Search NASA⌕ Search

Engineering topics

Hansen, B. [Fermilab]

Publications and source records attributed to Hansen, B. [Fermilab].

There and Back Again: Reimagining Cryogenic Cooling for Scalable Arrays of Dilution Refrigerators for future Quantum Datacenters

While pulse tube cryocoolers enabled the rapid expansion of dilution refrigerator technology over the past two decades, the transition to large-scale quantum systems is now driving a reassessment of the DR’s higher-temperature-stage cooling strategies and how these systems can be effectively scaled in a modular way. Quasi-wet architectures based on centralized cryoplants and forced-flow helium distribution offer compelling advantages in energy efficiency, operational cost, and scalability. With appropriate redundancy, standardized interfaces, and optimized distribution system designs, these architectures will provide a practical and robust path forward for the next generation of quantum computing infrastructure.

Hansen, B. [Fermilab]↗

Integration and commissioning plan of Full Flow Purifier at Muon Campus

The Full Flow Purifier for Fermilab's Muon Campus uses a charcoal bed surrounded by a liquid nitrogen jacket to purify up to 240 g/s of helium gas. Fabrication by Ability Engineering Technology Inc. has been completed and the purifier delivered to Fermilab. It is the largest purifier to be used at Fermilab based on both capacity and size. A previous paper discussed the design of purifier for various operational conditions and horizontal shipping. The purifier is designed to withstand 5g force in vertical and 2g force in lateral and longitudinal directions. Transportation experience from vendor to Fermilab and within site is discussed. Integration of the purifier involved design and fabrication of a liquid nitrogen transfer line, regeneration system, and helium piping to connect it to Muon Campus cryogenic system. It also involved establishing electrical, instrumentation and controls connections to the system. Integration of the purifier is discussed in detail. The purifier is to be commissioned using up to 4 MYCOM helium compressors to supply helium and liquid nitrogen supplied by a 60,000-liter tank. Actual effectiveness of the 3-stream heat exchanger is to be estimated based on measured temperatures and flow rate. Impurity levels will be monitored at inlet and outlet of the purifier. Theoretical adsorption capacity of the purifier is calculated based on the measured temperatures and flowrates and is compared to actual adsorption capacity over time.

Subedi, J. [Fermilab] (ORCID:0009000185837576)↗

Helium recovery system at IB3a

The increasing need for optimal and sustainable use of cryogenic resources to support Fermilab’s scientific mission has highlighted the necessity of improving the Laboratory’s helium management practices. An assessment of cryogenic test facilities identified the Technical Division’s Industrial Building 3a (IB3A) as a key site requiring upgrades to integrate a helium recovery system. The IB3A facility is essential for characterizing and testing superconductors, cables, and coils for various R&D projects, including the US High-Luminosity LHC Accelerator Upgrade Project (AUP), Mu2e, and other external collaborations. Currently, the facility relies on 500 L helium Dewars and vents the vaporized helium directly into the atmosphere, leading to significant helium loss. Given the non-renewable nature of helium, recovering and reusing this resource is critical for the sustainability of Fermilab’s operations. To address this challenge, a project has been initiated to connect IB3A to an existing helium purification station and refrigeration system located in another building via a dedicated pipeline pass over the roof of several buildings. This solution will enable the efficient capture of vented helium, its transfer to the purification station, and subsequent liquefaction for reuse in future operations. The project includes a detailed design phase, specifying the pipeline route, flow control mechanisms, and integration with the existing cryogenic infrastructure, followed by phased implementation and commissioning. By implementing this pipeline connection and upgrading IB3A, Fermilab aims to significantly reduce helium waste, lower operational costs, and align with its commitment to sustainability. This initiative provides a model for resource-efficient cryogenic operations and reinforces the Laboratory’s capacity to support its science mission for the long term.

Porwisiak, D. [Fermilab]↗

Heat load measurements for the PIP-II pHB650 cryomodule

This study presents a brief overview of the 1st and 2nd phases and an in-depth analysis of the 3rd phase heat load testing performed on the pHB650 (prototype High Beta 650 MHz) cryomodule at PIP2IT (PIP-II Injector Test Facility), with a focus on both the results and the methodological advancements that have improved testing efficiency and accuracy. A key challenge identified in the testing campaign is the higher-than-expected heat loads observed in the first PIP-II (Proton Improvement Plan II) prototype cryomodules (pSSR1 and pHB650) tested at PIP2IT. Elevated heat loads are concerning given the fixed capacity of the PIP-II cryoplant that is currently being installed at Fermilab. However, understanding the sources of these elevated heat loads offers a critical opportunity to implement effective heat load mitigations on upcoming PIP-II cryomodules to stay within the available capacity of the PIP-II cryoplant. The study includes a summary of test results, descriptions of measurement procedures, and key observations on parameters directly and indirectly related to heat load measurements. Direct observations include measured heat loads and the effectiveness of JT heat exchanger under varying conditions, while indirect observation analyze factors such as the temperature distribution on the two-phase pipe and relief piping under varying conditions. Thermal acoustic oscillations (TAO) were identified during testing, which was mitigated by replacing the original G10 stem with a stainless steel stem equipped with wipers for the cryomodule cooldown valve. A major innovation during pHB650 Phase 3 testing was the development of an automated Python script to streamline data acquisition, analysis, and reporting of heat load results. This script automatically retrieved data from ACNET (Accelerator Control Network), performed heat load calculations, and generated detailed reports featuring plots and tables. This advancement significantly reduced manual labor and enhanced the thoroughness of data analysis compared to earlier campaigns. The heat load test reports were promptly uploaded to the electronic logbook shortly after each test, enabling rapid feedback and collaboration between the SRF and cryogenic teams. The heat load measurements included various components: HTTS (high-temperature thermal shield), LTTS (low-temperature thermal shield), 2K isothermal and non-isothermal heat loads. Results were recorded both within the cryomodule and between the bayonet can supply and return. Measurements were conducted under different operating conditions such as "standard", "linac", and "simulated dynamic". Additionally, HTTS and LTTS heat loads were calculated in real time, allowing for the tracking of thermal stability and identification of changes during testing, both in steady-state and transient conditions. The results of this testing campaign not only provide valuable insights into the performance of the pHB650 cryomodule but also highlight best practices and lessons learned that will inform future cryomodule testing at PIP2IT. These include adopting automated tools for data analysis, refining real-time measurement capabilities, and emphasizing detailed pre-test planning. The framework established in this campaign aims to set an improved standard for cryomodule testing and heat load reporting in future cryomodule test campaigns.

Porwisiak, D. [Fermilab; Wroclaw Tech. U.]↗