Search NASA⌕ Search

Engineering topics

Gubeli, J.

Publications and source records attributed to Gubeli, J..

Design and instrumentation for permanent magnet samples exposed to a radiation environment

This work is part of a larger program to study the effects of radiation on permanent magnets in an accelerator environment. In order to be sure that the permanent magnet samples are accurately placed, measured, and catalogued we have developed a system of sample racks, holders and measuring apparatuses. We have combined these holders and measurement racks with electronics to allow a single computer to catalogue the position and intensity of the magnet measurements. We outline the design of the apparatus, the collection software, and the methodology we will use to collect the data.

Accelerator Physics↗

Permanent Magnet Resiliency in Jefferson Lab’s Radiation Environment: LDRD Grant Status and Plans

As the FFA@CEBAF energy upgrade study progresses, it is important to investigate the impact of radiation exposure on the permanent magnet materials to be used in the upgraded fixed field alternating gradient (FFA) arcs. To address this, Jefferson Lab has awarded a Laboratory Directed Research and Development (LDRD) grant to study the resiliency of several permanent magnet materials placed in a radiation environment similar to that in which they are expected to operate. Samples of NeFeB and SmCo are to be placed alongside appropriate dosimetry in a variety of radiation environments in the beam enclosure and experimental halls at CEBAF. The magnet degradation will be measured, and extrapolated to the higher energies expected during operations after the energy upgrade. This document will describe the current status of the LDRD study, as well as describe the upcoming plans. It will also direct the readers to other proceedings which further detail the work thus far.

Bodenstein, R.↗

Progress on the Autonomous Event Detection System For the Laser Particulate Counter

Field emission is one of the most important issues that limits the performance of the superconducting radio frequency (SRF) systems and leads to SRF cavity trips at the Continuous Electron Beam Accelerator Facility at Jefferson Lab. Studies have confirmed that particulates are the dominant source of field emitters and the particulates can be transported into a cavity from other parts of the accelerator. To monitor the transportation of the particulates, a prototype of a novel, non-invasive laser particulate counter (LPC) has been developed and tested. Experiments have been done to validate the capability of the LPC. We are developing autonomous event detection system to continuously monitor the readout from the LPC and to recognize real events generated by particulates from noises using machine learning model. In this report, we will present how the data are prepared and how the model is trained. We will also discuss the performance of the model.

Zhang, H.↗

Positron beams at Ce+BAF

Positron beams would provide a new and meaningful probe for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab). The JLab Positron Working Group, formed in 2018 and now with over 250 members from 75 institutions, continues to develop an experimental program with high duty-cycle positron beams including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). In this presentation we describe a start-to-end layout for positron beams at 12 GeV CEBAF utilizing the Low Energy Research Facility (LERF) at Jefferson Lab to build two new injectors. A GaAs dc high voltage photo-gun first generates >1 mA of polarized electrons which are then accelerated to 80-150 MeV and directed to a high-power spinning W target for polarized bremsstrahlung and positron pair creation. A second injector then collects, bunches and accelerates the positrons to 123 MeV. The positron beams are transported by a new beam line and injected into the CEBAF acceptance for acceleration to the end stations with energies up to 12 GeV. The layout is optimized to provide Users with positron spin polarization >60% and intensity greater than >100 nA, and with higher intensities when polarization is not required.

Benesch, J.↗