Pollution monitoring in Lake Champlain using ERTS-1 imagery
The author has identified the following significant results. Band 4 imagery of April 7 and 25 show contrasting pollution effects due to seasonal and discharge variations. The pollution plume emanating from the International Paper Co. mill just north of Fort Ticonderoga was first detected on October 10 ERTS-1 imagery and now has been documented during spring high lake level conditions. The plume was observed extending further to the north and east than under low water conditions of October 10. This northward extension reflects a stronger northward current flow expected in the turbid southern leg of Lake Champlain. The extensive plume of April 25 represents full plant operation while the April 5 scene shows some plume traces directly over the submerged diffuser, discharge pipe representing minimal discharge during weekend plant operation. The ERTS-1 documentation will be used in developing a model of plume behavior under varying environmental conditions and will hopefully serve to assist in a major resource decision pending at U.S. Supreme Court level.