Search NASA⌕ Search

Engineering topics

Glover, J.

Publications and source records attributed to Glover, J..

Establishing the Quality Assurance programme for the strip sensor production of the ATLAS tracker upgrade including irradiation with neutrons, photons and protons to HL-LHC fluences

The successful pre-production delivery of strip sensors for the new Inner Tracker (ITk) for the upgraded ATLAS detector at the High Luminosity LHC (HL-LHC) at CERN was completed and based on their performance full production has commenced. The overall delivery period is anticipated to last 4 years to complete the approximately 22000 sensors required for the ITk. For Quality Assurance (QA), a number of test structures designed by the collaboration, along with a large area diode and miniature version of the main sensor, are produced in every wafer by the foundry Hamamatsu Photonics K.K (HPK). As well as Quality Control (QC) checks on every main sensor, samples of the QA pieces from each delivery batch are tested both before and after irradiation with results after exposure to neutrons, gammas or protons to fluences and doses corresponding to those anticipated after operation at the HL-LHC to roughly 1.5 times the ultimate integrated luminosity of 4000 fb -1 . In this paper the procedures are presented and the studies carried out to establish that the seven ITk QA Strip Sensor irradiation and test sites meet all the requirements to support this very extensive programme throughout the strip sensor production phase for the ITk project.

47 OTHER INSTRUMENTATION↗

The ABC130 barrel module prototyping programme for the ATLAS strip tracker

For the Phase-II Upgrade of the ATLAS Detector [1], its Inner Detector, consisting of silicon pixel, silicon strip and transition radiation sub-detectors, will be replaced with an all new 100% silicon tracker, composed of a pixel tracker at inner radii and a strip tracker at outer radii. The future ATLAS strip tracker will include 11,000 silicon sensor modules in the central region (barrel) and 7,000 modules in the forward region (end-caps), which are foreseen to be constructed over a period of 3.5 years. The construction of each module consists of a series of assembly and quality control steps, which were engineered to be identical for all production sites. In order to develop the tooling and procedures for assembly and testing of these modules, two series of major prototyping programs were conducted: an early program using readout chips designed using a 250 nm fabrication process (ABCN-250) [2,2] and a subsequent program using a follow-up chip set made using 130 nm processing (ABC130 and HCC130 chips). This second generation of readout chips was used for an extensive prototyping program that produced around 100 barrel-type modules and contributed significantly to the development of the final module layout. This paper gives an overview of the components used in ABC130 barrel modules, their assembly procedure and findings resulting from their tests.

47 OTHER INSTRUMENTATION↗

Strip sensor performance in prototype modules built for ATLAS ITk

ATLAS experiment is preparing an upgrade of its detector for High-Luminosity LHC (HL-LHC) operation. The upgrade involves installation of the new all-silicon Inner Tracker (ITk). In the context of the ITk preparations, more than 80 strip modules were built with prototype barrel sensors. They were tested with electrical readout on a per-channel basis. In general, an excellent performance was observed, consistent with previous ASIC-level and sensor-level tests. However, the lessons learned included two phenomena important for the future phases of the project. First was the need to store and test the modules in a dry environment due to humidity sensitivity of the sensors. The second was an observation of high noise regions for 2 modules. The high noise regions were tested further in several ways, including monitoring the performance as a function of time and bias voltage. Additionally, direct sensor-level tests were performed on the affected channels. The inter-strip resistance and bias resistance tests showed low values, indicating a temporary loss of the inter-strip isolation. A subsequent recovery of the noise performance was observed. Here we present the test details, an analysis of how the inter-strip isolation affects the module noise, and the relationship with sensor-level quality control tests.

47 OTHER INSTRUMENTATION↗