Search NASA⌕ Search

Engineering topics

Guarino, V.

Publications and source records attributed to Guarino, V..

VTR Fuel Design

VTR fuel design presentation for the May 25, 2021 VTR quarterly integration meeting

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Detection of the Crab Nebula with the 9.7 m prototype Schwarzschild-Couder telescope

The Schwarzschild-Couder Telescope (SCT) is a telescope concept proposed for the Cherenkov Telescope Array. It employs a dual-mirror optical design to remove comatic aberrations over an 8° field of view, and a high-density silicon photomultiplier camera (with a pixel resolution of 4 arcmin) to record Cherenkov emission from cosmic ray and gamma-ray initiated particle cascades in the atmosphere. Additionally, the prototype SCT (pSCT), comprising a 9.7 m diameter primary mirror and a partially instrumented camera with 1536 pixels, has been constructed at the Fred Lawrence Whipple Observatory. The telescope was inaugurated in January 2019, with commissioning continuing throughout 2019. We describe the first campaign of observations with the pSCT, conducted in January and February of 2020, and demonstrate the detection of gamma-ray emission from the Crab Nebula with a statistical significance of 8.6σ.

79 ASTRONOMY AND ASTROPHYSICS↗

PreCam: A Precursor Observational Campaign for Calibration of the Dark Energy Survey

PreCam, a precursor observational campaign supporting the Dark Energy Survey (DES), is designed to produce a photometric and astrometric catalog of nearly a hundred thousand standard stars within the DES footprint, while the PreCam instrument also serves as a prototype testbed for the Dark Energy Camera's hardware and software. This catalog represents a potential 100-fold increase in Southern Hemisphere photometric standard stars, and therefore will be an important component in the calibration of the Dark Energy Survey. We provide details on the PreCam instrument's design, construction, and testing, as well as results from a subset of the 51 nights of PreCam survey observations on the University of Michigan Department of Astronomy's Curtis-Schmidt telescope at Cerro Tololo Inter-American Observatory (CTIO). We briefly describe the preliminary data processing pipeline that has been developed for PreCam data and the preliminary results of the instrument performance, as well as astrometry and photometry of a sample of stars previously included in other southern sky surveys.

79 ASTRONOMY AND ASTROPHYSICS↗

Status of the Dark Energy Survey Camera (DECam) project

The Dark Energy Survey Collaboration has completed construction of the Dark Energy Camera (DECam), a 3 square degree, 570 Megapixel CCD camera which will be mounted on the Blanco 4-meter telescope at CTIO. DECam will be used to perform the 5000 sq. deg. Dark Energy Survey with 30% of the telescope time over a 5 year period. During the remainder of the time, and after the survey, DECam will be available as a community instrument. All components of DECam have been shipped to Chile and post-shipping checkout finished in Jan. 2012. Installation is in progress. A summary of lessons learned and an update of the performance of DECam and the status of the DECam installation and commissioning will be presented.

79 ASTRONOMY AND ASTROPHYSICS↗

Status of the Dark Energy Survey Camera (DECam) Project

The Dark Energy Survey Collaboration is building the Dark Energy Camera (DECam), a 3 square degree, 520Megapixel CCD camera which will be mounted on the Blanco 4-meter telescope at CTIO. DECam will be used toperform the 5000 sq. deg. Dark Energy Survey with 30% of the telescope time over a 5 year period. During theremainder of the time, and after the survey, DECam will be available as a community instrument. Construction ofDECam is well underway. Integration and testing of the major system components has already begun at Fermilab andthe collaborating institutions.

43 PARTICLE ACCELERATORS↗

SiD Letter of Intent

This document presents the current status of the Silicon Detector (SiD) effort to develop an optimized design for an experiment at the International Linear Collider. It presents detailed discussions of each of SiD's various subsystems, an overview of the full GEANT4 description of SiD, the status of newly developed tracking and calorimeter reconstruction algorithms, studies of subsystem performance based on these tools, results of physics benchmarking analyses, an estimate of the cost of the detector, and an assessment of the detector R and D needed to provide the technical basis for an optimised SiD.

43 PARTICLE ACCELERATORS↗