Search NASASearch

Engineering topics

Heard, W. L., Jr.

Publications and source records attributed to Heard, W. L., Jr..

At least 19 records

Construction and control of large space structures

Recent NASA research efforts on space construction are reviewed. Preliminary results of the EASE/ACCESS Shuttle experiments are discussed. A 45-foot beam was constructed on orbit in 30 minutes using a manual assembly technique at a work station. A large tetrahedron was constructed several times using a free floating technique. The capability of repair, utilities installation, and handling the structures using a mobile foot restraint on the RMS was also demonstrated. Implications of the experiments for space station are presented. Models of 5-meter space station structure together with neutral buoyancy simulations suggest manual assembly techniques are feasible. Selected research on control of flexible structures is discussed.

Card, M. F.

Construction and control of large space structures

Recent NASA research efforts on space construction are reviewed. Preliminary results of the EASE/ACCESS Shuttle experiments are discussed. A 45-foot beam was constructed on orbit in 30 minutes using a manual assembly technique at a work station. A large tetrahedron was constructed several times using a free floating technique. The capability of repair, utilities installation, and handling the structures using a mobile foot restraint on the RMS was also demonstrated. Implications of the experiments for Space Station are presented. Models of 5-meter Space Station structure together with neutral buoyancy simulations suggest manual assembly techniques are feasible. Selected research on control of flexible structures is discussed. To support planned flight experiments, studies of the design and optimal placement of distributed active dampers are underway.

Card, M. F.

Results of the ACCESS space construction Shuttle flight experiment

The ACCESS (Assembly Concept for Construction of Erectable Space Structure) experiment was launched on the Orbiter Atlantis on November 26, 1985. ACCESS was designed to study manual assembly of a 45-foot long truss structure by two astronauts working in space suits in the Orbiter cargo bay. This paper describes the experiment and hardware used, and compares on-orbit construction timelines to underwater neutral buoyancy data. In-flight photographs of assembly tasks and comments made by the crew at the postflight debriefing are also included. It was found that all tasks could be accomplished and that assembly times compared favorably with neutral buoyancy data.

Heard, W. L., Jr.

Assembly Concept for Construction of Erectible Space Structure (ACCESS) Neutral Buoyancy Testing Results

ACCESS, which is an acronym for Assembly Concept for Construction of Erectable Space Structure, is a planned Shuttle flight experiment to assess the potential of a manual on orbit construction concept and generate assembly data for correlation of ground test data. The individual parts (struts and nodal joints used to interconnect the struts) of the beam truss shown attached to the Shuttle in the figure are unpackaged and assembled by two astronauts working from fixed foot restraints (work stations). The planned flight experiment is described and results of the baseline neutral buoyancy simulation of the flight test are presented.

Heard, W. L., Jr.

Swing-arm beam erector (SABER) concept for single astronaut assembly of space structure

Results are presented of tests conducted to evaluate a mobile work station/assembly fixture concept that would mechanically assist an astronaut in the on-orbit manual assembly of erectable truss-beams. The concept eliminates astronaut manual translation by use of a motorized work platform with foot restraints. The tests involved assembly of a tetrahedral truss-beam by a test subject in simulated zero gravity (neutral bouyancy in water). A three-bay truss-beam was assembled from 30 aluminum struts with quick-attachment structural joints. The results show that average on-orbit assembly rates of 2.1 struts per minute can be expected for struts of the size employed in these tests.

Watson, J. J.

ACCESS (Assembly Concept for Construction of Erectable Space Structure) - A Shuttle flight experiment

ACCESS is a planned Shuttle flight experiment to assess the potential of an on-orbit construction concept designed for efficient manual assembly of a space truss. The experiment, which is scheduled for launch November 27, 1985, on the Space Transportation System (STS) flight 61-B, uses two astronauts secured in fixed foot restraints located in the Shuttle cargo bay to assemble a 45-foot long aluminum truss beam from 93 tubular struts and 33 nodal joints. Neutral buoyancy simulations of the flight experiment indicate the truss can be assembled in less than thirty minutes. Structural assembly, structural repair, flexible cable attachment and manual manipulation of the truss is also planned for the experiment using an astronaut secured in the Manipulator Foot Restraint attached to the Remote Manipulator System arm. Flight assembly data will be generated for correlation of the neutral buoyancy ground test data. This paper describes the ACCESS flight experiment and presents results of the neutral buoyancy development and training tests.

Heard, W. L., Jr.

Erectable beam experiment

The erectable beam applicability to the MAST/STEP experiment is summarized. High manual assembly rates were demonstrated in neutral buoyancy tests and it is suggested that use of an erectable beam would eliminate extension/retraction complexity associated with deployable beams. The erectable beam assembly aid is easily adaptable to general truss configurations and structural appendages could be accommodated with the use of actuators. The ACCESS flight experiment precedes MAST by 2 to 3 years and will provide mature, space proven assembly/disassembly technology on which to base the MAST experiment.

Heard, W. L., Jr.

A mobile work station concept for mechanically aided astronaut assembly of large space trusses

This report presents results of a series of truss assembly tests conducted to evaluate a mobile work station concept intended to mechanically assist astronaut manual assembly of erectable space trusses. The tests involved assembly of a tetrahedral truss beam by a pair of test subjects with and without pressure (space) suits, both in Earth gravity and in simulated zero gravity (neutral buoyancy in water). The beam was assembled from 38 identical graphite-epoxy nestable struts, 5.4 m in length with aluminum quick-attachment structural joints. Struts and joints were designed to closely simulate flight hardware. The assembled beam was approximately 16.5 m long and 4.5 m on each of the four sides of its diamond-shaped cross section. The results show that average in-space assembly rates of approximately 38 seconds per strut can be expected for struts of comparable size. This result is virtually independent of the overall size of the structure being assembled. The mobile work station concept would improve astronaut efficiency for on-orbit manual assembly of truss structures, and also this assembly-line method is highly competitive with other construction methods being considered for large space structures.

Heard, W. L., Jr.

Mobile work station concept for assembly of large space structures (zero gravity simulation tests)

The concept presented is intended to enhance astronaut assembly of truss structure that is either too large or complex to fold for efficient Shuttle delivery to orbit. The potential of augmented astronaut assembly is illustrated by applying the result of the tests to a barebones assembly of a truss structure. If this structure were assembled from the same nestable struts that were used in the Mobile Work Station assembly tests, the spacecraft would be 55 meters in diameter and consist of about 500 struts. The struts could be packaged in less than 1/2% of the Shuttle cargo bay volume and would take up approximately 3% of the mass lift capability. They could be assembled in approximately four hours. This assembly concept for erectable structures is not only feasible, but could be used to significant economic advantage by permitting the superior packaging feature of erectable structures to be exploited and thereby reduce expensive Shuttle delivery flights.

Heard, W. L., Jr.

General description of nestable column structural and assembly technology

The superior packaging characteristics of nestable column structural elements make this concept attractive for application to missions space shuttle missions requiring large and/or high stiffness, or complex structures. Photographs depict investigations pursued relative to defining structural and assembly technology using these structural elements. The neutral buoyancy facility assembly simulation tests and the large space structure mobile work station are featured.

Bush, H. G.

EVA assembly of large space structure element

The results of a test program to assess the potential of manned extravehicular activity (EVA) assembly of erectable space trusses are described. Seventeen tests were conducted in which six "space-weight" columns were assembled into a regular tetrahedral cell by a team of two "space"-suited test subjects. This cell represents the fundamental "element" of a tetrahedral truss structure. The tests were conducted under simulated zero-gravity conditions. Both manual and simulated remote manipulator system modes were evaluated. Articulation limits of the pressure suit and zero gravity could be accommodated by work stations with foot restraints. The results of this study have confirmed that astronaut EVA assembly of large, erectable space structures is well within man's capabilities.

Bement, L. J.

Structural sizing considerations for large space structures

A number of missions for the space shuttle were proposed which involve placing large truss platforms on-orbit. These platforms range in size from tens of meters in span for reflector application to several thousand meters for solar power collector application. These proposed sizes and the operational requirements considered are unconventional in comparison to Earthbound structures and little information exists concerning efficient proportions of the structural elements forming the framework of the platforms. Such proportions are of major concern because they have a strong influence on the packaging efficiency and, thus, the transportation effectiveness of the shuttle. The present study is undertaken to: (1) identify efficient ranges of application of deployable and erectable platforms configured for shuttle transport to orbit, and (2) determine sensitivity to key parameters of minimum mass deployable and erectable platform designs.

Heard, W. L., Jr.

Recent advances in structural technology for large deployable and erectable spacecraft

Ultra-low mass deployable and erectable truss structure designs for spacecraft are identified using computerized structural sizing techniques. Extremely slender strut proportions are shown to characterize minimum mass spacecraft which are designed for shuttle transport to orbit. Discrete element effects using a recently developed buckling theory for periodic lattice type structures are presented. An analysis of fabrication imperfection effects on the surface accuracy of four different antenna reflector structures is summarized. The tetrahedral truss has the greatest potential of the structures examined for application to accurate or large reflectors. A deployable module which can be efficiently transported is identified and shown to have significant potential for application to future antenna requirements. Investigations of erectable structure assembly are reviewed.

Bush, H. G.

Deployable and erectable concepts for large spacecraft

Computerized structural sizing techniques were used to determine structural proportions of minimum mass tetrahedral truss platforms designed for low Earth and geosynchronous orbit. Optimum (minimum mass) deployable and erectable, hexagonal shaped spacecraft are sized to satisfy multiple design requirements and constraints. Strut dimensions characterizing minimum mass designs are found to be significantly more slender than those conventionally used for structural applications. Comparison studies show that mass characteristics of deployable and erectable platforms are approximately equal and that the shuttle flights required by deployable trusses become excessive above certain critical stiffness values. Recent investigations of eractable strut assembly are reviewed. Initial erectable structure assembly experiments show that a pair of astronauts can achieve EVA assembly times of 2-5 min/strut and studies indicate that an automated assembler can achieve times of less than 1 min/strut for around the clock operation.

Bush, H. G.

Recent advances in structural technology for large deployable and erectable spacecraft

Ultra-low mass deployable and erectable truss structure designs for spacecraft are identified using computerized structural sizing techniques. Extremely slender strut proportions are shown to characterize minimum mass spacecraft which are designed for Shuttle transport to orbit. Analytical results are presented which demonstrate discrete element effects using a recently developed buckling theory for periodic lattice type structures. An analysis of fabrication imperfection effects on the surface accuracy of four different antenna reflector structures is summarized. This study shows the tetrahedral truss to have the greatest potential of the structures examined for application to accurate or large reflectors. A deployable module which can be efficiently transported is identified and shown to have significant potential for application to future antenna requirements. Recent investigations of erectable structure assembly are reviewed. Initial experiments simulating astronaut assembly by extra-vehicular activity (EVA) show that a pair of astronauts can achieve assembly times of 2-5 min/strut. Studies indicate that an automated assembler can achieve times of less than 1 min/strut on an around-the-clock basis.

Bush, H. G.

Effect of orbital transfer loads on large platforms

A preliminary automated structural sizing procedure suitable for conceptual design and early tradeoff studies of large truss platforms configured for shuttle transportation to LEO is discussed as well as some orbital transfer design considerations. Platforms that are sized to withstand orbital transfer loads for the LEO to GEO maneuver are compared to platforms sized only for LEO application. It is concluded that for platforms supporting low mass distributed payloads, platform and strut frequency requirements are strong design drivers for LEO applications. The struts are found to be extremely slender, thinswalled, and of small diameter. If full advantage is to be taken of these minimum mass designs, a manufacturing capability must be developed for long straight struts. For platforms that are to be transferred from LEO to GEO in a deployed state, the orbital transfer loads become design drivers. However, even for an initial thrust-to-weight ratio equal to 0.1, a platform on the order of 100 m diameter appears packageable with its OTV in one shuttle flight, and larger platforms appear possible at lower thrust-to-weight ratios.

Walz, J. E.

Deployable and erectable concepts for large spacecraft

The structural proportions of minimum-mass tetrahedral truss platforms designed for low earth and geosynchronous orbit are determined by means of computerized sizing techniques, taking into account multiple design requirements and constraints. Strut dimensions characterizing minimum mass designs are found to be significantly more slender than those used for conventional structural applications. It is also shown that the number of shuttle flights required by deployable trusses becomes excessive above certain critical stiffness values, and that an automated assembler can achieve rates of 1 min/strut, by comparison with 2-5 min/strut for two astronauts using manual labor.

Bush, H. G.

Structural concepts for large spacecraft

Design concepts for deployable spacecraft structures are examined with particular emphasis on mass/area optimization, stowability, and assembly, and the relations of these requirements to functional design parameters. Component and modular concepts for platforms and reflectors, structural configurations for long columns, pretension columns, and joint concepts are discussed. A brief overview of astronaut and automated assembly studies is included.

Bush, H. G.