Search NASA⌕ Search

Engineering topics

Grimm, Chuck

Publications and source records attributed to Grimm, Chuck.

The Evaluation of Mechanical Properties of LB650 Cavities

The 650 MHz cavities have a stronger requirement of niobium mechanical properties because of the geometric shape of the cavity due to reduced beta. The mechanical property of the niobium half-cell was measured following various heat treatments. The 5-cell cavities were tested in a controlled drop test fashion and the real-world road test. The result showed that the 900C heat treatment was compatible with cavity handling and transportation during production. The test provides the bases of the transportation specification and shipping container design guidelines.

43 PARTICLE ACCELERATORS↗

HB650 Cryomodule Design: From Prototype to Production

In early 2023 the assembly of the prototype HB650 cryomodule (pHB650 CM) was completed and cold tests started to evaluate its performance. The lessons learned from the design, assembly and preliminary cold tests of this cryomodule, and from the design of the SSR2 pre-production cryomodule played a fundamental role during the design optimization process of the production HB650 cryomodule (HB650 CM). Several workshops have been organized to share experiences and solve problems. This paper presents the main design changes from pHB650 to the HB650 production cryomodules and their impact on the heat loads.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Test Shipment of the PIP-II 650 MHz Transport Frame Between FNAL to STFC-UKRI

The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program is in process to mitigate this risk. The centerpiece of this effort is the eventual shipment from FNAL to STFC-UKRI and back of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Most recently, a test shipment to the UK and back using a cryomodule analog was completed using realistic logistics, handling, instrumentation, and planning. The process of executing this test shipment, lessons learned, and plan moving forward will be presented here.

43 PARTICLE ACCELERATORS↗

LCLS-II-HE Status at Fermilab

The LCLS-II-HE project is an upgrade to the Linac Coherent Light Source facility at SLAC National Accelerator Laboratory. Fermilab is part of the LCLS-II-HE collaboration and will deliver 14 cryomodules to SLAC for LCLS-II-HE. These cryomodules consist of eight 1.3 GHz 9-cell cavities. Cryomodule production is in progress, and four cryomodules have been delivered to SLAC. One of the cryomodules already delivered is the verification cryomodule that reached 200 MV total voltage in continuous wave mode. Status of cryomodule production, and lessons learned will be presented. Fermilab is also designing a buncher cryomodule as part of a low emittance injector design for the project. The design is near completion, and status will be reported.

Kaluzny, Joshua↗