Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

43 PARTICLE ACCELERATORS↗

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Coupler in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

Sukhanov, A.↗

The Evaluation of Mechanical Properties of LB650 cavities

The PIP-II project’s LB650 cavities could potentially be vulnerable to mechanical deformation because of the geometric shape of the cavity due to reduced beta. The mechanical property of the niobium half-cell was measured following various heat treatments. The 5-cell cavities were tested in a controlled drop test fashion and the real-world road test. The result showed that the 900 C heat treatment was compatible with cavity handling and transportation during production. The test provides the bases of the transportation specification and shipping container design guidelines.

Holzbauer, J.↗

The Evaluation of Mechanical Properties of LB650 Cavities

The PIP-II project's LB650 cavities could potentially be vulnerable to mechanical deformation because of the geometric shape of the cavity due to reduced beta. The mechanical property of the niobium half-cell was measured following various heat treatments. The 5-cell cavities were tested in a controlled drop test fashion and the real-world road test. The result showed that the 900 $\deg$C heat treatment was compatible with cavity handling and transportation during production. The test provides the bases of the transportation specification and shipping container design guidelines.

43 PARTICLE ACCELERATORS↗

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

43 PARTICLE ACCELERATORS↗

Prototype HB650 Transportation Validation For The PIP-II Project

The PIP-II Project at Fermilab is centered around a superconducting 800 MeV proton linac to upgrade and modernize the Fermilab accelerator complex, allowing increased beam current to intensity frontier experiments such as LBNF-DUNE. PIP-II includes strong international collaborations, including the delivery of 12 cryomodules from European labs to FNAL (3 from STFC-UKRI in the UK and 9 from CEA in France). The transatlantic shipment of these completed modules is identifed as a serious risk for the project. To mitigate this risk, a rigorous and systematic process has been developed to design and validate a transport system, including specifcation, procedures, logistics, and realistic testing. This paper will detail the engineering process used to manage this effort across the collaboration and the results of the first major validation testing of the integrated shipping system prior to use with a cryomodule.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Global-scale multidecadal variability missing in state-of-the-art climate models

Reliability of future global warming projections depends on how well climate models reproduce the observed climate change over the twentieth century. In this regard, deviations of the model-simulated climate change from observations, such as a recent “pause” in global warming, have received considerable attention. Such decadal mismatches between model-simulated and observed climate trends are common throughout the twentieth century, and their causes are still poorly understood. Here we show that the discrepancies between the observed and simulated climate variability on decadal and longer timescale have a coherent structure suggestive of a pronounced Global Multidecadal Oscillation. Surface temperature anomalies associated with this variability originate in the North Atlantic and spread out to the Pacific and Southern oceans and Antarctica, with Arctic following suit in about 25–35 years. While climate models exhibit various levels of decadal climate variability and some regional similarities to observations, none of the model simulations considered match the observed signal in terms of its magnitude, spatial patterns and their sequential time development. These results highlight a substantial degree of uncertainty in our interpretation of the observed climate change using current generation of climate models.

54 ENVIRONMENTAL SCIENCES↗

Stainless Steel to Titanium Bimetallic Transitions

In order to use stainless steel piping in an LCLS-II (Linac Coherent Light Source Upgrade) cryomodule, stainless steel to titanium bimetallic transitions are needed to connect the stainless steel piping to the titanium cavity helium vessel. Explosion bonded stainless steel to titanium transition pieces and bimetallic transition material samples have been tested. A sample transition tube was subjected to tests and x-ray examinations between tests. Samples of the bonded joint material were impact and tensile tested at room temperature as well as liquid helium temperature. The joint has been used successfully in horizontal tests of LCLS-II cavity helium vessels and is planned to be used in LCLS-II cryomodules. Results of material sample and transition tube tests will be presented.

43 PARTICLE ACCELERATORS↗