Search NASA⌕ Search

Engineering topics

Hemsworth, R

Publications and source records attributed to Hemsworth, R.

Status of the 1 MeV Accelerator Design for ITER NBI

The beam source of neutral beam heating/current drive system for ITER is needed to accelerate the negative ion beam of 40A with D{sup -} at 1 MeV for 3600 sec. In order to realize the beam source, design and R and D works are being developed in many institutions under the coordination of ITER organization. The development of the key issues of the ion source including source plasma uniformity, suppression of co-extracted electron in D beam operation and also after the long beam duration time of over a few 100 sec, is progressed mainly in IPP with the facilities of BATMAN, MANITU and RADI. In the near future, ELISE, that will be tested the half size of the ITER ion source, will start the operation in 2011, and then SPIDER, which demonstrates negative ion production and extraction with the same size and same structure as the ITER ion source, will start the operation in 2014 as part of the NBTF. The development of the accelerator is progressed mainly in JAEA with the MeV test facility, and also the computer simulation of beam optics also developed in JAEA, CEA and RFX. The full ITER heating and current drive beam performance will be demonstrated in MITICA, which will start operation in 2016 as part of the NBTF.

43 PARTICLE ACCELERATORS↗

Design and Overview of 100 kV Bushing for the DNB Injector of ITER

The 100 kV bushing is one of the most important and technologically challenging Safety Important Class (SIC) components of the Diagnostic Neutral Beam (DNB) injector of ITER. It forms interface between gas insulated electrical transmission line and torus primary vacuum and acts as a vacuum feedthrough of ITER. Design optimization has been carried out to meet the electric and structural requirements based on its classification. Unlike HNB bushing, single stage bushing is designed to provide 100 kV isolation. Finite Element Analysis (FEA) based optimization has been carried out for electrostatic and structural analysis. Manufacturing assembly sequence is studied and presented in this paper. However validation of the same is foreseen from manufacturer.

43 PARTICLE ACCELERATORS↗

RAMI Analyses of Heating Neutral Beam and Diagnostic Neutral Beam Systems for ITER

A RAMI (Reliability, Availability, Maintainability, Inspectability) analysis has been performed for the heating (and current drive) neutral beam (HNB) and diagnostic neutral beam (DNB) systems of the ITER device. The objective of these analyses is to implement RAMI engineering requirements for design and testing to prepare a reliability-centred plan for commissioning, operation, and maintenance of the system in the framework of technical risk control to support the overall ITER Project. These RAMI requirements will correspond to the RAMI targets for the ITER project and the compensating provisions to reach them as deduced from the necessary actions to decrease the risk level of the function failure modes. The RAMI analyses results have to match with the procurement plan of the systems.

43 PARTICLE ACCELERATORS↗

Progress on the heating and current drive systems for ITER

The electron cyclotron (EC), ion cyclotron (IC), heating-neutral beam (H-NB) and, although not in the day 1 baseline, lower hybrid (LH) systems intended for ITER have been reviewed in 2007/2008 in light of progress of physics and technology in the field. Although the overall specifications are unchanged, notable changes have been approved. Firstly, it has been emphasized that the H&CD systems are vital for the ITER programme. Consequently, the full 73 MW should be commissioned and available on a routine basis before the D/T phase. Secondly, significant changes have been approved at system level, most notably: the possibility to operate the heating beams at full power during the hydrogen phase requiring new shine through protection; the possibility to operate IC with 2 antennas with increased robustness (no moving parts); the possible increase to 2 MW of key components of the EC transmission systems in order to provide an easier upgrading of the EC power as may be required by the project; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognised. The review describes these changes and their rationale.

08 HYDROGEN↗

Status of the Negative Ion Based Heating and Diagnostic Neutral Beams for ITER

The current baseline of ITER foresees 2 Heating Neutral Beam (HNB's) systems based on negative ion technology, each accelerating to 1 MeV 40 A of D{sup -} and capable of delivering 16.5 MW of D{sup 0} to the ITER plasma, with a 3rd HNB injector foreseen as an upgrade option. In addition a dedicated Diagnostic Neutral Beam (DNB) accelerating 60 A of H{sup -} to 100 keV will inject {approx_equal}15 A equivalent of H{sup 0} for charge exchange recombination spectroscopy and other diagnostics. Recently the RF driven negative ion source developed by IPP Garching has replaced the filamented ion source as the reference ITER design. The RF source developed at IPP, which is approximately a quarter scale of the source needed for ITER, is expected to have reduced caesium consumption compared to the filamented arc driven ion source. The RF driven source has demonstrated adequate accelerated D{sup -} and H{sup -} current densities as well as long-pulse operation. It is foreseen that the HNB's and the DNB will use the same negative ion source. Experiments with a half ITER-size ion source are on-going at IPP and the operation of a full-scale ion source will be demonstrated, at full power and pulse length, in the dedicated Ion Source Test Bed (ISTF), which will be part of the Neutral Beam Test Facility (NBTF), in Padua, Italy. This facility will carry out the necessary R and D for the HNB's for ITER and demonstrate operation of the full-scale HNB beamline. An overview of the current status of the neutral beam (NB) systems and the chosen configuration will be given and the ongoing integration effort into the ITER plant will be highlighted. It will be demonstrated how installation and maintenance logistics have influenced the design, notably the top access scheme facilitating access for maintenance and installation. The impact of the ITER Design Review and recent design change requests (DCRs) will be briefly discussed, including start-up and commissioning issues. The low current hydrogen phase now envisaged for start-up imposed specific requirements for operating the HNB's at full beam power. It has been decided to address the shinethrough issue by installing wall armour protection, which increases the operational space in all scenarios. Other NB related issues identified by the Design Review process will be discussed and the possible changes to the ITER baseline indicated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Negative Ion Based Heating and Diagnostic Neutral Beams for ITER

To meet the requirements of the four operating and one start-up scenarios foreseen in the International Tokamak Experimental Reactor (ITER) a flexible heating mix will be required, which has to include a reliable contribution from neutral beams. The current baseline of ITER foresees 2 Heating Neutral Beam (HNB) systems based on negative ion technology, each operating at 1 MeV 40 A D{sup -} ions, and each capable of delivering up to 16.7 MW of D deg. to the ITER plasma. A 3rd HNB injector is foreseen as an upgrade option. In addition a dedicated Diagnostic Neutral Beam (DNB) injecting 100 keV 60 A of negative hydrogen ions will be available for charge exchange resonant spectroscopy (CXRS). The significant R and D effort necessary to meet the design requirements will be provided in the Neutral Beam Test Facility (NBTF), which is to be constructed in Padua, Italy. This paper gives an overview of the current status of the neutral beam (NB) systems and the chosen configuration. The ongoing integration effort into the ITER plant is highlighted and open interface issues are identified. It is shown how installation and maintenance logistics has influenced the design. ITER operating scenarios are briefly discussed, including start-up and commissioning. For example it is now envisaged to have a low current hydrogen phase of ITER operations, essentially for commissioning of the many auxiliary systems used on ITER. The low current limits the achievable plasma density, and hence the NB energy due to shine through limitations. Therefore a possible reconfiguration of the auxiliary heating systems is now being discussed. Other NB related issues identified by the ongoing design review process are emphasized and possible impact on the implementations of the HNB and DNB systems is indicated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗