Search NASASearch

Engineering topics

Goodson, Troy

Publications and source records attributed to Goodson, Troy.

Charting a course to the sun: flight path control for Parker Solar Probe

The successful launch of the Parker Solar Probe (PSP) on August 12, 2018 with a Delta IV rocket and Star-48BV third stage has placed the spacecraft on a 7-year trajectory to study the Sun. The goals of PSP are to better characterize our solar environment and advance our understanding of the Sun at 9.86 Rs. A total of 42 trajectory correction maneuvers are planned. This paper documents trajectory correction maneuver analysis performed just prior to launch until just past the first solar encounter. The pre-launch analysis culminated in two final design cycles which analyzed 24 reference trajectories.

Ryne, Mark

Orbit Determination Covariance Analyses for the Parker Solar Probe Mission

This paper details pre-launch navigation covariance analyses for the Parker Solar Probe mission. Baseline models and error assumptions are outlined. The results demonstrate how navigation will satisfy requirements and are used to define operational plans. A few sensitivities are identified and the accompanying investigations are described. Predicted state uncertainty results show that most requirements are met with substantial margin. Moreover, navigation sensitivities may be accommodated operationally and this has been incorporated into project planning. Detailed results are presented only for select launch dates, however twenty unique trajectories (one per launch opportunity) have been assessed.

Jones, Drew Ryan

Flight Path Control Analysis for Parker Solar Probe

An unprecedented NASA mission to study the Sun, known as Parker Solar Probe (PSP), is under development. The primary objective of the PSP mission is to gather new data within 10 solar radii of the Sun’s center. The purpose of this paper is to review the statistical analysis of trajectory correction maneuvers (TCMs) for PSP’s baseline trajectory. The baseline mission includes a total of 42 TCMs that will be accomplished with a monopropellant propulsion system that consists of twelve 4.4 N thrusters. Assuming current navigation models, statistical analyses for each reference trajectory during the 20-day launch period result in a total V99 of less than 100 m/s.

Mottinger, Neil

Parker Solar Probe Navigation: one year from launch

Parker Solar Probe (PSP) will be the first spacecraft designed to fly deep within the Sun’s lower corona and also becoming the fastest spacecraft flown. Launch is scheduled for next year, with a 20-day launch period beginning on 31 July 2018. PSP will be on a ballistic trajectory, requiring seven Venus flybys to progressively lower the perihelion over the seven-year mission. This near-solar environment can be particularly challenging from a spacecraft design as well as a navigation perspective. We discuss an overview of the mission along with some of the particular challenges in navigating PSP.

Valerino, Powtawche

Solar Probe Plus: Unique Navigation Modeling Challenges

The Solar Probe Plus (SPP) mission is preparing to launch in 2018, and will directly investigate the outer atmosphere of our star. At 9.86 solar radii, SPP must operate in an unexplored regime. The environment and aspects of the mission design present some unique challenges for navigation, particularly in terms of modeling the dynamics. Non-gravitational force models, unique to this mission, are given with analytical expressions. For each of these models (and error sources), a maximum bound on the force perturbation magnitude is quantified numerically. Additionally, the effect of charged particles on radiometric observables is discussed, along with methods being employed to pre-process the measurements. This survey is an overview of unique modeling employed by SPP navigation, but also a reference for future missions traveling near the Sun.

Jones, Drew Ryan

Maneuver Automation Software

The Maneuver Automation Software (MAS) automates the process of generating commands for maneuvers to keep the spacecraft of the Cassini-Huygens mission on a predetermined prime mission trajectory. Before MAS became available, a team of approximately 10 members had to work about two weeks to design, test, and implement each maneuver in a process that involved running many maneuver-related application programs and then serially handing off data products to other parts of the team. MAS enables a three-member team to design, test, and implement a maneuver in about one-half hour after Navigation has process-tracking data. MAS accepts more than 60 parameters and 22 files as input directly from users. MAS consists of Practical Extraction and Reporting Language (PERL) scripts that link, sequence, and execute the maneuver- related application programs: "Pushing a single button" on a graphical user interface causes MAS to run navigation programs that design a maneuver; programs that create sequences of commands to execute the maneuver on the spacecraft; and a program that generates predictions about maneuver performance and generates reports and other files that enable users to quickly review and verify the maneuver design. MAS can also generate presentation materials, initiate electronic command request forms, and archive all data products for future reference.

Uffelman, Hal

Navigational Use of Cassini Delta V Telemetry

Telemetry data are used to improve navigation of the Saturn orbiting Cassini spacecraft. Thrust induced delta V's are computed on-board the spacecraft, recorded in telemetry, and downlinked to Earth. This paper discusses how and why the Cassini Navigation team utilizes spacecraft delta V telemetry. Operational changes making this information attractive to the Navigation Team will be briefly discussed, as will spacecraft hardware and software algorithms responsible for the on-board computation. An analysis of past delta V telemetry, providing calibrations and accuracies that can be applied to the estimation of future delta V activity, is described.

Roth, Duane C.

Cassini-Huygens maneuver automation for navigation

Many times during the Cassini-Huygens mission to Saturn, propulsive maneuvers must be spaced so closely together that there isn't enough time or workforce to execute the maneuver-related software manually, one subsystem at a time. Automation is required. Automating the maneuver design process has involved close cooperation between teams. We present the contribution from the Navigation system. In scope, this includes trajectory propagation and search, generation of ephemerides, general tasks such as email notification and file transfer, and presentation materials. The software has been used to help understand maneuver optimization results, Huygens probe delivery statistics, and Saturn ring-plane crossing geometry. The Maneuver Automation Software (MAS), developed for the Cassini-Huygens program enables frequent maneuvers by handling mundane tasks such as creation of deliverable files, file delivery, generation and transmission of email announcements, generation of presentation material and other supporting documentation. By hand, these tasks took up hours, if not days, of work for each maneuver. Automated, these tasks may be completed in under an hour. During the cruise trajectory the spacing of maneuvers was such that development of a maneuver design could span about a month, involving several other processes in addition to that described, above. Often, about the last five days of this process covered the generation of a final design using an updated orbit-determination estimate. To support the tour trajectory, the orbit determination data cut-off of five days before the maneuver needed to be reduced to approximately one day and the whole maneuver development process needed to be reduced to less than a week..

propulsion maneuvers

Cassini - Huygens maneuver experience : cruise and arrival at Saturn

The Cassini-Huygens mission to Saturn and Titan was launched in 1997. It is an international effort to study the Saturnian system. Cassini-Huygens' interplanetary cruise delivered the spacecraft to Saturn in 2004. It also made use of many propulsive maneuvers, both statistical and deterministic. Maneuver-related analysis and performance for latter half of cruise is reported. The system has performed more accurately than the pre-launch expectations and requirements. Additionally, some maneuvers have already been skipped, saving propellant and flight team effort. Analysis of historical execution error data is presented.

Huygens

Cassini tour navigation strategy

The Cassini-Huygens spacecraft was launched on October 15, 1997 as a joint NASA/ESA mission to explore Saturn. After a 7 year cruise the spacecraft will enter orbit around Saturn on 1 July 2004 for a 4 year investigation of the Saturnian system. The Cassini Navigation Team is responsible for designing the reference trajectory and conducting operations to realize this design. This paper describes the strategy for achieving project requirements, the characteristics of the Cassini navigation challenge, and the underlying assumptions.

Saturn

Cassini tour navigation strategy

This paper describes the strategy for achieving project requirements, the characteristics of the Cassini navigation challenge, and the underlying assumptions.

Cassini