Exploration of Pluto

Two NASA-sponsored cost-constrained mission implementations for the exploration of Pluto are described. One is the Pluto Fast Flyby (PFF) mission, which utilizes an 83 kg spacecraft to be launched in 1998 aboard a Titan IV (Solid Rocket Motor Upgrade)/Centaur) for an about 7-year-long direct trajectory to Pluto, which will carry an integrated CCD-imaging/UV spectrometer, with a possible integrated IR spectrometer. The other is the Pluto-350 spacecraft, weighing about 316 kg, which will carry a broader instrument set, greater redundancy, and which will require greater than 11 year flight time. Pluto-350 will be launched in 2001 aboard a Delta or Atlas, toward earth and Jupiter swingbys to provide the energy to reach Pluto.

Staehle, Robert L.

The Virtual Mission - A step-wise approach to large space missions

Attention is given to the Virtual Mission (VM) concept, wherein multiple scientific instruments will be on different platforms, in different orbits, operated from different control centers, at different institutions, and reporting to different user groups. The VM concept enables NASA's science and application users to accomplish their broad science goals with a fleet made up of smaller, more focused spacecraft and to alleviate the difficulties involved with single, large, complex spacecraft. The concept makes possible the stepwise 'go-as-you-pay' extensible approach recommended by Augustine (1990). It enables scientists to mix and match the use of many smaller satellites in novel ways to respond to new scientific ideas and needs.

Hansen, Elaine

Concepts in distributed planning, scheduling, and control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling, and control must allow for: (1) interactive real-time remote operations; (2) responsive scheduling and rescheduling; (3) support of the full range of distributed science, application and commercial users; (4) interaction and cooperation among distributed users; and (5) efficient use of often onboard, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe approaches to distributed planning, scheduling and control functions that are based on resources and on a distributed knowledge hierarchy. We describe the scheduling functions as the component of the integrated space-ground Operations Management System. We include the integration of the planning and scheduling functions with the real-time operations control system, and we discuss automated scheduling assistants. These suggested approaches, taken from the users' point-of-view, have resulted in two prototype systems: Operations and Science Instrument Support package and Science User Resource Planning and Scheduling System.

Hansen, Elaine

Construction operation research

This is an introductory paper summarizing the research issues addressed by the Center for Space Construction (CSC) Operations Cluster and the research thrusts of its faculty and students.

Hansen, Elaine

Constructor selection research

The process of space construction is defined by the construction goal and by the construction system selected to accomplish that goal. The former provides the tasks that must be executed, while the latter provides the capabilities to execute them. This presentation outlines a high-level model of space construction and illustrates the relationship between constructor and task. The construction model is then utilized to develop a preliminary theory of constructor selection. The need for broad models of construction, constructor selection, and constructor management is identified. From this preliminary work it can be concluded that task decomposition is dependent upon both task and constructor; the selection process is separable from the optimization process; and that logical, defensible selection is possible.

Helleckson, Brent