Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

43 PARTICLE ACCELERATORS↗

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Coupler in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

Sukhanov, A.↗

Testing and Processing of Pre-production 325 MHz Single Spoke Resonator Power Couplers for PIP-II Project

Fundamental 325 MHz power couplers are designed, built and tested for SSR cavities in PIP-II project. Couplers should work in CW mode at power level 7.5kW w/o beam and ~15 kW with the 2 mA beam. At pre-production stage we built and tested 6 couplers, produced by CPI (FNAL) and PMB (IJCLab) and 4 more couplers will be tested soon. Two of tested couplers had TiN coated ceramic window. In warm test stand two couplers were mounted on the coupling chamber and tested in SW regime at full reflection with phase controlled by position of short and reflection insert. Couplers were tested at pulse mode (up to 25kW) and cw mode (12kW) with HV bias or without bias. Test results demonstrated that 3.5 kV DC bias completely suppresses multipactor in coupler. Vacuum activity in coupler was controlled by e-pickups and build-in vacuum gauges, located near the vacuum side of window. Power processing without DC bias was done for several couplers with and without TiN coating on ceramic window. Test results are presented and discussing in paper.

43 PARTICLE ACCELERATORS↗

Testing of PIP-II pre-production 650 MHz couplers in warm test stand and in cryomodule

650 MHz fundamental power couplers were developed for PIP-II project to deliver RF power for low-beta and high-beta elliptical cavities. Few prototypes were built and tested and after some modification we built 8 pre-production couplers (with few spares for vacuum side) for HB650 cryomodule. All couplers were successfully tested in pulse mode (up to 100kW) and in CW mode (up to 50kW) in test stand at full reflection at 8 phases. In baseline configuration with DC bias we do not see any multipactoring activity after short processing. We also tested power processing without bias for uncoated and TiN coated ceramic window. Results of these studies presented in this paper. One of the coupler was assembled on LB650 cavity and tested at cryogenic environment in STC cryostat at ~20kW power with full reflection at different reflection phase. We also demonstrated good result from power processing without bias for warm and cold cavity. Six couplers were assembled on HB650 cavities in pre-production cryomodule. Test results from cryomodule qualification is discussing in this paper.

43 PARTICLE ACCELERATORS↗

TESTING AND PROCESSING OF PRE-PRODUCTION 325 MHZ SINGLE SPOKE RESONATOR POWER COUPLERS FOR PIP-II PROJECT

Fundamental 325 MHz power couplers are designed, built and tested for SSR cavities in PIP-II project [1]. Couplers should work in CW mode at power level 7.5kW w/o beam and ~15 kW with the 2 mA beam. At pre-production stage we built and tested 6 couplers, produced by CPI (FNAL) and PMB (IJCLab) and 4 more couplers will be tested soon. Two of tested couplers had TiN coated ceramic window. In warm test stand two couplers were mounted on the coupling chamber and tested in SW regime at full reflection with phase controlled by position of short and reflection insert. Couplers were tested at pulse mode (up to 25kW) and cw mode (12kW) with HV bias or without bias. Test results demonstrated that 3.5 kV DC bias completely suppresses multipactor in coupler. Vacuum activity in coupler was controlled by e-pickups and build-in vacuum gauges, located near the vacuum side of window. Power processing without DC bias was done for several couplers with and without TiN coating on ceramic window. Test results are presented and discussing in paper.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Experience With Machine Protection Systems At PIP2IT

The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. The beam was interrupted faster than 10$\mu$s when excessive beam loss was detected. The paper describes the MPS architecture, methods of the loss detection, procedure of the beam interruption, and operational experience at PIP2IT.

43 PARTICLE ACCELERATORS↗

Beam Dynamics Studies at the PIP-II Injector Test Facility

A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules accelerating the beam to 16 MeV and a High-Energy Beam Transport (HEBT) bringing the beam to a dump. This paper presents beam dynamics - related measurements performed at PIP2IT such as the Twiss parameters with Allison scanners, beam envelopes along the injector, and transverse and longitudinal rms emittance reconstruction. These measurements are compared with predictions from the beam dynamics code Tracewin.

43 PARTICLE ACCELERATORS↗