Search NASASearch

Engineering topics

Goodwin, P. S.

Publications and source records attributed to Goodwin, P. S..

At least 19 records

Helios mission support

Activities of the DSN Network Operations Organization in support of the Helios Project from 15 August 1978 through 15 October 1978 are reported.

Goodwin, P. S.

Helios mission support

Deep Space Network support of Helios mission operations is discussed. Included is information on the Helios 1, 7th aphelion, Helios 2, 5th aphelion, science experiments, 22-bit error polynomial code (EPC) testing, and other mission-related activities. Mission operations and status are summarized and specific correction commands are described. Special activities and experiments include Faraday rotation data collection and a solar wind tracks experiment.

Goodwin, P. S.

Helios mission support

Deep Space Network support of Helios mission operations includes information on Helios-1's seventh perihelion, Helios-2's fifth perihelion, and other mission-related activities.

Goodwin, P. S.

Helios mission support

Activities of the DSN network operations organization in support of the Helios Project from February 15, 1978 through April 15, 1978 are reported. Mark 3 data subsystems (MDS) testing at the Deep Space Station 2 (Goldstone, Calif.) is included.

Goodwin, P. S.

Helios mission support

Activities of the Deep Space Network Operations organization in support of the Helios Project from 15 October 1977 through 15 December 1977 are described. Topics covered include: (1) Mark 3 data subsystem testing at the conjoint Deep Space Stations (DSS) 42/43 (Canberra, Australia); (2) MDS implementation at DSS 61/63 (Madrid, Spain); (3) Radio Science update, and (4) other mission-related activities.

Goodwin, P. S.

Helios mission support

Activities of the Network Operations organization in support of the Helios Project from 15 August 1977 through 15 October 1977 are reported. Included in this article is information on the Mark 3 Data Subsystem update at the conjoint Deep Space Station 42/43 complex (Canberra, Australia), an update on Radio Science Activities, and other mission-oriented activities.

Goodwin, P. S.

Helios mission support

Activities of the Deep Space Network in support of the Helios project from 15 April through 15 June 1977 are reported. Information concerning Helios-2's superior conjunction period, Faraday rotation experimentation during solar conjunction, updated Mark III data system status, and other mission oriented activities is included.

Goodwin, P. S.

Helios mission support

Deep Space Network coverage of Helios-1 and Helios-2 from Feb. 1 through Apr. 15, 1977 is presented in tabular form. Mark III data system (MDS) performance and station modifications for MDS configuration are discussed. Cross support for Helios operations by DSN and STDN is described and their downlink performances compared.

Goodwin, P. S.

Helios mission support

Activities of the network operations organization are reported in support of the Helios Project during December 1976 and January 1977.

Goodwin, P. S.

Helios mission support

Activities of the Network Operations organization in support of the Helios project during October and November 1976 is reported.

Goodwin, P. S.

Helios mission support

The Helios-1 third solar occultation and fourth perihelion is covered. A Helios-2 spacecraft emergency and third solar conjunction (occultation) are also discussed. Additional topics include STDN-DSN telemetry and command cross-support, Ground Data System tests, tracking coverage, plus DSN system performance for August and September 1976.

Goodwin, P. S.

Helios mission support

Deep Space Network support of the Helios mission is reported. Downlink signal degradation on the Helios-1 spacecraft and occultation of Helios-2 are discussed. Capability and performance of the network are assessed.

Goodwin, P. S.

Helios mission support

The successful flight of the Helios-1 spacecraft continues as it approaches its third aphelion. The Helios-2 spacecraft has entered its first superior conjunction and continues in excellent health. Much valuable scientific information about the solar corona and its effects on electromagnetic waves is expected to be learned from data gathered during this superior conjunction.

Goodwin, P. S.

Tracking and data systems support for the Helios project. Volume 1: Project development through end of mission, phase 2

The overall evolution of the Helios Project is summarized from its conception through to the completion of the Helios-1 mission phase 2. Beginning with the project objectives and concluding with the Helios-1 spacecraft entering its first superior conjunction (end of mission phase 2), descriptions of the project, the mission and its phases, international management and interfaces, and Deep Space Network-spacecraft engineering development in telemetry, tracking, and command systems to ensure compatibility between the U.S. Deep Space Network and the German-built spacecraft are included.

Goodwin, P. S.

Helios mission support

With Helios-1 completing its third perihelion and Helios-2 passing its first perihelion, much valuable scientific data were obtained about the inter-earth-sun regions. The first solar occultation of Helios-2 is anxiously awaited as the next important mission phase. Preparations are underway for Helios-2 first entry into solar occultation in mid-May 1976. This article reports on the activities around Helios-1 and -2 perihelions.

Goodwin, P. S.

Deep space network

Background, current status, and sites of Deep Space Network stations are briefly discussed.

Flanagan, F. M.