Search NASA⌕ Search

Engineering topics

Hafiz, Faeza

Publications and source records attributed to Hafiz, Faeza.

Charging location selection of an incoming electric vehicle for large EV depot infrastructure

As the use of renewable energy resources increases within charging infrastructures, the risk that charging an additional load within the charging infrastructure will create a violation of the applicable grid code also increases. In an embodiment, a charging location is selected for an incoming load based on a load flow analysis, to thereby mitigate the risk of a violation. This selection process may also account for the charging schedule of the load and the capacity of available charging stations (e.g., fast charging vs. slow charging).

Hafiz, Faeza↗

US 2023/0182605 A1 Network constraint energy management system for electric vehicle depot charging and scheduling

Network constraint energy management system for electric vehicle (EV) depot charging and scheduling. In an embodiment, a power schedule is received from an economic dispatch application for a charging depot comprising EV charging station(s) and distributed energy resource(s). The power schedule may be simulated on a distribution network model of the charging depot, according to load flow analysis, to determine whether any grid-code violations occur. In response to the detection of violation(s), a constraint may be generated for each violating node, and the economic dispatch application may be re-executed with the constraint(s) to produce a new power schedule, until no violations are detected. When not all load demand can be satisfied by the power schedule, a charging schedule may be adjusted to ensure that critical energy requirements are satisfied. The final power and charging schedules may be used to schedule and control power generation and charging in the charging depot.

Hafiz, Faeza↗

Real-time Implementation of Grid Code Compliant Grid Edge Energy Management System

Integrated distributed energy resources (DER) in a distribution system need to follow grid codes to avoid violations that result in DER/circuit segment disconnection. To comply with grid code requirements at the grid edge level, network constrained grid edge energy management system (EMS) can be deployed. The objective of grid edge EMS is to provide economic solution for active and reactive power DER setpoints at each dispatch interval and ensure voltage regulation to support secure interconnection of the grid edge segment to the distribution system with multiple inverter based DER units. In this work, real-time simulation of grid code compliant grid edge EMS is deployed in a realistic feeder circuit segment. For real-time simulation, communication between the grid edge EMS and DERs is done exploiting IEC 61850-7-420. It enables interoperability among different DERs and grid edge EMS. No prior art has deployed IEC 61850-7-420 GOOSE communication protocol for grid edge EMS. Conversion of IEC 61850 GOOSE messages to Modbus communication protocol is also performed to communicate with grid edge EMS in commodity-off the shelf embedded boards in this work. The real-time simulation in OPAL-RT real-time digital simulator shows the out-performance of grid edge EMS by reducing the voltage violation in the distribution circuit.

Energy management system↗

Security Enhancement of Network Constraint Grid-Edge Energy Management System

Network constrained grid edge energy management system (EMS) provides economic solution for active and reactive power dispatch of distributed energy resources (DERs) at the grid edge level. Grid edge EMS ensures secure interconnection of a circuit segment to the distribution system by maintaining grid code requirements (e.g. IEEE 1547–2018). Grid edge EMS is dependent on communication to receive load measurement, which brings a risk of unobservable false data injection attacks (FDIAs). To mitigate the risk, this paper proposes a framework to enhance resilient operation of grid edge EMS by detecting the unobservable FDIAs on loads and replacing them with forecasted values. In this work, a two-step detection algorithm is proposed. In first step, conventional residual based algorithm is deployed. Autoencoder (AE) based data driven mechanism is included in second step to detect the presence of unobservable FDIAs. After ensuring the presence of FDIA, its specific location is detected by checking the maximum residue values till the predefined threshold value is reached. Detected false data injected loads are then replaced with forecasted load values following long-short term memory (LSTM) based forecast to ensure resilient performance of grid edge EMS in the presence of attacks. This proposed security enhancement framework for grid edge EMS is evaluated in IEEE 13 bus system with three integrated DERs. Numerical simulation shows the validation of the proposed framework by reducing voltage violation in real operation of grid edge EMS.

cyber attack detection↗

Network Constraints Consideration for Grid-Edge Energy Management System

Increased deployment of distributed energy resources (DER) in distribution system is bringing need for enhanced grid intelligence, control, and flexibility. This is significant at the edge of the grid where DERs, loads or microgrids are located. Integrated DERs in a distribution system need to follow grid codes to avoid violations that results in DER disconnection. To comply with grid code requirements (e.g. IEEE 1547-2018) at the grid edge level, network constrained grid edge energy management system (GEEMS) is proposed in this paper. The objective of GEEMS is to provide economic solution for active and reactive power dispatch set-points at each interval and ensure voltage regulation to support secure interconnection of the grid edge segment to the distribution system. To evaluate the proposed GEEMS framework, four DERs are included into IEEE 13 bus system. GEEMS outperforms the existing economic dispatch-based energy management system by reducing the voltage violation.

Electric vehicle depot charging station↗

Peña Station NEXT Energy District Master Plan (Cooperative Research and Development Final Report, CRADA Number CRD-17-681)

The objective of the project is to work in close collaboration with Panasonic, Xcel Energy (Public Service), and their partners L.C. Fulenwider, and Denver International Airport to examine different design and technology options in creating an energy master plan for the 400 acre Pena Station NEXT district in Denver, Colorado. To accomplish this, NREL will conduct a solar power/battery storage/grid integration study using the OpenDSS platform linked to UrbanOPT software.

25 ENERGY STORAGE↗