Interlocks/Instrumentation Control Systems at LANL Accelerator Facilities
Abstract Not Provided
Engineering topics
Publications and source records attributed to Gulley, Mark S.
Abstract Not Provided
Abstract Not Provided
IPF has recently investigated isotope production with proton beams at energies other than the 100-MeV currently available to the IPF beam line. To maximize the yield of a particular isotope, it is necessary to measure the production rate and cross section versus proton beam energy. Studies were conducted at 800 MeV and 197 MeV to determine the cross section of Tb-159. Also, the ability to irradiate targets at different proton beam energies opens up the possibility of producing other radioisotopes. A proof-of-principle test was conducted to develop a 40-MeV tune in the 100-MeV beam line. Another parameter explored was the beam current, which was raised from the normal limit of 250 {mu}A up to 356 {mu}A via both power and repetition rate increase. This proof-of-principle test demonstrated the capability of the IPF beam line for high current operation with potential for higher isotope yields. For the full production mode, system upgrades will need to be in place to operate at high current and high duty factor. These activities are expected to provide the data needed for the development of a new and unique isotope production capability complementing the existing 100-MeV IPF facility.
In a nutshell, the role of a beam diagnostic measurement is to provide information needed to get a particle beam from Point A (injection point) to Point B (a target) in a useable condition, with 'useable' meaning the right energy and size and with acceptable losses. Specifications and performance requirements of diagnostics are based on the physics of the particle beam to be measured, with typical customers of beam parameter measurements being the accelerator operators and accelerator physicists. This tutorial will be a physics-oriented discussion of the interplay between tuning evolutions and the beam diagnostics systems that support the machine tune. This will include the differences between developing a tune and maintaining a tune, among other things. Practical longitudinal and transverse tuning issues and techniques from a variety of proton and electron machines will also be discussed.
LANSCE has been the centerpiece of large-scale science at Los Alamos National Laboratory for many decades. Recently, funding has been obtained to ensure continued reliable operation of the LANSCE linac and to allow planning to enable the first in a new generation of scientific facilities for the materials community. The emphasis of this new facility is 'Matter-Radiation Interactions in Extremes' (MaRIE) which will be used to discover and design the advanced materials needed to meet 21st century national security and energy security challenges. MaRIE will provide the tools scientists need to develop next-generation materials that will perform predictably and on-demand for currently unattainable lifetimes in extreme environments. The MaRIE facility is based on a high-power upgrade to the existing LANSCE proton linac, a new electron linac and associated X-ray FEL to provide additional probe beams, and new experimental areas. A conceptual description of this new facility and its requirements will be presented.
The Los Alamos Neutron Science Center (LANSCE) accelerator and beam delivery complex generates the proton beams that serve three neutron production sources, a proton radiography facility and a medical and research isotope production facility. The recent operating history of the facility, including both achievements and challenges, will be reviewed. Plans for performance improvement will be discussed, together with the underlying drivers for the ongoing LANSCE Risk Mitigation project. The details of this latter project will also be discussed.
Explore the source record for details and available documents.
The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.