of a potentially serious hardware design issue that was subsequently corrected. This paper provides an overview of the ISIM-level thermal-vacuum tests and thermal objectives; explains the thermal test configuration and thermal balances; describes special measurement instrumentation and monitoring and control software; presents key test thermal results; lists problems encountered during testing and lessons learned.

JWST ISIM Thermal↗

James Webb Space Telescope Integrated Science Instrument Module Calibration and Verification of High-Accuracy Instrumentation to Measure Heat Flow in Cryogenic Testing

The James Webb Space Telescope (JWST) is an upcoming flagship observatory mission scheduled to be launched in 2018. Three of the four science instruments are passively cooled to their operational temperature range of 36K to 40K, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. The requirement for multiple thermal zoned results in the instruments being thermally connected to five external radiators via individual high purity aluminum heat straps. Thermal-vacuum and thermal balance testing of the flight instruments at the Integrated Science Instrument Module (ISIM) element level will take place within a newly constructed shroud cooled by gaseous helium inside Goddard Space Flight Center's (GSFC) Space environment Simulator (SES). The flight external radiators are not available during ISIM-level thermal vacuum/thermal testing, so they will be replaced in test with stable and adjustable thermal boundaries with identical physical interfaces to the flight radiators. Those boundaries are provided by specially designed test hardware which also measures the heat flow within each of the five heat straps to an accuracy of less than 2 mW, which is less than 5% of the minimum predicted heat flow values. Measurement of the heat loads to this accuracy is essential to ISIM thermal model correlation, since thermal models are more accurately correlated when temperature data is supplemented by accurate knowledge of heat flows. It also provides direct verification by test of several high-level thermal requirements. Devices that measure heat flow in this manner have historically been referred to a "Q-meters". Perhaps the most important feature of the design of the JWST Q-meters is that it does not depend on the absolute accuracy of its temperature sensors, but rather on knowledge of precise heater power required to maintain a constant temperature difference between sensors on two stages, for which a table is empirically developed during a calibration campaign in a small chamber at GSFC. This paper provides a brief review of Q-meter design, and discusses the Q-meter calibration procedure including calibration chamber modifications and accommodations, handling of differing conditions between calibration and usage, the calibration process itself, and the results of the tests used to determine if the calibration is successful.

Comber, Brian↗

James Webb Space Telescope Integrated Science Instrument Module Calibration and Verification of High-Accuracy Instrumentation to Measure Heat Flow in Cryogenic Testing

The James Webb Space Telescope (JWST) is an upcoming flagship observatory mission scheduled to be launched in 2018, Three of the four science instruments are passively cooled to their operational temperature range of 36K to 40K, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. The requirement for multiple thermal zones results in the instruments being thermally connected to five external radiators via individual high purity aluminum heat straps. Thermal-vacuum and thermal balance testing of the flight instruments at the Integrated Science Instrument Module (ISIM) element level will take place within a newly constructed shroud cooled by gaseous helium inside Goddard Space Flight Center's (GSFC) Space Environment Simulator (SES). The flight external radiators are not available during ISIM-Ievel thermal vacuum/thermal testing, so they will be replaced in test with stable and adjustable thermal boundaries with identical physical interfaces to the flight radiators. Those boundaries are provided on specially designed test hardware which measures the heat flow within each of the five heat straps to an accuracy of less than 2 m W, which is less than 5% of the minimum predicted heat flow values. This is essential to ISIM thermal model correlation, since thermal models are more accurately correlated when temperature data is supplemented by accurate knowledge of heat flows. Devices that measure heat flow in this manner have historically been referred to as "Q-meters". Perhaps the most important feature of the design of the Q-meters is that it does not depend on the absolute accuracy of its temperature sensors, but rather on a difference in heater power, for which a table is empirically developed during a calibration campaign in a small chamber at GSFC. This paper discusses the Q-meter calibration procedure including calibration chamber modifications and accommodations, the handling of differing conditions between calibration and usage, the calibration process itself, and the results of the tests used to determine if the calibration is successful.

Comber, Brian↗

James Webb Space Telescope Integrated Science Instrument Module Thermal Balance/Thermal Vacuum Test Configuration and Test Planning at NASA's Goddard Space Flight Center

The James Webb Space Telescope (JWST) is the next of the great observatories , scheduled to be launched in 2014. Three of the four science instruments are passively cooled to their operational temperature range of 36K to 40K, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. Thermal-vacuum testing of the flight science instruments at the Integrated Science Instrument Module (ISIM) element level will take place within a newly constructed shroud cooled by gaseous helium inside Goddard Space Flight Center s (GSFC) Space Environment Simulator (SES). The test enclosure surrounding the instruments during the integrated ISIM-level thermal balance testing is complex, and is designed to simulate as closely as possible the in-flight conductive and radiative thermal environment around the ISIM. Thermal control and measurement of parasitic sources of heat leak into the test volume is critical, as the dissipation plus known parasitics in the flight ISIM is approximately 454 mW, and additional parasitics attributed to the flight enclosure itself are nearly equal to this, resulting in the energy balance of the inflight ISIM being less than 1.0 W. Sources of test-induced parasitics must be carefully controlled and measured, and the ability to thermally control the test environment is critical to enable accurate thermal balance testing and thermal model correlation. This paper describes the test configuration and plans for the ISIM-level thermal vacuum/thermal balance testing at GSFC.

Glazer, Stuart↗

Enhancements to the NASA/Goddard Space Flight Center (GSFC) Space Environment Simulator (SES) Facility to Support Cryogenic Testing of the James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM)

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2014. It is directly responsible for the integration and test of the Integrated Science Instrument Module (ISIM), which includes a composite truss structure provided by NASA, and four science instruments sponsored and provided by NASA, the European Space Agency (ESA), the Canadian Space Agency (CSA), and the European Consortium (EC). Three of the four instruments are passively cooled and designed to operate at temperatures in the 36K to 40K range, and the fourth instrument is actively cooled to approximately 6K. The ISIM will undergo several performance tests at various levels of integration in the NASA Goddard Space Flight Center's (GSFC) Space Environment Simulator (SES), GSFC's largest thermal vacuum chamber. These activities range from Cryo-cycling the bare flight composite structure to thermal balance and performance testing of the full ISIM module. This paper describes the enhancements made to the SES chamber in order to support all cryogenic thermal vacuum testing of the ISIM. Upgrades discussed include: design and fabrication of a very large, removable and reconfigurable helium shroud; a new valve box permitting independent flow control of gaseous helium (GHe) to up to ten zones; and development of in-situ 3-dimensional photogrammetry capability in a cryogenic environment. Also presented will be select results from several facility tests already conducted to verify the chamber capabilities and optimize operational procedures, including the Helium Shroud -03 Configuration Acceptance Test, and the Helium Shroud -01 Configuration Chamber Certification Test.

Cleveland, Paul↗

JWST ISIM Harness Thermal Evaluation

The James Webb Space Telescope (JWST) will be a large infrared telescope with a 6.5-meter primary mirror. Launch is planned for 2013. JWST wl1 be the premier observatory of the next decade serving thousands of astronomers worldwide. The Integrated Science Instrument Module (ISIM) is the unit that will house thc four main JWST instruments. The ISIM enclosure passively cooled to 37 Kelvin and has a tightly managed thermal budget. A significant portion of the ISIM heat load is due to parasitic heat gains from the instrument harnesses. These harnesses provide a thermal path from the Instrument Electronics Control (IEC) to the ISIM. Because of the impact of this load to the ISIM thermal design, understanding the harness parasitic heat gains is critical. To this effect, a thermal test program has been conducted in order to characterize these parasitic loads and verify harness thermal models. Recent parasitic heat loads tests resulted in the addition of a dedicated multiple stage harness radiator. In order for the radiator to efficiently reject heat from the harness, effective thermal contact conductance values for multiple harnesses had to be determined. This presentation will describe the details and the results of this test program.

Kobel, Mark↗

James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM) Cryogenic Component Test Facility

Contents include the following: James Webb Space Telescope/Integrated Science Instrument Module (JWST/ISIM) Overview. ISIM Thermal Verification Requirements. Emittance Test Objectives. Cryochamber Design Requirements. Cryochamber Construction. Emittance Test Sample Selection and Configuration. Error Sources and Error Mitigation. Cryochamber Operation. Cryochamber and Emittance Sample Test Results.

Packard, Edward A.↗

Infrared radiometric technique for rapid quantitative evaluation of heat flux distribution over large areas

This paper describes a novel approach for rapid, quantitative measurement of spatially distributed heat flux incident on a plane. The technique utilizes the spatial temperature distribution on an opaque thin film at the location of interest, as measured by an imaging infrared radiometer. Knowledge of film radiative properties, plus quantitative estimates of convection cooling permit the steady state energy balance at any location on the film sheet to be solved for the incident heat flux. Absolute accuracies on the order of 10-15 percent have been obtained in tests performed in air. The method is particularly useful for evaluation of spatial heat flux uniformity from distributed heat sources over large areas. It has recently been used in several applications at the Jet Propulsion Laboratory, including flux uniformity measurements from large distributed quartz lamp arrays used during thermal vacuum testing of several spacecraft components, and flux mapping of a low power NdYg laser beam.