Search NASA⌕ Search

Engineering topics

Gomez, Susan

Publications and source records attributed to Gomez, Susan.

Relaxing USOS Solar Array Constraints for Russian Vehicle Undocking

With the retirement of Space Shuttle cargo delivery capability and the ten year life extension of the International Space Station (ISS) more emphasis is being put on preservation of the service life of ISS critical components. Current restrictions on the United States Orbital Segment (USOS) Solar Array (SA) positioning during Russian Vehicle (RV) departure from ISS nadir and zenith ports cause SA to be positioned in the plume field of Service Module thrusters and lead to degradation of SAs as well as potential damage to Sun tracking Beta Gimbal Assemblies (BGA). These restrictions are imposed because of the single fault tolerant RV Motion Control System (MCS), which does not meet ISS Safety requirements for catastrophic hazards and dictates 16 degree Solar Array Rotary Joint position, which ensures that ISS and RV relative motion post separation, does lead to collision. The purpose of this paper is to describe a methodology and the analysis that was performed to determine relative motion trajectories of the ISS and separating RV for nominal and contingency cases. Analysis was performed in three phases that included ISS free drift prior to Visiting Vehicle separation, ISS and Visiting Vehicle relative motion analysis and clearance analysis. First, the ISS free drift analysis determined the worst case attitude and attitude rate excursions prior to RV separation based on a series of different configurations and mass properties. Next, the relative motion analysis calculated the separation trajectories while varying the initial conditions, such as docking mechanism performance, Visiting Vehicle MCS failure, departure port location, ISS attitude and attitude rates at the time of separation, etc. The analysis employed both orbital mechanics and rigid body rotation calculations while accounting for various atmospheric conditions and gravity gradient effects. The resulting relative motion trajectories were then used to determine the worst case separation envelopes during the clearance analysis. Analytical models were developed individually for each stage and the results were used to build initial conditions for the following stages. In addition to the analysis approach, this paper also discusses the analysis results, showing worst case relative motion envelopes, the recommendations for ISS appendage positioning and the suggested approach for future analyses.

Menkin, Evgeny↗

Three Years of Global Positioning System Experience on International Space Station

The International Space Station global positioning system (GPS) receiver was activated in April 2002. Since that time, numerous software anomalies surfaced that had to be worked around. Some of the software problems required waivers, such as the time function, while others required extensive operator intervention, such as numerous power cycles. Eventually enough anomalies surfaced that the three pieces of code included in the GPS unit have been re-written and the GPS units upgraded. The technical aspects of the problems are discussed, as well as the underlying causes that led to the delivery of a product that has had so many problems. The technical aspects of the problems included physical phenomena that were not well understood, such as the affect that the ionosphere would have on the GPS measurements. The underlying causes were traced to inappropriate use of legacy software, changing requirements, inadequate software processes, unrealistic schedules, incorrect contract type, and unclear ownership responsibilities..

Gomez, Susan↗

Three Years of Global Positioning System Experience on International Space Station

The International Space Station global positioning systems (GPS) receiver was activated in April 2002. Since that time, numerous software anomalies surfaced that had to be worked around. Some of the software problems required waivers, such as the time function, while others required extensive operator intervention, such as numerous power cycles. Eventually, enough anomalies surfaced that the three pieces of code included in the GPS unit have been re-written and the GPS units were upgraded. The technical aspects of the problems are discussed, as well as the underlying causes that led to the delivery of a product that has had numerous problems. The technical aspects of the problems included physical phenomena that were not well understood, such as the affect that the ionosphere would have on the GPS measurements. The underlying causes were traced to inappropriate use of legacy software, changing requirements, inadequate software processes, unrealistic schedules, incorrect contract type, and unclear ownership responsibilities.

Gomez, Susan↗

A Post-Flight Comparison Between GPS Signal Generator and On-Orbit Testing Results from the STS-101 and STS-106 SOAR Shuttle Flight Experiment

The use of a GPS Signal Generator (GPSSG) prior to launch for verification of a GPS subsystem and GN&C system on a spacecraft is becoming a very common practice. The level of confidence in the verification created by running a receiver with a GPSSG can greatly impact both schedule and cost of spacecraft development. This paper addresses the comparison of the Space Shuttle STS-101 and STS-106 Space Integrated GPS/INS (SIGI) Orbital Attitude Readiness (SOAR) flight experiments on-orbit performance with the performance from the same receiver on a Global Simulation Systems (GSS) GPSSG. The SOAR flight experiment was designed to demonstrate on-orbit performance of the International Space Station Force-19 GPS receiver. This paper discusses the process involved in getting the post-flight Best Estimate of Trajectory and Best Estimate of Attitude into the GPSSG such that the Force-19 receiver will experience the same trajectory and environmental conditions as observed during the SOAR flight experiment. Results of the comparison conclude with recommendations of how better to construct and interpret results from receiver tests using a GSS GPSSG.

Simpson, James↗