Search NASA⌕ Search

Engineering topics

Hertzog, David W.

Publications and source records attributed to Hertzog, David W..

Next Generation Muon g-2 Experiments

I report on the progress of two new muon anomalous magnetic moment experiments, which are in advanced design and construction phases. The goal of Fermilab E989 is to reduce the experimental uncertainty of $a_\mu$ from Brookhaven E821 by a factor of 4; that is, $\delta a_\mu \sim 16 \times 10^{-11}$, a relative uncertainty of 140~ppb. The method follows the same magic-momentum storage ring concept used at BNL, and pioneered previously at CERN, but muon beam preparation, storage ring internal hardware, field measuring equipment, and detector and electronics systems are all new or upgraded significantly. In contrast, J-PARC E34 will employ a novel approach based on injection of an ultra-cold, low-energy, muon beam injected into a small, but highly uniform magnet. Only a small magnetic focusing field is needed to maintain storage, which distinguishes it from CERN, BNL and Fermilab. E34 aims to roughly match the previous BNL precision in their Phase~1 installation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and Cost Update for Proposal P-989: The New (g-2) Experiment: A Proposal to Measure the Muon Anomalous Magnetic Moment to ±0.14ppm Precision

questions raised in the subsequent letter (attached) from Lab Director Pier Oddone to the Collaboration. Three main issues-as identified by the PAC-are included in Pier's letter: 1) The impact and technical implications with respect to other aspects of the Fermilab program; 2) The need to develop a mechanism to draw upon the technical expertise at BNL from the previous BNL g-2 experiment; 3) A validity of the costs and schedule estimate, which are significantly reduced from what PS considered. We address each of these in tum in the following report; however, we begin with a brief update on the physics situation and a synopsis of the experimental plan.

43 PARTICLE ACCELERATORS↗