Search NASA⌕ Search

Engineering topics

Hodell, Gita

Publications and source records attributed to Hodell, Gita.

Evaluation of Integrated Demand Management Looking into Strategic & Tactical Flow Management

The motivation behind Integrated Demand Management (IDM) research is to explore possible improvements to United States National Airspace System (NAS) performance that could be realized through procedural integration of strategic traffic flow management capabilities, such as the Collaborative Trajectory Options Program (CTOP), and tactical capabilities, such as Time Based Flow Management (TBFM). An initial IDM concept for clear weather operations was developed and evaluated for potential benefits, including efficiency, delay reduction, predictability and throughput, and to identify any major issues that might represent a showstopper for a fielded application. Newark Liberty International Airport (EWR) arrival operations provided a use case for concept development. EWR uses miles-in-trail (MIT) metering to regulate demand into TBFM during high volume operations, and short-haul flights are often penalized with excessive, last-minute ground delays when the overhead stream is saturated. IDM addresses this problem by replacing MIT conditioning with CTOP to better manage the demand delivery to the TBFM entry points. A quasi-real time high-fidelity simulation that would normally involve participants was conducted using heuristic-based procedures that mimicked operators behaviors instead. Five total conditions were compared: two baseline conditions with MIT delivery to TBFM entry points using two different TBFM settings; and three IDM conditions: one with airborne speed control using an Required Time of Arrival (RTA) capability, a second without RTA, and a third with no wind forecast errors. Results suggest that the IDM concept can deliver traffic more efficiently by shifting the delays from airborne to ground for both RTA and non-RTA conditions, while maintaining a target throughput rate. The results also suggest that with good predictability of airport capacity, excessive TBFM ground delay can be minimized by applying more strategic CTOP delay, increasing predictability for the airline operators. Overall, the results indicate that the implementation of an IDM concept under clear weather conditions can improve NAS system performance. Future IDM research aims to expand the concept to address demandcapacity imbalance d severe weather.

Time-Based Flow Management (TBFM)↗

Integrated Demand Management: Minimizing Unanticipated Excessive Departure Delay while Ensuring Fairness from a Traffic Management Initiative

This paper introduces NASA's Integrated Demand Management (IDM) concept and presents the results from an early proof-of-concept evaluation and an exploratory experiment. An initial development of the concept was focused on integrating two systems - i.e. the FAA's newly deployed Traffic Flow Management System (TFMS) tool called the Collaborative Trajectory Options Program (CTOP) and the Time-Based Flow Management (TBFM) system with Extended Metering (XM) capabilities to manage projected heavy traffic demand into a capacity-constrained airport. A human-in-the-loop (HITL) simulation experiment was conducted to demonstrate the feasibility of the initial development of the concept by adapting it to an arrival traffic problem at Newark Liberty International Airport (EWR) during clear weather conditions. In this study, the CTOP was utilized to strategically plan the arrival traffic demand by controlling take-off times of both short- and long-haul flights (long-hauls specify aircraft outside TBFM regions and short-hauls specify aircraft within TBFM regions) in a way that results in equitable delays among the groups. Such strategic planning allows less airborne delay to occur within TBFM by feeding manageable long-haul traffic demand while reserving sufficient slots in the overhead streams for the short-haul departures. The manageable traffic demand indicates the TBFM scheduler assigns no more airborne delay than its assigned airspace is capable of absorbing. TBFM then uses its time-based metering capabilities to deliver the desirable throughput by tactically rescheduling the TBFM entered long-haul flights and short-haul departures. Additional research was also performed to explore use of Required Time of Arrival (RTA) capabilities as a potential control mechanism for the airborne flights to improve arrival traffic delivery accuracy of scheduled long-haul traffic demand. The study results show that both short- and long-haul flights received similar ground delays. In addition, there was a noticeable reduction in the total amount of excessive unanticipated last-minute ground delays, i.e. delays that are frequently imposed on the short-haul flight in current day operations due to saturation in the overhead stream, commonly referred to as 'double penalty'. Furthermore, the concept achieved the target throughput while minimizing the expected cost associated with overall delays in arrival traffic. Assessment of the RTA capabilities showed that there was indeed improvement of the scheduled entry times into TBFM regions by using RTA capabilities. However, with respect to reduction in delays incurred within TBFM, there was no observable benefit of improving the precision of long-haul flights entry times.

Collaborative Trajectory Options Program (CTOP)↗