Search NASA⌕ Search

Engineering topics

Greacen, Chris

Publications and source records attributed to Greacen, Chris.

Quality Assurance Framework Implementation Guide for Isolated Community Power Systems

This implementation guide is a companion document to the 'Quality Assurance Framework for Mini-Grids' technical report. This document is intended to be used by one of the many stakeholder groups that take part in the implementation of isolated power systems. Although the QAF could be applied to a single system, it was designed primarily to be used within the context of a larger national or regional rural electrification program in which many individual systems are being installed. This guide includes a detailed overview of the Quality Assurance Framework and provides guidance focused on the implementation of the Framework from the perspective of the different stakeholders that are commonly involved in expanding energy development within specific communities or regions. For the successful long-term implementation of a specific rural electrification program using mini-grid systems, six key stakeholders have been identified that are typically engaged, each with a different set of priorities 1. Regulatory agency 2. Governmental ministry 3. System developers 4. Mini-utility 5. Investors 6. Customers/consumers. This document is broken into two distinct sections. The first focuses on the administrative processes in the development and operation of community-based mini-grid programs, while the second focuses on the process around the installation of the mini-grid project itself.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Guidebook on Grid Interconnection and Islanded Operation of Mini-Grid Power Systems Up to 200 kW

A Guidebook on Grid Interconnection and Islanded Operation of Mini-Grid Power Systems Up to 200 kW is intended to help meet the widespread need for guidance, standards, and procedures for interconnecting mini-grids with the central electric grid as rural electrification advances in developing countries, bringing these once separate power systems together. The guidebook aims to help owners and operators of renewable energy mini-grids understand the technical options available, safety and reliability issues, and engineering and administrative costs of different choices for grid interconnection. The guidebook is intentionally brief but includes a number of appendices that point the reader to additional resources for indepth information. Not included in the scope of the guidebook are policy concerns about “who pays for what,” how tariffs should be set, or other financial issues that are also paramount when “the little grid connects to the big grid.”

25 ENERGY STORAGE↗