Search NASA⌕ Search

Engineering topics

Hazelwood, K.

Publications and source records attributed to Hazelwood, K..

Linear Modelling from Betatron Phase Measurements at the Fermilab Recycler NOvA ring

Utilizing the measurement of coherent betatron oscillation phase has emerged as fast and precise approach for identifying and rectifying errors in implementing a desired lattice in CESR (Cornell Electron Storage Ring). One key advantage of betatron phase measurement over β measurement is its sensitivity to phase variations between widely separated points. This methodology has been successfully implemented for the Recycler NOvA Ring at Fermilab, with the adoption of TAO (Tool for Accelerator Optics) developed by Cornell University. By employing this technique, a linear model of the Recycler NOvA ring is established, enabling the correction of quadrupole errors.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Fermilab Recycler Collimation System Design

To provide 700 kW proton beams for neutrino production in the NuMI facility, we employ slip stacking in the Recycler with transfer to the Main Injector for recapture and acceleration. Slip stacking with 12 Booster batches per 1.33 sec cycle of the Main Injector has been implemented and briefly tested while extensive operation with 8 batches and 10 batches per MI cycle has been demonstrated. Operation in this mode since 2013 shows that loss localization is an essential component for long term operation. Beam loss in the Recycler will be localized in a collimation region with design capability for absorbing up to 2 kW of lost protons in a pair of 20-Ton collimators (absorbers). This system will employ a two stage collimation with a thin molybdenum scattering foil to define the bottom edge of both the injected and decelerated-for-slipping beams. Optimization and engineering design of the collimator components and radiation shielding are based on comprehensive MARS15 simulations predicting high collimation efficiency as well as tolerable levels of prompt and residual radiation. The system installation during the Fermilab 2016 facility shutdown will permit commissioning in the subsequent operating period.

43 PARTICLE ACCELERATORS↗