Search NASA⌕ Search

Engineering topics

Han, Dongsuk

Publications and source records attributed to Han, Dongsuk.

Dawn's final mission at Ceres: navigation and mission design experience

On Oct. 31st, 2018, the Dawn spacecraft completed its space journey covering more than 11 years including exploration of Vesta and Ceres, two protoplanets in the main asteroid belt. After successfully completing its prime mission at the dwarf planet Ceres, the Dawn mission was extended twice to pursue new scientific objectives. The second extended mission at Ceres, and the final mission for Dawn, presented a series of challenges that were new to the experienced and accomplished Dawn navigation team. This paper discusses mission design and navigational experiences and challenges during Dawn’s final transfer and orbit at Ceres. Topics include reference orbit design of the final science orbit, mission design and planning for the transfer, periapsis targeting over a surface feature, and analysis for planetary protection requirements.

Karimi, Reza↗

Aerobracking the ExoMars TGO: the JPL Navigation Experience

In October 2016, ESA’s Trace Gas Orbiter entered into orbit around Mars. The transfer from its initial 24-hour elliptical orbit into the final 2-hour science orbit was helped by means of 952 aerobraking passes between March 2017 and February 2018. For this first aerobraking operation by European Space Operations Centre (ESOC), a dedicated partnership was organized between ESOC and NASA’s Jet Propulsion Laboratory (JPL) to allow for JPL navigation team’s support during the TGO aerobraking operations. The Mission Design and Navigation section at JPL supported the mission by providing consulting in aerobraking navigation operations and independent orbit determination solutions during TGO’s aerobraking. This paper discusses the JPL Navigation team’s experience, challenges faced, and lessons learned during TGO’s aerobraking at Mars. Topics include the collaboration between the two navigation teams, configuration of orbit determination for aero drag passes, arrangement of automated orbit determination, and reporting processes.

Young, Brian↗

Design and Execution of Dawn HAMO to LAMO Transfer at Ceres

On October 23, 2015, the Dawn spacecraft left the High Altitude Mapping Orbit (HAMO) around Ceres and began its final decent to the Low Altitude Mapping Orbit (LAMO), arriving on December 15. The transfer between the two science orbits, a tight spiraling trajectory with over 100 revolutions, required the operations team to perform weekly maneuver designs for a period of 50 days. While the first six weeks of the transfer executed as planned, unexpectedly the spacecraft incurred a multi-sigma delivery error to the final science orbit that was subsequently clean-up at the first orbit maintenance maneuver. In this paper we discuss the design architecture for the transfer in detail, including challenges the team faced in flying the transfer and lessons learned.

Grebow, Daniel J.↗

Dawn Safing Approach to Ceres Re-Design

In mid-2014 the Dawn team finalized preparations for the spacecraft’s approach to Ceres. The design was the product of careful planning that began several years in advance, when the spacecraft left Vesta in September 2012. However, a few months prior to the anticipated start of approach, the spacecraft entered a safe mode. While temporary loss of thrust for ion propulsion missions is usually not mission-critical, it still presents many challenges. The safing event occurred at a time when thrusting to match Ceres’ orbital velocity was most effective, which meant the spacecraft must fly past Ceres before capturing into orbit. The new approach geometry changed the team’s strategy for navigating the spacecraft safely into orbit around Ceres with optical data. In this paper we describe the challenges of navigating the Dawn spacecraft into orbit around Ceres, including the safing event and re-design of the approach architecture.

Grebow, Daniel J.↗

Orbit Transfers for Dawn's Ceres Operations: Navigation and Mission Design Experience at a Dwarf Planet

Dawn, a mission belonging to NASA’s Discovery Program, was launched on September 27, 2007 to explore two objects in the main asteroid belt in order to yield insights into important questions about the formation and evolution of the solar system. Successfully completing all mission objectives at Vesta, Dawn arrived at dwarf planet Ceres in March 2015 and continued its journey to a series of four near circular polar science orbits. Dawn became the first mission to orbit around two extraterrestrial targets; such a mission would have been impossible without the low thrust ion propulsion system (IPS). Maneuvering a spacecraft using only the IPS for the transfers between the mapping orbits posed many technical challenges to Dawn’s flight team at NASA’s Jet Propulsion Laboratory. Failure of the second reaction wheel assembly, shortly before leaving Vesta, added another challenge for Dawn’s flight team. This paper discusses the mission design and navigational experience and challenges during Dawn’s Ceres operations.

Han, Dongsuk↗

Determination of Ceres Physical Parameters Using Radiometric and Optical Data

The Dawn spacecraft was launched on September 27th, 2007. Its mission is to rendezvous with and observe the two largest bodies in the main asteroid belt, Vesta and Ceres. It has completed over a year’s worth of direct observations of Vesta from early 2011 through late 2012. In the spring of 2015, the Dawn spacecraft entered orbit around the asteroid Ceres for the start of what is expected to be more than a year of science operations. The science data collected from this encounter consist of infrared (IR) images and spectra, visible images through a number of color filters, gamma ray detections and measurements of the Ceres gravity field. These data will be collected during several science phases: an Approach phase (1500000-4860 km from Ceres), a Survey orbit (4860 km radius), a High Altitude Mapping Orbit (HAMO) (1940 km radius) and a Low Altitude Mapping Orbit (LAMO) (855 km radius). The Approach phase included three Rotational Characterization (RC) opportunities. Designing each science orbit and successfully transferring into that orbit requires a sufficiently accurate estimate of Ceres physical parameters (body fixed frame, GM and harmonics). This paper focuses on work performed to estimate Ceres physical parameters using Deep Space Network (DSN) radiometric tracking data and optical measurements derived from science camera imagery. This paper describes planning for the data acquisition, as well as processing techniques and methodology. The trajectories predicted by the gravity field estimations are also compared with the actual as-flown trajectories. Observations of the gravity at high altitudes are found to be sufficient to design precision orbits at lower altitudes. Follow-up analysis after successfully reaching LAMO is included, as is a discussion of lessons learned.

Kennedy, Brian M.↗

Dawn Orbit Determination Team: Trajectory Modeling and Reconstruction Processes at Vesta

The Dawn spacecraft spent over a year in orbit around Vesta from July 2011 through August 2012. In order to maintain the designated science reference orbits and enable the transfers between those orbits, precise and timely orbit determination was required. Challenges included low-thrust ion propulsion modeling, estimation of relatively unknown Vesta gravity and rotation models, track-ing data limitations, incorporation of real-time telemetry into dynamics model updates, and rapid maneuver design cycles during transfers. This paper discusses the dynamics models, filter configuration, and data processing implemented to deliver a rapid orbit determination capability to the Dawn project.

low thrust↗

Dawn Orbit Determination Team: Trajectory and Gravity Prediction Performance During Vesta Science Phases

The Dawn spacecraft was launched on September 27th, 2007. Its mission is to consecutively rendezvous with and observe the two largest bodies in the asteroid belt, Vesta and Ceres. It has already completed over a year's worth of direct observations of Vesta (spanning from early 2011 through late 2012) and is currently on a cruise trajectory to Ceres, where it will begin scientific observations in mid-2015. Achieving this data collection required careful planning and execution from all spacecraft teams. Dawn's Orbit Determination (OD) team was tasked with accurately predicting the trajectory of the Dawn spacecraft during the Vesta science phases, and also determining the parameters of Vesta to support future science orbit design. The future orbits included the upcoming science phase orbits as well as the transfer orbits between science phases. In all, five science phases were executed at Vesta, and this paper will describe some of the OD team contributions to the planning and execution of those phases.

gravity gradient torque↗

Orbit Transfers for Dawn's Vesta Operations : Navigation and Mission Design Experience

Dawn, a mission belonging to NASA's Discovery Program, was launched on September 27, 2007 to explore main belt asteroids in order to yield insights into important questions about the formation and evolution of the solar system. From July of 2011 to August of 2012, the Dawn spacecraft successfully returned valuable science data, collected during the four planned mapping orbits at its first target asteroid, Vesta. Each mapping orbit was designed to enable a different set of scientific observations. Such a mission would have been impossible without the low thrust ion propulsion system (IPS). Maneuvering a spacecraft using only the IPS for the transfers between the mapping orbits posed many technical challenges to Dawn's flight team at NASA's Jet Propulsion Laboratory. Each transfer needs a robust plan that accounts for uncertainties in maneuver execution, orbit determination, and physical characteristics of Vesta. This paper discusses the mission design and navigational experience during Dawn's Vesta operations. Topics include requirements and constraints from Dawn's science and spacecraft teams, orbit determination and maneuver design and building process for transfers, developing timelines for thrust sequence build cycles, and the process of scheduling very demanding coverage with ground antennae at NASA's Deep Space Network.

low thrust↗

Navigation and EDL for the Mars Exploration Rovers

A viewgraph presentation on Deep Space Navigation, and Entry, Decent, and Landing (EDL) for Mars Exploration Rovers is shown. The contents include: 1) JPL Spacecraft Operating across the Solar System; 2) 2003 - 2004: The Busiest Period in JPL's History; 3) Deep Space Navigation Will Enable Many of the New NASA Missions; 4) What Exactly is Navigation vs. GNC for Deep Space?; 5) Cruise and Approach: Why is Deep Space Navigation So Difficult?; 6) Project Importance of GNC: Landing Site Selection; 7) Planetary Communications and Tracking; 8) Tracking Data Types; 9) Delta Differential One-Way Range (deltaDOR); 10) All Solutions Leading up to TCM-4 Design; 11) Entry Flight Path Sensitivities; 12) MER Navigation Results; 13) Atmospheric Entry Targeting and Delivery; 14) Landing Ellipse Orientation; 15) MER Landing Site Trade Example; 16) Entry, Descent and Landing: Entry Guidance or What Things Do We NOT do for MER Landings (but we will later...); 17) Entering Martian Space 8:29 p.m. PST (ERT); 18) Entry, Descent and Landing; 19) Entry, Descent and Landing: Terminal Guidance; 20) The Challenge Going from 12,000 mph to Zero in Less Than Six Minutes; 21) Spirit Landing Location; 22) Entry, Descent and Landing: The Future; 23) Powered Descent Time-Line; and 24) Updated Sky Crane Maneuver Description. A short summary is also given on planetary guidance, navigation and control as it pertains to EDL systems

Mars Exploration Rover (MER)↗

Mars Express Interplanetary Navigation from Launch to Mars Orbit Insertion: The JPL Experience

The National Aeronautics and Space Administration (NASA) Jet Propulsion Laboratory (JPL) played a significant role in supporting the safe arrival of the European Space Agency (ESA) Mars Express (MEX) orbiter to Mars on 25 December 2003. MEX mission is an international collaboration between member nations of the ESA and NASA, where NASA is supporting partner. JPL's involvement included providing commanding and tracking service with JPL's Deep Space Network (DSN), in addition to navigation assurance. The collaborative navigation effort between European Space Operations Centre (ESOC) and JPL is the first since ESA's last deep space mission, Giotto, and began many years before the MEX launch. This paper discusses the navigational experience during the cruise and final approach phase of the mission from JPL's perspective. Topics include technical challenges such as orbit determination using non-DSN tracking data and media calibrations, and modeling of spacecraft physical properties for accurate representation of non-gravitational dynamics. Also mentioned in this paper is preparation and usage of DSN Delta Differential Oneway Range ((Delta)DOR) measurements, a key element to the accuracy of the orbit determination.

Deep Space Network (DSN)↗