Search NASA⌕ Search

Engineering topics

Heese, R.

Publications and source records attributed to Heese, R..

Modification of the Booster Extraction Straight Section

In the process of conceptual design of the NSLS-II booster we developed an extraction layout based on a single strong pulsed septum turning the beam outside the booster vacuum chamber. This layout may not be ideal since pulsed power supply is not reproducible and its shot-to-shot voltage fluctuations will lead to an increase in the effective emittance of the extracted beam. Alternative solution1 is to divide the extraction in two magnets – a weak pulsed magnet and a strong DC magnet. This concept has been implemented in the current extraction layout.

42 ENGINEERING↗

NSLS-II injector commissioning and initial operation

The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

43 PARTICLE ACCELERATORS↗

Proceedings of Pulsed Magnet Design and Measurement Workshop

The goals of the Workshop are to assess the design of pulsed system at the NSLS-II and establish mitigation strategies for critical issues during development. The focus of the Workshop is on resolving questions related to the set-up of the pulsed magnet laboratory, on measuring the pulsed magnet's current waveforms and fields, and on achieving tight tolerances on the magnet's alignment and field quality.

43 PARTICLE ACCELERATORS↗

NSLS-II Booster Design

The NSLS-II booster is required to produce a 3 GeV bunch train with an accelerated charge of about 10 nC at a repetition rate of 1 Hz and a horizontal beam emittance around 40 nm-rad. Injection into the booster ring takes place at an energy of 200 MeV. The booster magnetic field and RF voltage are ramped for 500 ms to accelerate the electron beam from the injection energy to the nominal energy of 3 GeV. At the maximum field of the ramp, the electron beam is extracted from the booster and injected into the Storage Ring. We allow for a maximum beam loss of 30% during injection, 20% maximum loss during extraction. Thus the charge to be accelerated in the booster is 10 nC which corresponds to an average beam current of 20 mA. Since the dynamic aperture of the storage ring is limited, the quality of the injected beam has received serious consideration. In particular, the booster emittance may impact the injection efficiency. As the beam intensity in the storage ring is intended to be quasi-constant by frequently (once per minute) injecting beam into the storage ring (top-off injection) good injection efficiency is mandatory to minimize the frequency of top-off cycles, radiation dose induced by the lost electrons and perturbations of the stored beam orbit driven by the injection transients. During the last 10 years, many 3 rd generation synchrotron light facilities have been put into operation. Nearly all of these facilities have chosen a full energy booster synchrotron as an injector together with a low energy linac as pre-injector.

43 PARTICLE ACCELERATORS↗

Alternative Injection Schemes for the NSLS-II Storage Ring

KEK has been investigating the use of pulsed multipoles for injection the Photon Factory and for KEKB. A pulsed quadrupole magnet was installed in the PF. It worked successfully with the exception that it caused beam envelope oscillations when pulsed. They have subsequently designed a pulsed sextupole for injection. The goal would be to have a null field for the stored beam with no gradient and still have an off axis field for the injected beam. In this document we look at the possibility of using a pulsed sextupole in the NSLS-II Storage Ring for injection.

36 MATERIALS SCIENCE↗