OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) 12 GeV upgrade reached its design energy in December of 2015. Since then CEBAF has been deliver-ing 12 GeV beam to experimental Hall D and 11 GeV to experimental halls A and B in support of Nuclear physics. To meet this energy goal, ten new 100 MV cryomodules (80 cavities) and RF systems were installed in 2013. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher QL (~ 3×107) op-erations, the RF system uses 13 kW klystrons and digital LLRF to power and control each cavity. This paper re-ports on the C100 operation and optimization improve-ments of the RF system and cryomodules.

Hovater, James↗

LLRF Commissioning of the new CEBAF 100 MeV Cryomodule

Commissioning of the 100 MeV cryomodule (CEBAF acronym C100) is part of the CEBAF energy upgrade to 12 GeV at Jefferson Lab. LLRF commissioning includes field control, cavity interlocks, resonance controls (Stepper Motor and Piezo tuner) and operational software. All the above mentioned systems and software are calibrated and tested on the bench and in test platforms prior to installation. Once installed and connected to the cryomodule, the system supports cavity commissioning (Emax, Qo etc.). In addition the LLRF system is calibrated (gradient and RF power), optimized (system gains and set points) and functionality is tested for operability. This poster describes the detailed description of various stages of commissioning of first 100 MeV cryomodule.

Bachimanchi, Ramakrishna↗

Status of the CEBAF Energy Upgrade RF Control System

To support the CEBAF energy upgrade from 6 GeV to 12 GeV, the RF control system is being modernized to control the high gradient high QL superconducting cavities. 80 new LLRF systems are being built to support the upgrade. The new system incorporates a heterodyne transceiver along with I&Q sampling to measure and control magnitude and phase. A low-cost Altera FPGA is used to digitally implement the cavity control algorithms. One of the features of the system is a digital self excited loop to track the cavity over large Lorentz detuning (800 Hz) during turn on. The system has successfully completed preliminary development and is now moving into the production stage of the project. This paper discusses the design, modeling, testing and production of the new RF control system and associated peripheral systems (cavity interlocks, and resonance control).

Hovater, James↗

RF CONTROL OF HIGH QL SUPERCONDUCTING CAVITIES

In the last 20 years the requirements for RF Control have increased as the target use has broadened from electron/ion accelerators for Nuclear and Particle Physics to light sources such as Free Electron Lasers. The increasing requirement of cavity field control to meet the spectral and jitter performance specifications for light sources has led system designers to a more rigorous approach in designing the RF controls. Design attention must be applied not only to the hardware and control algorithms but also to the overall accelerating system to meet performance and cost requirements. As an example, cavity QL in Energy Recovery Linacs (ERL) must be optimized such that the RF controls can accommodate the lowest possible RF power given the background cavity microphonics. This paper presents the status and future directions of high QL superconducting RF control systems.