Search NASA⌕ Search

Engineering topics

Hofler, A.

Publications and source records attributed to Hofler, A..

Toward a long-lifetime polarized photoelectron gun for the Ce+BAF positron source

The addition of spin-polarized, continuous-wave (c.w.) positron beams to the 12 GeV Continuous Electron Beam Accelerator Facility (CEBAF) would provide a significant capability to the experimental nuclear physics program at Jefferson Lab. Based on bremsstrahlung and pair-production in a high-Z target, the positron source requires a 120 MeV spin-polarized c.w. electron beam of several milliamperes. While the beam dynamics of the high-current electron beam are tenable, sustaining this current for weeks of user operations requires an unprecedented charge lifetime from a high-polarization GaAs-based photocathode. A promising approach to exceed the kilocoulomb charge lifetime barrier is reducing the ion back-bombardment fluence at the photocathode. By increasing the laser size and managing the emittance growth with an adequate cathode/anode design, significantly enhanced charge lifetime may be achieved. Based upon a new simulation model that qualitatively explains the lifetime data previously measured at different spot sizes, we describe the practical implications on the parameter space available for a kilocoulomb-lifetime polarized photogun design.

Bruker, M.↗

Toward a long-lifetime polarized photoelectron gun for the Ce+BAF positron source

The addition of spin-polarized, continuous-wave (c.w.) positron beams to the 12 GeV Continuous Electron Beam Accelerator Facility (CEBAF) would provide a significant capability to the experimental nuclear physics program at Jefferson Lab. Based on bremsstrahlung and pair-production in a high-Z target, the positron source requires a 120 MeV spin-polarized c.w. electron beam of several milliamperes. While the beam dynamics of the high-current electron beam are tenable, sustaining this current for weeks of user operations requires an unprecedented charge lifetime from a high-polarization GaAs-based photocathode. A promising approach to exceed the kilocoulomb charge lifetime barrier is reducing the ion back-bombardment fluence at the photocathode. By increasing the laser size and managing the emittance growth with an adequate cathode/anode design, significantly enhanced charge lifetime may be achieved. Based upon a new simulation model that qualitatively explains the lifetime data previously measured at different spot sizes, we describe the practical implications on the parameter space available for a kilocoulomb-lifetime polarized photogun design.

Bruker, M.↗

Positron beams at Ce+BAF

Positron beams would provide a new and meaningful probe for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab). The JLab Positron Working Group, formed in 2018 and now with over 250 members from 75 institutions, continues to develop an experimental program with high duty-cycle positron beams including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). In this presentation we describe a start-to-end layout for positron beams at 12 GeV CEBAF utilizing the Low Energy Research Facility (LERF) at Jefferson Lab to build two new injectors. A GaAs dc high voltage photo-gun first generates >1 mA of polarized electrons which are then accelerated to 80-150 MeV and directed to a high-power spinning W target for polarized bremsstrahlung and positron pair creation. A second injector then collects, bunches and accelerates the positrons to 123 MeV. The positron beams are transported by a new beam line and injected into the CEBAF acceptance for acceleration to the end stations with energies up to 12 GeV. The layout is optimized to provide Users with positron spin polarization >60% and intensity greater than >100 nA, and with higher intensities when polarization is not required.

Benesch, J.↗

Polarized electron injector for positron production at CEBAF

As a part of the effort to expand the capabilities of CE-BAF 12 GeV (Continuous Electron Beam Accelerator Facility) at Jefferson Lab, the addition of a polarized positron source is considered. This capability would provide acceleration of high duty-cycle polarized posi-trons, with spin >60% polarization, through the same main CEBAF accelerator machine with appropriate mag-net field reversals and linac phasing to the four CEBAF experimental halls. To produce this positron beam, a high average current (3-10 mA) highly polarized electron beam with energy of 100 ? 150 MeV is required at the positron source target. The focus of this paper is the de-sign of that polarized electron beam injector. We will describe the production and delivery of a >3 mA highly polarized electron beam. We will discuss different aspects of the design, the photocathode gun, beam dynamics simulation results, spin manipulation, bunching and accelerating process and final electron beam parameters.

Kazimi, R.↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

The upcoming Jefferson Lab K-Long experiment at Hall D will require unique beam conditions with a much lower bunch repetition rate and atypically high bunch charge. To optimize the Continuous Electron Beam Accelerator Facility (CEBAF) injector for this experiment, we performed Multi-Objective Genetic Optimization (MGO) using General Particle Tracer (GPT) to determine the magnetic elements and RF settings necessary for the K-long bunch charge (0.64 pC) at 200 kV. We also investigated the transmission and beam characteristics of low to high charge per bunch electron beams through the injector for simultaneous operations of all four CEBAF Halls and characterized the transmission as a function of the photocathode laser spot size and pulse length. Our findings provide valuable insights into optimizing the CEBAF injector for the Jefferson Lab K-Long experiment, as well as for other experiments with similar beam conditions

Kazimi, R.↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

As a follow on to the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility, the front end of the DC photo-gun-based injector has gone through a phased upgrade. The first phase focused on the beamline between the gun and the RF chopper system, and the second phase addresses the beamline after the RF chopper system including replacing the capture section and quarter cryomodule with a new booster module containing a 2-cell and 7-cell cavity string. Throughout the design process, we maintained and developed three models, one for the existing injector and one for each of the upgrade phases. With these models, we evaluated proposed hardware upgrades, evaluated and determined optimized beamline element positions, developed buncher voltage requirements, and settings for optimal injector running. In this paper, we will describe the models and results from these various studies and provide a brief summary of Phase 1 commissioning.

Kazimi, R.↗