Search NASA⌕ Search

Engineering topics

Hanlet, Pierrick

Publications and source records attributed to Hanlet, Pierrick.

Performance of PIP-II high-beta 650 cryomodule after transatlantic shipping

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

43 PARTICLE ACCELERATORS↗

Controls at the Fermilab PIP-II Superconducting Linac

PIP-II is an 800 MeV superconducting RF linac under development at Fermilab. As the new first stage in our accelerator chain, it will deliver high-power beam to multiple experiments simultaneously and thus drive Fermilab’s particle physics program for years to come. In a pivot for Fermilab, controls for PIP-II are based on EPICS instead of ACNET, the legacy control system for accelerators at the lab. This paper discusses the status of the EPICS controls work for PIP-II. We describe the EPICS tools selected for our system and the experience of operators new to EPICS. We introduce our continuous integration / continuous development environment. We also describe some efforts at cooperation between EPICS and ACNET, or efforts to move towards a unified interface that can apply to both control systems.

43 PARTICLE ACCELERATORS↗

Disentangling Beam Losses in The Fermilab Main Injector Enclosure Using Real-Time Edge AI

The Fermilab Main Injector enclosure houses two accelerators, the Main Injector and Recycler Ring. During normal operation, high intensity proton beams exist simultaneously in both. The two accelerators share the same beam loss monitors (BLM) and monitoring system. Deciphering the origin of any of the 260 BLM readings is often difficult. The (Accelerator) Real-time Edge AI for Distributed Systems project, or READS, has developed an AI/ML model, and implemented it on fast FPGA hardware, that disentangles mixed beam losses and attributes probabilities to each BLM as to which machine(s) the loss originated from in real-time. The model inferences are then streamed to the Fermilab accelerator controls network (ACNET) where they are available for operators and experts alike to aid in tuning the machines.

43 PARTICLE ACCELERATORS↗

State Machine Operation of Complex Systems

Operation of complex systems which depend on one or more other systems with many process variables often operate in more than one state. For each state there may be a variety of parameters of interest, and for each of these, one may require different alarm limits, different archiving needs, and have different critical parameters. Relying on operators to reliably change 10s-1000s of parameters for each system for each state is unreasonable. Not changing these parameters results in alarms being ignored or disabled, critical changes missed, and/or possible data archiving problems. To reliably manage the operation of complex systems, such as cryomodules (CMs), Fermilab is implementing state machines for each CM and an over-arching state machine for the PIP-II superconducting linac (SCL). The state machine transitions and operating parameters are stored/restored to/from a configuration database. Proper implementation of the state machines will not only ensure safe and reliable operation of the CMs, but will help ensure reliable data quality. A description of PIP-II SCL, details of the state machines, and lessons learned from limited use of the state machines in recent CM testing will be discussed.

43 PARTICLE ACCELERATORS↗

EPICS Deployment at Fermilab

Fermilab has traditionally not been an EPICS house, as such expertise in EPICS is limited and scattered. However, PIP-II will be using EPICS for its control system. Furthermore, when PIP-II is operating, it must to interface with the existing, though modernized (see ACORN) legacy control system. We have developed and deployed a software pipeline that addresses these needs and presents to developers a tested and robust software framework, including template IOCs from which new developers can quickly gain experience. In this presentation, we will discuss the motivation for this work, the implementation of a continuous integration/continuous deployment pipeline, testing, template IOCs, and the deployment of user applications. We will also discuss how this is used with the current PIP-II teststand and lessons learned.

43 PARTICLE ACCELERATORS↗

State Machine Operation of Complex Systems

Operation of complex systems which depend on one or more other systems with many process variables often operate in more than one state. For each state there may be a variety of parameters of interest, and for each of these, one may require different alarm limits, different archiving needs, and have different critical parameters. Relying on operators to reliably change 10s-1000s of parameters for each system for each state is unreasonable.Not changing these parameters results in alarms being ignored or disabled, critical changes missed, and/or possible data archiving problems.To reliably manage the operation of complex systems, such as cryomodules (CMs), Fermilab is implementing state machines for each CM and an over-arching state machine for the PIP-II superconducting linac (SCL). The state machine transitions and operating parameters are stored/restored to/from a configuration database. Proper implementation of the state machines will not only ensure safe and reliable operation of the CMs, but will help ensure reliable data quality. A description of PIP-II SCL, details of the state machines, and lessons learned from limited use of the state machines in recent CM testing will be discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

State Machine Operation of Complex Systems

SQMS, affiliated with Fermilab, is one of five research centers funded by the DOE dedicated to the development and deployment of advanced quantum computers and sensors. The objective of our research was to devise an experimental design for quantum transduction, with the aim of facilitating the development of a distributed quantum network to connect quantum computers over large distances.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Phoebus Workshop Summary

Explore the source record for details and available documents.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Semantic Regression for Disentangling Beam Losses in the Fermilab Main Injector and Recycler

Fermilab’s Main Injector enclosure houses two accelerators: the Main Injector (MI) and the Recycler (RR). In periods of joint operation, when both machines contain high intensity beam, radiative beam losses from MI and RR overlap on the enclosure’s beam loss monitoring (BLM) system, making it difficult to attribute those losses to a single machine. Incorrect diagnoses result in unnecessary downtime that incurs both financial and experimental cost. In this work, we introduce a novel neural approach for automatically disentangling each machine’s contributions to those measured losses. Using a continuous adaptation of the popular UNet architecture in conjunction with a novel data augmentation scheme, our model accurately infers the machine of origin on a per-BLM basis in periods of joint and independent operation. Crucially, by extracting beam loss information at varying receptive fields, the method is capable of learning both local and global machine signatures and producing high quality inferences using only raw BLM loss measurements.

43 PARTICLE ACCELERATORS↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

Resonance Control System for the PIP-II IT HWR Cryomodule

The HWR (half-wave-resonator) cryomodule is the first one in the superconducting section of the PIP-II LINAC project at Fermilab. PIP-II IT is a test facility for the project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The HWR cryomodule comprises 8 cavities operating at a frequency of 162.5 MHz and accelerating beam up to 10 MeV. Resonance control of the cavities is performed with a pneumatically operated slow tuner which compresses the cavity at the beam ports. Helium gas pressure in a bellows mounted to an end wall of the cavity is controlled by two solenoid valves, one on the pressure side and one on the vacuum side. The resonant frequency of the cavity can be controlled in one of two modes. A pressure feedback control loop can hold the cavity tuner pressure at a fixed value for the desired resonant frequency. Alternately, the feedback loop can regulate the cavity tuner pressure to bring the RF detuning error to zero. The resonance controller is integrated into the LLRF control system for the cryomodule. The control system design and performance of the resonance control system are described in this paper.

43 PARTICLE ACCELERATORS↗

Performance of the LLRF System for the Fermilab PIP-II Injector Test

PIP-II IT is a test facility for the PIP-II project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The 8-cavity half-wave-resonator (HWR) cryomodule operating at 162.5 MHz is followed by the 8-cavity single-spoke resonator(SSR1) cryomodule operating at 325 MHz. The LLRF systems for both cryomodules are based on a common SOC FPGA-based hardware platform. The resonance control systems for the two cryomodules are quite different, the first being a pneumatic system based on helium pressure and the latter a piezo/stepper motor type control. The data acquisition and control system can support both CW and Pulsed mode operations. Beam loading compensation is available which can be used for both manual/automatic control in the LLRF system. The user interfaces include EPICS, Labview, and ACNET. Testing of the RF system has progressed to the point of being ready for a 2 mA beam to be accelerated to 25 MeV. The design and performance of the field control and resonance control system operation with beam are presented in this paper.

43 PARTICLE ACCELERATORS↗

Operational Experience with the MICE Spectrometer Solenoid System

The Muon Ionization Cooling Experiment located at Rutherford Appleton Laboratory in England utilizes a supercon-ducting solenoid system for the muon cooling channel that also holds particle tracking detectors and muon absorbers inside their bores. The solenoid system installation was completed in summer of 2015 and after commissioning the system it has been running successfully. As a result, this paper summarizes the commissioning results and operational experience with the magnets focusing on the per-formance of the two Spectrometer Solenoids built by the US.

43 PARTICLE ACCELERATORS↗

Status of MICE, the International Muon Ionization Cooling Experiment

Muon ionization cooling provides the only practical solution to prepare high brilliance beams necessary for a neutrino factory or muon colliders. The muon ionization cooling experiment (MICE) is thus a strategic R&D project for neutrino physics. It is under development at the Rutherford Appleton Laboratory (UK). It comprises a dedicated beam line to generate a range of input emittance and momentum, with time-of-flight and Cherenkov detectors to ensure a pure muon beam. A first measurement of emittance is performed in the upstream magnetic spectrometer with a scintillating fiber tracker. A cooling cell will then follow, alternating energy loss in liquid hydrogen and RF acceleration. A second spectrometer identical to the first one and a particle identification system provide a measurement of the outgoing emittance. In the 2010 run, completed in August, the beam and most detectors have been fully commissioned. The time of the first measurement of input beam emittance is closely approaching. The plan of steps of measurements of emittance and emittance reduction (cooling), that will follow in 2011 and later, will be reported.

43 PARTICLE ACCELERATORS↗

MICE Staging and Status

Ionization cooling will be a key technique for a high-intensity Neutrino Factory or Muon Collider. The Muon Ionization Cooling Experiment (MICE) is a high-precision, staged accelerator experiment being performed at Rutherford Appleton Laboratory in the UK. Its goal is the first demonstration, with 0.1% resolution, of the feasibility of reducing the transverse emittance of a beam of muons by ionization cooling in low-Z absorbers. MICE is being staged in the following steps: I. Creating and characterizing a beam of muons; II. Measuring their emittance; III. Systematic comparison of successive measurements; IV. Inserting absorber; V. Reaccelerating longitudinally; and VI. Complete '10%-cooling' test. Step I is currently in progress with Step II to commence next year; completion of Step VI is anticipated in approx2012.

43 PARTICLE ACCELERATORS↗