Search NASA⌕ Search

Engineering topics

Hansen, B.

Publications and source records attributed to Hansen, B..

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Couplers in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

43 PARTICLE ACCELERATORS↗

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Coupler in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

Sukhanov, A.↗

Environmental drivers of increased ecosystem respiration in a warming tundra

Abstract Arctic and alpine tundra ecosystems are large reservoirs of organic carbon 1,2 . Climate warming may stimulate ecosystem respiration and release carbon into the atmosphere 3,4 . The magnitude and persistency of this stimulation and the environmental mechanisms that drive its variation remain uncertain 5–7 . This hampers the accuracy of global land carbon–climate feedback projections 7,8 . Here we synthesize 136 datasets from 56 open-top chamber in situ warming experiments located at 28 arctic and alpine tundra sites which have been running for less than 1 year up to 25 years. We show that a mean rise of 1.4 °C [confidence interval (CI) 0.9–2.0 °C] in air and 0.4 °C [CI 0.2–0.7 °C] in soil temperature results in an increase in growing season ecosystem respiration by 30% [CI 22–38%] (n = 136). Our findings indicate that the stimulation of ecosystem respiration was due to increases in both plant-related and microbial respiration (n = 9) and continued for at least 25 years (n = 136). The magnitude of the warming effects on respiration was driven by variation in warming-induced changes in local soil conditions, that is, changes in total nitrogen concentration and pH and by context-dependent spatial variation in these conditions, in particular total nitrogen concentration and the carbon:nitrogen ratio. Tundra sites with stronger nitrogen limitations and sites in which warming had stimulated plant and microbial nutrient turnover seemed particularly sensitive in their respiration response to warming. The results highlight the importance of local soil conditions and warming-induced changes therein for future climatic impacts on respiration.

Science & Technology - Other Topics↗

Nitrogen precooling heat exchanger replacement and control system upgrade in superfluid cryoplant at CMTF

Liquid nitrogen precooling is used in most cryoplants to achieve cooldown to 80 K temperature range. In one such system at Fermilab’s CMTF superfluid cryoplant, where the helium supply directly exchanges heat with liquid nitrogen, freezing of nitrogen occurred inside the heat exchanger due to heat exchanger flow imbalance during a cryoplant trip. Trapped vapor pockets of nitrogen within the frozen heat exchanger channels were formed while warming up the heat exchanger, creating high localized pressure and subsequent damage/rupture of the heat exchanger. Replacement of the heat exchanger was done, and modifications were made in the system to rectify future occurrences. The control system was updated to bypass the heat exchanger entirely if the incoming helium stream temperature drops below 76 K. This was done by repurposing two control valves as heat exchanger bypass valves that were previously used for a redundant 80 K adsorber in the coldbox. Additional modifications were made to further prevent return of large amount of cold helium gas from cold end during abrupt cryoplant shutdown. This modification has ensured high reliability of heat exchanger with prevention of freezing of nitrogen which can damage the heat exchanger.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Installation, commissioning, and testing of the HB650 CM at PIP2IT

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world’s most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand for PIP-II High-Beta 650 MHz (HB650) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). A description of the associated mechanical, electrical, and controls modifications necessary for testing HB650 cryomodules are provided. The cooldown and warmup requirements, procedures and associated controls logic is described.

43 PARTICLE ACCELERATORS↗

Design of Muon Campus full flow purifier for varying operational conditions and horizontal shipping

Constant ingress of impurities in Muon Campus g-2 experiment at Fermilab has resulted in reduction of efficiency of cryogenic expanders and occasional undesired downtime to flush the impurities. Due to insufficiency of current 0.06 kg/s mobile purifier, a full flow purifier is designed to be used in Muon Campus which purifies 0.24 kg/s of Helium throughput of 4 compressors through charcoal bed at 80 K and returns ambient Helium back to the system. The purifier is designed to be operated near liquid Nitrogen temperature during cold operations and up to 400 K during regeneration. Both warm and cold operational range of the purifier has required use of appropriate clearances in design due to expansion and contraction. The vessel of around 5.5 m height which is designed to be operated vertically is to be shipped horizontally. The asymmetrical position of heavy stainless steel heat exchanger in the purifier support frame and 5g vertical load design consideration for shipping has required use of shipping supports and heat exchanger rotational stops to comply with design requirements. FEA of purifier system is performed in cold, warm and shipping cases to verify that the purifier satisfies the design requirements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PIP-II cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2 K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated reliability analysis of the PIPII cryoplant. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to mitigate LINAC thermal cycling risks during planned and unplanned subsystem outages.

43 PARTICLE ACCELERATORS↗

Warm Compressor system Overview and status of the PIP-II cryogenic system

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.

43 PARTICLE ACCELERATORS↗

The Fermilab SSR1 and HB650 Synoptic and EPICS remote cryogenic control system

The 325MHz Single Spoke Resonator 1 (SSR1) Cryomodule (CM) has a 5.3-meter length, and it has 288-liter liquid helium @ 4.5K mode. The High Beta 650 MHz (HB650) CM contains six elliptical cavity cryomodules, has a 9.9-meter overall length and it has 530-liter liquid helium. The SSR1 and HB650 CM had been tested at Fermilab Cryomodule Test Facility (CMTF). Their cryogenic control system includes the Siemens Process Control System S7-400, Automation Direct DL205 PLC, and remote synoptic HMI/EPICS Phoebus GUI. This paper presents a method which has been successfully used by Fermilab PIP2 IT cryogenic remote on-line, real-time control systems.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of the PIP-II Cryoplant

The Proton Improvement Plan-II (PIP-II) is an essential upgrade to the Fermilab accelerator complex featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac). The Linac contains 23 SRF cryomodules with the SRF cavities operating at 2 K, a high temperature thermal shield at 40 K and low temperature intercepts at 4.5 K. The PIP-II cryoplant will provide the necessary cooling for the cryomodules and the cryogenic distribution system interconnecting cryoplant and cryomodules. This paper describes the evolution of the PIP-II cryoplant conceptual design and specifications, including the expected heat loads, required cooling features and the integrated design. The cryoplant capacity margin analysis and fast cool-down mode will also be discussed.

43 PARTICLE ACCELERATORS↗

Status of the LCLS-II Cryogenic Distribution System

The LINAC Coherent Light Source II (LCLS-II) located at SLAC National Accelerator Laboratory (SLAC) in Menlo Park, CA, is a U.S. Department of Energy project tasked to design and build a world-class x-ray free-electron laser facility for scientific research. The Linac has superconducting radio frequency cryomodules that are connected to the cryogenic plant by the Cryogenic Distribution System (CDS), which consists of distribution boxes with heat exchangers and reliefs, feed caps, end caps, and surface, vertical, and bypass transfer lines. The CDS components were designed and built to specification by industry. The components have been delivered and their installation at SLAC will be discussed. The as-built relief system design will be presented, showing minimization of relief inlet pressure drops while meeting capacity requirements. The relieving flow pressure drops along the lengths of the CDS to centrally located reliefs at the distribution box were analysed to satisfy Pressure Vessel and Process Piping Code criteria to ensure relief performance. The sub-atmospheric 2 K circuit relieving approach will be discussed, which includes a three-way diverter isolation valve suitable for sub-atmospheric service. The component anchoring load design approach and installation into concrete floor will be discussed. This addresses loading, including seismic loading, along the component’s load path to floor anchoring system.

43 PARTICLE ACCELERATORS↗