Challenges and Practical Solutions for Conducting Structural MARSSIM Surveys in Elevated Radon Environments - 20413

The Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) [1] provides comprehensive guidance for the development and implementation of radiological surveys conducted to demonstrate compliance with a dose- or risk-based cleanup goal during final status survey. The MARSSIM methodology follows an integrated strategy combining direct measurements and sampling to assess uniform residual contamination, and scanning surveys to identify localized areas of elevated activity. Building surveys assessing residual surface contamination present unique challenges from reliance on field measurements that may be subject to less than ideal environmental conditions. Additionally, limited characterization and excessive conservatism incorporated into the conceptual site model may result in derived concentration guideline levels (DCGL) and, as a consequence of relatively inefficient field instrumentation, corresponding attributable count rates generally comparable to background. The presence of elevated ambient radon concentrations and associated progeny deposition both exacerbate these intrinsic survey challenges and introduce a series of technical, logistic, and administrative obstacles that can wreak havoc on the statistical legitimacy of each component of the MARSSIM process. Short-lived radon progeny including polonium-218, lead-214, bismuth-214, and polonium-214 produce excessive alpha and beta radiation that may decrease instrument sensitivity through an increase in background count rates, and, at worst, may result in incorrect survey unit failure through the simulation of residual surface activity. Aside from the obvious solution of exhaustive radon mitigation, the primary objectives are to distinguish between radon progeny deposition and actual surface activity, and collect sufficient defensible data. The following is a technical discussion of the consequences of performing building MARSSIM surveys in the presence of elevated ambient radon atmospheres, conceptual examples, and an overview of practical strategies to minimize the effects of radon interference while collecting sufficient defensible data to complete the survey. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GIS-Based Modeling of Contaminated Soil Volumes at Multiple Sites in the Formerly Utilized Sites Remedial Action Program - 20149

The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)