Successful cleanroom installation of PIP-II SSR2 coupler using robotic arm

To minimize the contamination of SRF cavities, remote installation techniques are needed during the installation of components. Recent work at Fermilab has been performed to begin the process of developing techniques for assembling cavities using robotics. Multiple alignment methods were prototyped including alignment and computer vision methods. Using a remotely controlled robotic arm, the alignment and installation of couplers have been successfully performed on prototype PIP-II SSR2 cavities in a cleanroom. The installation process will be shown to show to demonstrate the potential of future installations on other cavities and cavity ancillaries.

43 PARTICLE ACCELERATORS↗

Standardization of Ancillary Installation Tooling for SRF Cavities at Fermilab

For assemblies of cavities in cleanrooms, single-use tooling systems are made for the alignment and installation of ancillary components such as couplers and bellows. To try and minimize the amount of tooling sets used, a design has been created to standardize alignment features to allow for assembly of different components with one set of tooling. A prototype set of tooling has been developed to with the required degrees of freedom for multiple assemblies while minimizing deformation during the assembly process. Prototype designs have been created for PIP-II SSR2 and 650 Cavities and for AUP Crab Cavities. Using 3D printing, this tooling can be quickly adjusted to allow for different ancillary components. The development process and status of the design will be discussed.

Narug, Colin↗

Contribution of IN2P3 to PIP-II Project: Plans and Progress

IJCLab is one of the labs of IN2P3 (National institute of nuclear and particle physics), one of the ten research institutes composing the French National Center for Scientific Research (CNRS). Since 2018, IJCLab has been involved in the PIP-II project, assisting with the design, development, and qualification of accelerator components for the SSR2 (Single Spoke Resonator type 2) section of the superconducting linac. The first pre-production components (cavity, coupler, and tuner) have been fabricated, and some of the first qualification tests have been performed at IJCLab. This paper will summarize the complete scope of IJCLab¿s contributions to PIP-II and give updates on the performances of the first pre-production components.

43 PARTICLE ACCELERATORS↗

Final Design of the Production SSR1 Cryomodule for PIP-II Project at Fermilab

This contribution reports the design of the production Single Spoke Resonator Type 1 Cryomodule (SSR1 CM) for the PIP-II project at Fermilab. The innovative design is based on a structure, the strongback, which supports the coldmass from the bottom, stays at room temperature during operations, and can slide longitudinally with respect to the vacuum vessel. The Fermilab style cryomodule developed for the prototype Single Spoke Resonator Type 1 (pSSR1), the prototype High Beta 650 MHz (pHB650), and preproduction Single Spoke Resonator Type 2 (ppSSR2) cryomodules is the baseline of the present design. The focus of this contribution is on the results of calculations and finite element analyses performed to optimize the critical components of the cryomodule: vacuum vessel, strongback, thermal shield, and magnetic shield.

43 PARTICLE ACCELERATORS↗

Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for the PIP-II Project at Fermilab

The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic window and surrounding brazes, which can see relatively high stress during an excitation event. Since the antenna design is new, and because of the setback failure would create, a cyclic stress test was devised for the antenna. This paper presents the experimental methods, setup, and results of the test.

43 PARTICLE ACCELERATORS↗

Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers

Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Design of the 650 MHz High Beta Prototype Cryomodule for PIP-II at Fermilab

The Proton Improvement Plan II (PIP-II) is the first U.S. accelerator project that will have significant contributions from international partners. The prototype High Beta 650 MHz cryomodule (pHB650 CM) is designed by an integrated design team, consisting of Fermilab (USA), CEA (France), UKRI-STFC (UK), and RRCAT (India). The manufacturing & assembly of this prototype cryomodule will be done at Fermilab, whereas the production cryomodules will be manufactured and/or assembled by UKRI-STFC, RRCAT, or Fermilab. Similar to the prototype Single Spoke Resonator 1 cryomodule (pSSR1 CM), this cryomodule is based on a strong-back at room temperature supporting the coldmass. The pSSR1 CM led to significant lessons being learnt on the design, procurement, and assembly processes. These lessons were incorporated into the design and processes for the pHB650 CM. Amongst many challenges faced, the main challenges of the pHB650 CM design were to make the cryomodule compatible to overseas transportation and to design components that can be procured in USA, Europe, and India.

43 PARTICLE ACCELERATORS↗

Transportation Analysis of the Fermilab High-Beta 650 MHz Cryomodule

The prototype High-Beta 650 MHz cryomodule for the PIP-II project will be the first of its kind to be transported internationally, and the round trip from FNAL to STFC UKRI will use a combination of road and air transit. Transportation of an assembled cryomodule poses a significant technical challenge, as excitation can generate high stresses and cyclic loading. To accurately assess the behavior of the cryomodule, Finite Element Analysis (FEA) was used to analyze all major components. First, all individual components were studied. For the critical/complex components, the analysis was in fine detail. Afterwards, all models were brought to a simplified state (necessary for computational expenses), verified to have the same behavior as their detailed counterparts, and combined to form larger sub-assemblies, with the ultimate analysis including the full cryomodule. We report the criteria for acceptance and methods of analysis, and results for selected components and sub-assemblies.

43 PARTICLE ACCELERATORS↗