Search NASA⌕ Search

Engineering topics

Holmes, Stephen

Publications and source records attributed to Holmes, Stephen.

PIP-II Status and Strategy

Proton Improvement Plan-II (PIP-II) is the centerpiece of Fermilab's plan for upgrading the accelerator complex to establish the leading facility in the world for particle physics research based on intense proton beams. PIP-II has been developed to provide 1.2 MW of proton beam power at the start of operations of the Long Baseline Neutrino Facility (LBNF), while simultaneously providing a platform for eventual extension of LBNE beam power to >2MW and enabling future initiatives in rare processes research based on high duty factor/higher beam power operations. PIP-II is based on the construction of a new 800 MeV superconducting linac, augmented by improvements to the existing Booster, Recycler, and Main Injector complex. PIP-II is currently in the development stage with an R&D program underway targeting the front end and superconducting RF acceleration technologies. This paper will describe the status of the PIPII conceptual development, the associated technology R&D programs, and the strategy for project implementation.

43 PARTICLE ACCELERATORS↗

A STAGED MUON ACCELERATOR FACILITY FOR NEUTRINO AND COLLIDER PHYSICS

Muon-based facilities offer unique potential to provide capabilities at both the Intensity Frontier with Neutrino Factories and the Energy Frontier with Muon Colliders. They rely on a novel technology with challenging parameters, for which the feasibility is currently being evaluated by the Muon Accelerator Program (MAP). A realistic scenario for a complementary series of staged facilities with increasing complexity and significant physics potential at each stage has been developed. It takes advantage of and leverages the capabilities already planned for Fermilab, especially the strategy for long-term improvement of the accelerator complex being initiated with the Proton Improvement Plan (PIP-II) and the Long Baseline Neutrino Experiment (LBNE). Each stage is designed to provide an R&D platform to validate the technologies required for subsequent stages. The rationale and sequence of the staging process, and the critical issues to be addressed at each stage, are presented.

Delahaye, Jean-Pierre↗

Project X: A Flexible High Power Proton Facility

Project X is a high intensity proton facility that will support a world-leading Intensity Frontier research program over the next several decades at Fermilab. When compared to other facilities in the planning stages elsewhere in the world Project X is completely unique in its ability to deliver, simultaneously, up to 6 MW of site-wide beam power to multiple experiments, at multiple energies, and with flexible beam formats. Project X will support a wide range of experiments based on neutrinos, muons, kaons, nucleons, and nuclei. In addition, Project X will lay the foundation for the long-term development of a Neutrino Factory and/or Muon Collider. A complete concept for Project X has been developed and is documented in the Project X Reference Design Report.

43 PARTICLE ACCELERATORS↗

Remembering the Tevatron: The Machine(s)

For 25 years the Tevatron proton-antiproton collider was the highest energy collider in the world. This presentation will trace the origins of the Tevatron, the challenges that were overcome in creating high luminosity collisions of protons and antiprotons, the technological achievements that drove performance a factor of 400 beyond the initial performance goals, and the legacy of the Tevatron in paving the way for ever more advanced colliders.

43 PARTICLE ACCELERATORS↗

Overview of the Tevatron Collider Complex: Goals, Operations and Performance

For more than two decades the Tevatron proton-antiproton collider was the centerpiece of the world's high energy physics program. The collider was arguably one of the most complex research instruments ever to reach the operation stage and is widely recognized for numerous physics discoveries and for many technological breakthroughs. In this article we outline the historical background that led to the construction of the Tevatron Collider, the strategy applied to evolution of performance goals over the Tevatron's operational history, and briefly describe operations of each accelerator in the chain and achieved performance.

43 PARTICLE ACCELERATORS↗

Memorandum of Understanding for the 2008 Meson Test Beam Program: CALICE Test Beam

This is a Memorandum of Understanding (MoU) between the Fermi National Accelerator Laboratory and the experimenters of the CALICE Collaboration who have committed to participate in beam tests to be carried out during the 2008 MTest program. This memorandum is intended solely for the purpose of providing a work allocation for Fermi National Accelerator Laboratory and the participating universities and institutions. It reflects an arrangement that is currently satisfactory to the parties involved. It is recognized, however, that changing circumstances of the evolving research program may necessitate revisions. The parties agree to negotiate amendments to this memorandum to reflect such revisions.

43 PARTICLE ACCELERATORS↗

Memorandum of Understanding (MOU): Shielding and Radiation Effect Experiments (Pbar target station and NuMI absorber & MINOS)

This is a Memorandum of Understanding (MOU) between the Fermilab and experimenters who have committed to participate in "the Shielding and Radiation Effect Experiments" to be carried out for several years, starting in October 2007. This memorandum is intended solely for the purpose of providing a work allocation for Fermilab and the participating institutions and universities. It reflects an arrangement that is currently satisfactory to the parties involved. It is recognized that changing circumstances of the evolving research program may necessitate further revisions. The parties agree to negotiate amendments to this memorandum to reflect such revisions. In all the phases of the experimental work outlined in this MOU, the experimenters will abide by the Fermilab Environmental Safety and Health Manual (FESHM) as prescribed and guided by the laboratory's safety staff.

43 PARTICLE ACCELERATORS↗