Search NASA⌕ Search

Engineering topics

Grimm, C.

Publications and source records attributed to Grimm, C..

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

43 PARTICLE ACCELERATORS↗

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Coupler in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

Sukhanov, A.↗

The Evaluation of Mechanical Properties of LB650 cavities

The PIP-II project’s LB650 cavities could potentially be vulnerable to mechanical deformation because of the geometric shape of the cavity due to reduced beta. The mechanical property of the niobium half-cell was measured following various heat treatments. The 5-cell cavities were tested in a controlled drop test fashion and the real-world road test. The result showed that the 900 C heat treatment was compatible with cavity handling and transportation during production. The test provides the bases of the transportation specification and shipping container design guidelines.

Holzbauer, J.↗

The Evaluation of Mechanical Properties of LB650 Cavities

The PIP-II project's LB650 cavities could potentially be vulnerable to mechanical deformation because of the geometric shape of the cavity due to reduced beta. The mechanical property of the niobium half-cell was measured following various heat treatments. The 5-cell cavities were tested in a controlled drop test fashion and the real-world road test. The result showed that the 900 $\deg$C heat treatment was compatible with cavity handling and transportation during production. The test provides the bases of the transportation specification and shipping container design guidelines.

43 PARTICLE ACCELERATORS↗

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

43 PARTICLE ACCELERATORS↗

Prototype HB650 Transportation Validation For The PIP-II Project

The PIP-II Project at Fermilab is centered around a superconducting 800 MeV proton linac to upgrade and modernize the Fermilab accelerator complex, allowing increased beam current to intensity frontier experiments such as LBNF-DUNE. PIP-II includes strong international collaborations, including the delivery of 12 cryomodules from European labs to FNAL (3 from STFC-UKRI in the UK and 9 from CEA in France). The transatlantic shipment of these completed modules is identifed as a serious risk for the project. To mitigate this risk, a rigorous and systematic process has been developed to design and validate a transport system, including specifcation, procedures, logistics, and realistic testing. This paper will detail the engineering process used to manage this effort across the collaboration and the results of the first major validation testing of the integrated shipping system prior to use with a cryomodule.