First ITER CS module test results

The ITER Central Solenoid (CS) is under fabrication by the US ITER organization and its subcontractors. US ITER will supply seven modules to ITER IO, six of which will be assembled in a stack that forms the ITER Central Solenoid, with one as a spare. The first module fabrication has been completed by General Atomics (GA) at their facility and has begun testing including high voltage testing, Paschen testing in the vacuum and then testing at 4.5 K and up to 40 kA in order to demonstrate compliance of the coil to ITER requirements. In the paper we present the Test Plan and results of the CS Module performance tests, especially at 40 kA current. Herein, AC losses, joint resistances and hydraulic characteristics of the coil are all measured. Displacements of the coil height and hoop strain of the CS Module are also measured to verify structural and mechanical characteristics of the coil along with cooldown shrinkage of the coil. This information is used for verification of the stack behavior of CS in ITER operation. The test results and preliminary analyses results are presented, compared to expectations, and discussed. All measured parameters suggest that the CS module will perform well in ITER machine.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Modification of Central Solenoid Model Coil Test Facility for Rapid Testing of CICC

This document describes preliminary design modifications to the CSMC Test Facility in JAEA, Naka, Japan that will allow rapid test and change-out of CS conductor samples while simultaneously achieving more precise and reliable characterization of those samples than is presently achievable elsewhere. The current philosophy for CS conductor testing is to test an Insert in CSMC followed by SULTAN testing. The SULTAN facility has very short length in field and a short length between the High Field Zone and the joints. This makes it difficult to obtain uniform distribution of current in the cable at low voltage levels, which defines the current sharing temperature. In a real magnet, like ITER CS, there is a long length of conductor in the highest field. Such conditions provide a more uniform current distribution near current sharing. The modified facility will serve as an economical tool for ITER conductor testing. The test item will be a three turn sample, approximately 15 m long, placed in the background field of the CSMC. This new mode of operation will reduce the time of cool-down, warm-up and installation of the sample into the CSMC facility, which should significantly reduce the cost of a test per sample.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗