Understanding Line Losses and Transformer Losses in Rural Isolated Distribution Systems

Rural, isolated power systems in the mainland U.S. and in states like Alaska and Hawaii are powered by assets like diesel generators. These rural, isolated power systems also cannot operate at the higher band of medium voltage (like 69kV). They are primarily in the 12 to 14 kV range to keep the cost of the distribution investments lower. Because of this mid-band medium voltage range, the line losses and distribution transformers losses consume significant diesel consumption (almost 10 percent of the peak load). This work considers one such power system powering an isolated system and presents key findings online losses, and transformer losses. Understanding and documenting the impacts is critical for these communities operating their power systems and take actions to reduce expensive diesel consumption. In this paper, we will present one such typical grid and model it in electromagnetic transients (EMT) domain. We used the tower structure, under ground cabling installation to develop high fidelity models of lines. We also used high fidelity models of distribution transformers to present the no-load losses and full load loses. We will also present technical solutions available commercially off-the-shelf to reduce these losses and reduce diesel consumption. This work will be a primer for communities to understand the technical challenges and to understand the possible solution available to solve such challenges for rural, isolated power system operators.

blackstart↗

Hydropower Supply Chain Gap Analysis

In 2022, DOE conducted supply chain "deep dives" for renewable energy technologies, including hydropower (Uria-Martinez, Hydropower Industry Supply Chain Deep Dive Assessment 2022). The deep dive identified several challenges in the current hydropower supply chain. In addition, Nguyen et. al (2022) conducted an analogous deep-dive assessment on large (> 100-MW) power transformers (LPTs), a critical component of hydropower installations, and concluded that the LPTs as well as several upstream components and materials also have domestic supply chain challenges. These deep dives were the initial high-level assessments of these supply chains and were focused on identifying the biggest issues. Both recommended further investigation. In the two years since the deep dives were published, the Water Power Technologies Office (WPTO) has focused on improving our understanding of the hydropower supply chain and developing strategies for addressing these challenges. Because the challenges outlined above are most acute for large hydropower systems, most of the report and specifically, this report concentrates on the larger > 100-MW hydropower systems. Early in 2023, DOE's Secretary of Energy asked the Water Power Technologies Office (WPTO) to engage the hydropower community and seek input on strategies to secure and encourage domestic manufacturing. WPTO has established three focus areas for engagement: 1) Define the market for planned rehabilitations and new construction of the domestic fleet, 2) Provide insights for policies, incentives, loan programs, and technology investments to encourage domestic content, and 3) Define the existing and required domestic hydropower manufacturing capabilities and workforce. This report summarizes these efforts and complements the earlier work by further exploring the identified challenges and identifying potential actions to address these challenges. Furthermore, we conducted a detailed gap analysis of the domestic hydropower supply chain, down to the component level. From this analysis, we then make specific, actionable recommendations for closing these gaps. Section 2 of the report summarizes recent (i.e., since 2021) legislation impacting hydropower deployment and/or its supply chain. It then describes the efforts of WPTO to assess and improve the hydropower supply chain since the publication of the deep-dive assessments. In Section 3, the report updates the earlier supply chain and market studies, identifying specific capabilities by company and location. Section 4 outlines the hydropower demand signal for both new builds due to clean energy goals as well as refurbishments and upgrading of the current domestic fleet. Section 5 is a detailed gap analysis while Section 6 provides actionable recommendations for closing the gaps. Section 7 concludes the report by linking the recommendations to the identified gaps and discusses future efforts.

13 HYDRO ENERGY↗

Hydropower Investment and Public-Private Ecosystem Assessment

The U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO) commissioned this Report to evaluate the primary challenges in raising investment in medium-sized hydropower and PSH, defined as projects with five (5) to 30 megawatts (MW) of installed capacity, and to understand potential opportunities to increase mobilization of private sector investment in hydropower and PSH projects in the future. Based on stakeholder interviews, a market survey, and industry reports, this Report considers the investment and development trends and future opportunities for five hydropower project types: capacity additions, conduits, PSH (both open and closed loop), non-powered dams (NPDs), and new stream-reach development (NSD).

13 HYDRO ENERGY↗

Understanding Line Losses and Transformer Losses in Rural Isolated Distribution Systems: Preprint

Rural, isolated power systems in the mainland U.S. and in states like Alaska and Hawaii are powered by assets like diesel generators. These rural, isolated power systems also cannot operate at the higher band of medium voltage (like 69kV). They are primarily in the 12 to 14 kV range to keep the cost of the distribution investments lower. Because of this mid-band medium voltage range, the line losses and distribution transformers losses consume significant diesel consumption (almost 10 percent of the peak load). This work considers one such power system powering an isolated system and presents key findings online losses, and transformer losses. Understanding and documenting the impacts is critical for these communities operating their power systems and take actions to reduce expensive diesel consumption. In this paper, we will present one such typical grid and model it in electromagnetic transients (EMT) domain. We used the tower structure, under ground cabling installation to develop high fidelity models of lines. We also used high fidelity models of distribution transformers to present the no-load losses and full load loses. We will also present technical solutions available commercially off-the-shelf to reduce these losses and reduce diesel consumption. This work will be a primer for communities to understand the technical challenges and to understand the possible solution available to solve such challenges for rural, isolated power system operators.

blackstart↗

FAST Equipment Lease with Liberty University, Inc. (Cooperative Research and Development Final Report)

Liberty University, Inc. (Participant) will receive government owned equipment from NREL to evaluate and perform fatigue testing of bladders in use for small scale pumped storage hydropower. NREL is providing technical support to advance Liberty University's pumped storage hydropower (PSH) concept towards commercialization. The concept creates modular upper and lower watertight enclosures (tanks or reservoirs) connected by a series of modular pipe lengths (penstock).

13 HYDRO ENERGY↗

1.2.4.403 - Pumped Storage Hydropower FAST Commissioning Prize

The Pumped Storage Hydropower (PSH) FAST Commissioning Prize aimed to reduce the time, cost, and risk required to commission PSH projects by crowdsourcing ideas via a three-stage prize. Objectives were to reduce the time to commission PSH projects from 10+ years to less than 5 years and to develop a baseline analysis for PSH.

HYDRO ENERGY↗

1.1.1.401 - Groundbreaking Hydro and I AM Hydro Prizes

The Hydropower Geotechnical Foundations Prize ("Groundbreaking Hydro Prize") offered a total of $300,000 in cash prizes to elicit and advance innovative concepts for low-head (up to 30 ft of hydraulic head) hydropower geotechnical foundation technologies. The Innovations in Advanced Manufacturing for Hydro (I AM Hydro) prize sought to identify new ideas with the potential to have a disruptive impact in the hydropower industry and offered up to $250,000 in cash prizes.

HYDRO ENERGY↗

1.4.1.401 - Fish Protection Prize

The Fish Protection Prize sought new solutions, designs, and strategies to prevent fish from swimming into water infrastructure, such as water diversions and pipes and intakes at hydropower dams. Participants submitted innovative ideas to advance fish exclusion technology. WPTO collaborated with the U.S. Bureau of Reclamation on the Fish Protection Prize to inspire innovators to compete for $700,000 of combined cash prizes and voucher support to help protect fish from these threats. Five experts in fish passage and protection served as reviewers in the Pitch Contest, and represented a number of Federal and State agencies, including NOAA, USGS, ORNL, Washington Department of Fish and Wildlife, and AFS. Three finalists were selected as Grand Prize winners.

fish passage↗

NREL Waves to Water Prize Program: Sensitivity Analysis of Alternative Markets

Isle Inc., in collaboration with Engineering for Change (project team), performed a Sensitivity Analysis of market alternatives to evaluate commercialization barriers for the Waves to Water (W2W) competitors. This analysis included interviews with organizations and end-users in three market categories (1) Disaster Relief, (2) Commercial/Industrial, and (1) Municipal, Residential, and Government. For each category, the project team selected organizations that provided a well rounded experience and set of drivers for adopting W2W technologies. In addition to the project team's efforts, fellows from NREL/DOE completed interviews with government organizations to understand their potential to engage with W2W technologies, and these findings are summarized in a separate summary document.

16 TIDAL AND WAVE POWER↗

New Industry Partnerships: Solar Energy Technologies Office Support for Early Projects in the Energy Systems Integration Facility: An Agreement Closeout Summary Report

The U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Solar Energy Technologies Office (SETO)-funded New Industry Partnerships (NIPs) agreement established multiple new cooperative research projects with industry partners. Each project demonstrated the use of the National Renewable Energy Laboratory's Energy Systems Integration Facility (ESIF) as a national asset for research and development, testing, and validation of new technologies to support high penetrations of solar energy on the electric grid. The agreement was launched in 2013 and represented the SETO portion of the DOE EERE-wide Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) program. The focus of INTEGRATE was on multi-energy system testing and on testing the interactions of energy systems with information technology, communications, and telecommunications (ICT) systems. The NIPs agreement was a bit different from traditional research projects because it was specifically structured to enable partnerships for ESIF testing and as such required at least a 1:1 funds-in cost share from industry partners. In the end, the project engaged six different industry partnerships and resulted in testing a large number of innovative technologies. These included tiny inverters; power-to-gas technologies; and advanced simulation, analysis, and power-hardware-in-the-loop testing techniques. The agreement also provided significant impact for both research and industrial communities. This summary report provides a brief, high-level overview of these projects and their highlights along with lists of citations and other impacts. Readers are referred to the corresponding project reports for more in-depth information.

14 SOLAR ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development, CRADA Number CRD-19-00837 (Final Report)

The National Renewable Energy Laboratory (NREL) initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The national labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize (Penn State-PNNL): Cooperative Research and Development Final Report, CRADA Number CRD-19-00842

The National Renewable Energy Laboratory (NREL) initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The national labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Energy Resilience Planning For Remote, Island, And Islanded Communities

This webinar is intended to educate prospective applicants on the Energy Transitions Initiative Partnership Project (ETIPP). It includes a general description of what ETIPP does, who the ETIPP partners are, the types of technical assistance ETIPP might provide communities, and what the technical assistance application process involves.

44 EE - Strategic Programs, Energy Transition Init↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗

Offshore Wind in the US Gulf of Mexico: Regional Economic Modeling and Site-Specific Analyses

The goal of this study is to assess offshore wind energy resources in the Gulf of Mexico (GOM) and to quantify its technical and economic potential in order to inform Federal and GOM state strategic energy planning over the next decade. The objectives are to: describe site-specific and regional benefits and challenges of deploying offshore wind in the GOM and discuss the current research to mitigate challenges; review and quantify the wind resource capacity and energy potential in the GOM region for each GOM state including state and federal waters, distance from shore, and water depth; perform geospatial regional economic assessments of levelized cost of energy (LCOE), levelized avoided cost of energy (LACE), and net value (Section 3.4.2); evaluate three representative hypothetical locations for site-specific analysis; perform a high-level assessment of local supporting infrastructure availability, including existing services (e.g., fabrication facilities, vessels, ports) and possible grid connection options; assess the regional economic impacts of a 600 megawatt (MW) offshore wind power plant installed at a representative site in the GOM.

17 WIND ENERGY↗