Collimator irradiation studies in the Argonne Advanced Photon Source at energy densities expected in next-generation storage ring light sources
Not Available
Engineering topics
Publications and source records attributed to Harkay, K..
Not Available
We summarize the community-based consensus for improvements concerning education, public outreach, and inclusion in Accelerator Science and Engineering that will enhance the workforce in the USA. The improvements identified reflect the product of discussions held within the 2021-2022 Snowmass community planning process by topical group AF1: Beam Physics and Accelerator Education within the Accelerator Frontier. Although the Snowmass process centers on high-energy physics, this document outlines required improvements for the entire U.S. accelerator science and engineering enterprise because education of those entering and in the field, outreach to the public, and inclusion are inextricably linked.
Not Available
Fast fiber-optic (FFO) beam loss monitors (BLMs) installed with the first two superconducting undulators (SCUs) in the Advanced Photon Source storage ring have proven to be a useful diagnostic for measuring deposited charge (energy) during rapid beam loss events. The first set of FFOBLMs were installed outside the cryostat of the short SCU, a 0.33-m long device, above and below the beam centerline. The second set are mounted with the first 1.1-mlong SCU within the cryostat, on the outboard and inboard sides of the vacuum chamber. The next 1.1-m-long SCU is scheduled to replace the short SCU later in 2016 and will be fitted with FFOBLMs in a manner similar to original 1.1-m device. The FFOBLMs were employed to set timing and voltage for the abort kicker (AK) system. The AK helps to prevent quenching of the SCUs during beam dumps [1] by directing the beam away from the SC magnet windings. The AK is triggered by the Machine Protection System (MPS). In cases when the AK fails to prevent quenching, the FFOBLMs show that losses often begin before detection by the MPS.
Trapped ions in the APS Particle Accumulator Ring (PAR) lead to a positive coherent tune shift in both planes, which increases along the PAR cycle as more ions accumulate. This effect has been studied using an ion simulation code developed at SLAC. After modifying the code to include a realistic vacuum profile, multiple ionization, and the effect of shaking the beam to measure the tune, the simulation agrees well with our measurements. This code has also been used to evaluate the possibility of ion instabilities at the high bunch charge needed for the APS-Upgrade.
The APS-Upgrade will require the injector chain to provide high single bunch charge for swap-out injection. One possible limiting factor to achieving this is an observed reduction of injection efficiency into the booster synchrotron at high charge. We have simulated booster injection using the particle tracking code elegant, including a model for the booster impedance and beam loading in the RF cavities. The simulations point to two possible causes for reduced efficiency: energy oscillations leading to losses at high dispersion locations, and a vertical beam size blowup caused by ions in the Particle Accumulator Ring. We also show that the efficiency is much higher in an alternate booster lattice with smaller vertical beta function and zero dispersion in the straight sections.
Development of superconducting undulator (SCU) technology continues at the Advanced Photon Source (APS). The experience of building and successful operating the first short-length, 16-mm period length superconducting undulator SCU0 paved the way for a 1-m long, 18-mm period device— SCU18-1— which has been in operation since May 2015. The APS SCU team has also built and tested a 1.5-m long, 21-mm period length undulator as a part of the LCLS SCU R&D program, aimed at demonstration of SCU technology availability for free electron lasers. This undulator successfully achieved all the requirements including a phase error of 5° RMS. Our team has recently completed one more 1-m long, 18-mm period length undulator— SCU18-2— that is replacing the SCU0. We are also working on a helical SCU for the APS. The status of these projects will be presented.
Here, the Advanced Photon Source is a 7-GeV, third-generation synchrotron light source that provides x-rays in a wide range of spectra from a few keV to a hundred keV to 48 insertion device and 23 bending magnet beamlines for about 5000 hours per year.
Explore the source record for details and available documents.