Search NASA⌕ Search

Engineering topics

Graham, Max

Publications and source records attributed to Graham, Max.

Hydrogen Sustainable Infrastructure Guidelines (H2SIG)

Infrastructure interacts with major global challenges inclusive of climate change, resilience, equity and social justice, environmental protection and biodiversity, public health, and economic recovery. This effort directly addresses how to apply sustainability assessments to the unique aspects of hydrogen (H2) infrastructure projects using the Envision® sustainability framework developed by the Institute for Sustainable Infrastructure (ISI). Envision is a flexible system of criteria and performance objectives to aid decision makers and help project teams identify sustainable approaches during planning, design and construction of infrastructure projects that will continue throughout the project’s operations, maintenance, and end-of-life phases. The goal of this work is to support those interested in conducting sustainability assessments for hydrogen infrastructure projects. Through this work the team has developed hydrogen-specific guidelines and best practices to assist project developers, investors and regulators in straightforward application of the Envision framework to systematically enhance clarity and increase objectivity across hydrogen projects. Subject matter experts from 20 different organizations (industry, non-profits, municipalities, emissions regulators, national labs) were engaged through 7 focus groups to discuss the H2-prioritized Envision requirements and elements to be included in the guidelines. In addition to these guidelines, the team conducted case studies as a way of demonstrating and informing the guidelines and providing examples or ideas for implementing sustainability in future projects. Through this study, the authors found that hydrogen infrastructure projects can incorporate many sustainable practices including reducing GHG emissions affecting climate change, reducing air pollutant emissions affecting the health of communities, synergistically handling waste byproducts, integrating into existing infrastructure, incorporating renewable energy, and addressing equity and environmental justice. Additionally, hydrogen infrastructure projects could benefit from 2-way communication engagement and collaborative planning with stakeholders, educational awareness of hydrogen technology, tracking and reporting on water use and water quality, and including monetized environmental and social benefits in life-cycle cost estimates. This document is the final technical report for the Hydrogen Sustainability Assessment Methods for Project Development project. While the main focus of the report is to provide guidelines for applying sustainability to hydrogen infrastructure, there are sections within the appendix providing completed project tasks and methodology.

08 HYDROGEN↗

First-Principles Cost Estimation of a Sodium Fast Reactor Nuclear Plant

A multi-tiered cost analysis is performed to estimate full costs of a nuclear power plant (NPP) based on sodium-cooled fast reactor (SFR) technology. To address the lack of fully transparent cost estimations from past undertakings for NPPs, we have developed a detailed and first-principles-based cost estimate for a generalized SFR NPP. Our intent is to achieve a high degree of transparency with our cost assumptions and develop a cost model that is flexible and easily extendable to variations in NPP design and other nuclear reactor types. Furthermore, we strive to achieve a clear organization of costs and complete identification of key cost drivers based on first principles. To this end, the cost results of our analysis as given in Table 24 and Table 25 are organized and categorized into a code of accounts (COA) under development at Idaho National Laboratory (INL). Varying degrees of first-principles methods are employed, such as design for manufacture and assembly® (DFMA® ), to elucidate costs in all process levels of the plant equipment, buildings and site structures, personnel, and other miscellaneous but significant cost elements. These approaches have been successfully applied in past cost analysis projects and are designed to enable rapid and flexible cost estimation. Application of these techniques for evaluating NPP costs is similar in concept to the full, detailed estimation of construction and fabrication costs determined in a later stage of NPP development. Note that our approach tries to avoid use of other past analysis results and data such as those from the legacy Energy Economic Data Base (EEDB) Program, as these resources are based on historical NPP costs and thus may not be indicative of new reactor technologies or construction and fabrication/manufacturing techniques. However, we provide a comparison of our SFR NPP cost results in Table 90 against those included in the EEDB for a representative pressurized water reactor (PWR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗