Search NASA⌕ Search

Engineering topics

Harris, Tom

Publications and source records attributed to Harris, Tom.

27 records · Page 2

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100): Six-Month Progress Update [Slides]

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phase-out of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040, as established in Puerto Rico Energy Public Policy Act (Act 17). Since hurricanes Irma and Maria in September 2017, DOE and its national laboratories have provided Puerto Rico energy system stakeholders with tools, training, and modeling support to enable planning and operation of the electric power grid with more resilience against further disruptions. On February 2, 2022, DOE, FEMA, and six national laboratories launched the two-year Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) to conduct comprehensive analysis of stakeholder-driven pathways to Puerto Rico's energy future. The robust and objective energy analysis entails five activities, with an emphasis on power system reliability, resilience, and generation planning. This presentation provides a six-month progress update on the study, including presentation of four initial scenario frameworks defined with extensive stakeholder input.

14 SOLAR ENERGY↗

Estudio de Resiliencia de la Red Electrica de Puerto Rico y Transicion a Energia 100% Renovable (PR100): Actualizacion de Progreso de Seis Meses [Slides]

Puerto Rico se ha comprometido a satisfacer sus necesidades de electricidad con un 100% de energia renovable para 2050, junto con el cumplimiento de objetivos intermedios del 40% para 2025, el 60% para 2040, la eliminacion gradual de la generacion a base de carbon para 2028, y una mejora del 30% en la eficiencia energetica para 2040, segun lo establecido en la Ley de Politica Publica Energetica de Puerto Rico (Ley 17). Desde los huracanes Irma y Maria en septiembre de 2017, DOE y sus laboratorios nacionales han proporcionado a las partes interesadas del sistema energetico de Puerto Rico herramientas, adiestramiento y apoyo de modelaje para permitir la planificacion y el funcionamiento de la red electrica con mas resiliencia frente a nuevas interrupciones. El 2 de febrero de 2022, DOE, FEMA y seis laboratorios nacionales lanzaron el Estudio de Resiliencia de la Red Electrica de Puerto Rico y Transicion a la Energia 100% Renovable (PR100), de dos anos de duracion, para llevar a cabo un analisis exhaustivo de las vias impulsadas por las partes interesadas para el futuro energetico de Puerto Rico. El analisis energetico, solido y objetivo, comprende cinco actividades, con enfasis en la confiabilidad del sistema electrico, la resiliencia y la planificacion de la generacion. Esta presentacion provee una actualizacion de progreso del trabajo de seis meses sobre el Estudio, incluyendo la presentacion de cuatro escenarios iniciales definidos mediante un rol activo de las partes interesadas. This is the Spanish translation of NREL/PR-6A20-83432.

14 SOLAR ENERGY↗

PR100: Puerto Rico Grid Resilience and Transition to 100% Renewable Energy

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) comprehensively analyzes possible pathways for Puerto Rico to achieve its renewable energy goals while incorporating stakeholder perspectives and advancing energy resilience for all Puerto Ricans. PR100 is a wide-ranging and in-depth examination of Puerto Rico's energy system investment options. The findings are the culmination of two years of stakeholder engagement, scenario modeling, and impact analysis. The PR100 report and Implementation Roadmap contain a range of results and actions that reflect Puerto Rico's priorities around energy justice, resilience, and reliability. Led by the U.S. Department of Energy's Grid Deployment Office with funding from the Federal Emergency Management Agency, the PR100 study leveraged and integrated dozens of best-in-class models and in-depth analyses from researchers across six national laboratories: National Renewable Energy Laboratory (which led the study), along with Argonne National Laboratory, Lawrence Berkeley National Laboratory, Oak Ridge National Laboratory, Pacific Northwest National Laboratory, and Sandia National Laboratories (which conducted the study). For more information, please see the "PR100 Project Website" resource below.

Array↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

To support federal and commercial building owners in understanding, procuring, and implementing monitoring-based commissioning (MBCx) software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into—and benefit—each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

Integrating monitoring-based commissioning (MBCx) software tools into performance contracts is a timely topic given recent developments in MBCx software offerings and the growing number of MBCx deployments nationwide. Many commercial building owners have started to install MBCx software tools that tie in advanced metering infrastructure, building automation systems, and local weather data to enable ongoing commissioning and identify energy conservation measures. To support federal and commercial building owners in understanding, procuring, and implementing MBCx software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into - and benefit - each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NLR Engage™: A Calliope Web Environment for Collaborative Energy Systems Modeling and Planning [SWR-20-16]

NLR Engage™ is a free, open-access energy system planning tool that allows multiple users/stakeholders to develop and collaborate on capacity expansion models. The tool, developed at the National Laboratory of the Rockies (NLR), provides a collaborative and easy-to-use interface built on Calliope, a multi-scale energy systems modeling framework. Visit the NLR hosted webtool at https://engage.nlr.gov/en/login/?next=/en/

Harris, Tom↗

Feeder Voltage Regulation with High-Penetration PV Using Advanced Inverters and a Distribution Management System: A Duke Energy Case Study

Duke Energy, Alstom Grid, and the National Renewable Energy Laboratory teamed up to better understand the impacts of solar photovoltaics (PV) on distribution system operations. The core goal of the project is to compare the operational - specifically, voltage regulation - impacts of three classes of PV inverter operations: 1.) Active power only (Baseline); 2.) Local inverter control (e.g., PF...not equal...1, Q(V), etc.); and 3.) Integrated volt-VAR control (centralized through the distribution management system). These comparisons were made using multiple approaches, each of which represents an important research-and-development effort on its own: a) Quasi-steady-state time-series modeling for approximately 1 year of operations using the Alstom eTerra (DOTS) system as a simulation engine, augmented by Python scripting for scenario and time-series control and using external models for an advanced inverter; b) Power-hardware-in-the-loop (PHIL) testing of a 500-kVA-class advanced inverter and traditional voltage regulating equipment. This PHIL testing used cosimulation to link full-scale feeder simulation using DOTS in real time to hardware testing; c) Advanced visualization to provide improved insights into time-series results and other PV operational impacts; and d) Cost-benefit analysis to compare the financial and business-model impacts of each integration approach.

14 SOLAR ENERGY↗

Interconnection Assessment Methodology and Cost Benefit Analysis for High-Penetration PV Deployment in the Arizona Public Service System

In an effort to better understand the impacts of high penetrations of photovoltaic (PV) generators on distribution systems, Arizona Public Service and its partners completed a multi-year project to develop the tools and knowledge base needed to safely and reliably integrate high penetrations of utility- and residential-scale PV. Building upon the APS Community Power Project-Flagstaff Pilot, this project investigates the impact of PV on a representative feeder in northeast Flagstaff. To quantify and catalog the effects of the estimated 1.3 MW of PV that will be installed on the feeder (both smaller units at homes and large, centrally located systems), high-speed weather and electrical data acquisition systems and digital 'smart' meters were designed and installed to facilitate monitoring and to build and validate comprehensive, high-resolution models of the distribution system. These models are being developed to analyze the impacts of PV on distribution circuit protection systems (including coordination and anti-islanding), predict voltage regulation and phase balance issues, and develop volt/VAr control schemes. This paper continues from a paper presented at the 2014 IEEE PVSC conference that described feeder model evaluation and high penetration advanced scenario analysis, specifically feeder reconfiguration. This paper presents results from Phase 5 of the project. Specifically, the paper discusses tool automation; interconnection assessment methodology and cost benefit analysis.

14 SOLAR ENERGY↗

Plasmonic enhanced ultrafast switch.

Ultrafast electronic switches fabricated from defective material have been used for several decades in order to produce picosecond electrical transients and TeraHertz radiation. Due to the ultrashort recombination time in the photoconductor materials used, these switches are inefficient and are ultimately limited by the amount of optical power that can be applied to the switch before self-destruction. The goal of this work is to create ultrafast (sub-picosecond response) photoconductive switches on GaAs that are enhanced through plasmonic coupling structures. Here, the plasmonic coupler primarily plays the role of being a radiation condenser which will cause carriers to be generated adjacent to metallic electrodes where they can more efficiently be collected.

42 ENGINEERING↗