Search NASA⌕ Search

Engineering topics

Herold, Jamie M.

Publications and source records attributed to Herold, Jamie M..

Operational and Performance Monitoring of East Tennessee Technology Park Ponds - 2024 Results

Performance and operational monitoring are regulatory requirements associated with a non–time-critical removal action for three surface water bodies at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee (Figure 1): the K-1007-P1 Pond, the K-901-A Pond, and the K-720 Slough. This progress report summarizes the monitoring activities and results from FY 2024. The goal of ecological enhancement of the K-1007-P1 and K-901-A Ponds is to reduce risk from polychlorinated biphenyl (PCB) contamination in fish to humans and wildlife. Lowering PCB concentrations in the water column and in the food that fish eat is expected to decrease PCB bioaccumulation in fish. Performance monitoring of the K-1007-P1 Pond focuses on annual PCB trends in water, clams, and fish. PCBs in fish also are sampled annually at the K-720 Slough.

54 ENVIRONMENTAL SCIENCES↗

Operational and Performance Monitoring of East Tennessee Technology Park Ponds—2023 Results

Performance and operational monitoring are regulatory requirements associated with a non–time-critical removal action for three surface water bodies at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee: the K-1007-P1 Pond, the K-901-A Pond, and the K-720 Slough. This progress report summarizes the monitoring activities and results from fiscal year (FY) 2023. The goal of ecological enhancement of the K-1007-P1 and K-901-A Ponds is to reduce risk from polychlorinated biphenyl (PCB) contamination in fish to humans and wildlife. Lowering PCB concentrations in the water column and in the food that fish eat is expected to decrease PCB bioaccumulation in fish. Performance monitoring of the K-1007-P1 Pond focuses on annual PCB trends in water, clams, and fish. PCBs in fish also are sampled annually at the K-720 Slough. Operational monitoring ensures that ecological enhancement measures—including water quality, plant community, fish community, and wildlife actions—have been implemented as intended. Monitoring provides the information necessary to determine whether modifications are needed to attain the design end state (i.e., a heavily vegetated, clearwater pond dominated by sunfish with significantly diminished or at least downwardly trending PCB levels in fish). In FY 2023, fish removal efforts and vegetation planting primarily focused on the K-901-A Pond. These actions were implemented to help push the systems toward the desired end state. Descriptions of the various monitoring activities and preliminary 2023 results are provided in the following sections. An update on fish and plant management actions in FY 2023 is also included in this report. A summary of the more detailed information in this report will be presented as required in the upcoming Remediation Effectiveness Report.

54 ENVIRONMENTAL SCIENCES↗

Advancing wildlife connectivity in land use planning: a case study with four-toed salamanders

Stable habitat connections that wildlife can safely traverse are essential to biodiversity conservation and healthy ecosystems. We developed high-resolution landscape connectivity models to predict resistance to movement by a threatened wetland-obligate amphibian, the four-toed salamander ( Hemidactylium scutatum ), and identified priority management areas on the 13,000-ha Department of Energy Oak Ridge Reservation (ORR) from 2019 to 2022. We developed a resistance surface based on aerial light detection and ranging data (LiDAR), >30 years of field-based mapping of forest, hydrologic, and geologic features, and contemporary population surveys, alongside derived predictors at <1-m resolution. We then modeled predicted movement corridors using a circuit theory-based modeling approach. We worked closely with land management and natural resources personnel to integrate ecological modeling with broader land use priorities, monetary costs, and feasibility. We identified important terrestrial and aquatic areas on ORR and simulated management scenarios to promote stable connections for four-toed salamanders. This approach allowed us to narrow down a list of 438 potential habitat manipulation sites to 10 sites where open-bottomed culverts and buffers could be implemented. This smaller-scale restoration approach produced a similar increase in landscape connectivity while costing <20% of a larger-scale approach based on barrier removal. We successfully identified feasible, cost-effective management strategies that integrated knowledge from a variety of sources. In conclusion, we offer a strategy that permitted integration of wildlife management goals into infrastructure upgrades wherein wildlife was not an initial consideration.

60 APPLIED LIFE SCIENCES↗