Near integer tune for polarization preservation in the AGS

The high energy (T = 250 GeV) polarized proton beam experiments performed in RHIC, require high polarization of the beam. In order to preserve the polarization of the proton beam, during the acceleration in the AGS, which is the pre-injector to RHIC, we have installed in AGS two partial helical magnets which minimize the loss of the beam polarization caused by the various intrinsic spin resonances occurring during the proton acceleration. The minimization of the polarization loss during the acceleration cycle, requires that the vertical tune of the AGS is between the values of 8.97 and 8.985 during the acceleration. With the AGS constrained to run at near integer tune {approx}8.980, the perturbations to the beam caused by the partial helical magnets are large and also result in large beta and dispersion waves. To mitigate the adverse effect of the partial helices on the optics of the AGS, we have installed in specified straight sections of the AGS compensation quads and we have also generated a beam bump at the location of the cold partial helix. In this paper we present the beam optics of the AGS which ameliorates the adverse effect of the two partial helices on the beam optics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The AGS synchrotron with four helical magnets

The idea of using two partial helical magnets was applied successfully to the AGS synchrotron to preserve the proton beam polarization. In this paper we explore in details the idea of using four helical magnets placed symmetrically in the AGS ring. The placement of four helical magnets in the AGS ring provides many advantages over the present setup of the AGS which uses two partial helical magnets. First, the symmetric placement of the four helical magnets allows for a better control of the AGS optics with reduced values of the beta functions especially near beam injection, second, the vertical spin direction during beam injection and extraction is closer to vertical, and third, it provides for a larger 'spin tune gap', which allows the vertical and horizontal tunes to be placed, and prevent the horizontal and vertical intrinsic spin resonances of the AGS to occur during the acceleration cycle. Although the same spin gap can be obtained with a single or two partial helices, the required high field strength of a single helix makes its use impractical, and that of the double helix rather difficult. In this paper we will provide results on the spin tune and on the optics of the AGS with four partial helical magnets, and compare these results with the present setup of the AGS that uses two partial helical magnets.

43 PARTICLE ACCELERATORS↗

Modelling of the AGS using Zgoubi - Status

This paper summarizes the progress achieved so far, and discusses various outcomes, regarding the development of a model of the Alternating Gradient Synchrotron at the RHIC collider. The model, based on stepwise ray-tracing methods, includes beam and polarization dynamics. This is an on-going work, and a follow-on of code developments and particle and spin dynamics simulations that have been subject to earlier publications at IPAC and PAC [1, 2, 3]. A companion paper [4] gives additional informations, regarding the use of the measured magnetic field maps of the AGS main magnets.

43 PARTICLE ACCELERATORS↗

Atomistic study of grain boundary sink strength under prolonged electron irradiation

Grain boundaries (GBs) are sinks and sources of point defects, which are produced in large number under radiation damage. As grain size decreases, many of the point defects sink into GBs. It is unknown whether GBs will saturate as sinks of point defects, particularly when grain size is at the nanoscale. Using a combination of molecular dynamics (MD) simulations and rate theory for BCC Mo, the authors show that large-angle GBs do not saturate as sinks of point defects. The MD simulations serve to provide direct measurement of defect evolution, and the rate theory serves to test whether grain boundary sink strength is a constant and to extend the MD results to realistic defect production rates.

36 MATERIALS SCIENCE↗

RAPID MID-INFRARED VARIABILITY IN PROTOSTELLAR DISKS

Spectral energy distribution (SED) in protostellar disks is determined by the disks' internal dissipation and reprocessing of irradiation from their host stars. Around T Tauri stars, most mid-infrared (MIR) radiation (in a wavelength range from a few to a few tens of {mu}m) emerges from regions around a fraction to a few AU. This region is interesting because it contains both the habitable zone and the snow line. Recent observations reveal SED variations in the MIR wavelength range. These variations are puzzling because they occur on a timescale (a few days) which is much shorter than the dynamical (months to years) timescale from 1 AU to a few AU. They are probably caused by shadows cast by inner onto outer disk regions. Interaction between disks and their misaligned magnetized host stars can lead to warped structure and periodic SED modulations. Rapid aperiodic SED variations may also be induced by observed X-ray flares from T Tauri stars. These flares can significantly modulate the ionization fraction of the gas and the net charge carried by the grains near the surface of the inner disk. The newly charged grains may be accelerated by the stellar or disk magnetic field and adjust their distances from the midplane. Shadows cast by these grains attenuate the flux of stellar photons irradiated onto regions at several AU from the central stars. We use this model to account for the observed rapid aperiodic SED variabilities. We suggest that regular monitoring of SED variations will not only provide valuable information on the distribution of the disk aspect ratio near the habitable zone but also provide a probe of the interaction between the inner regions of the disk with the magnetosphere of their host stars.

79 ASTRONOMY AND ASTROPHYSICS↗

Crystal Structure of a Phosphorylation-coupled Saccharide Transporter

Saccharides have a central role in the nutrition of all living organisms. Whereas several saccharide uptake systems are shared between the different phylogenetic kingdoms, the phosphoenolpyruvate-dependent phosphotransferase system exists almost exclusively in bacteria. This multi-component system includes an integral membrane protein EIIC that transports saccharides and assists in their phosphorylation. Here we present the crystal structure of an EIIC from Bacillus cereus that transports diacetylchitobiose. The EIIC is a homodimer, with an expansive interface formed between the amino-terminal halves of the two protomers. The carboxy-terminal half of each protomer has a large binding pocket that contains a diacetylchitobiose, which is occluded from both sides of the membrane with its site of phosphorylation near the conserved His250 and Glu334 residues. The structure shows the architecture of this important class of transporters, identifies the determinants of substrate binding and phosphorylation, and provides a framework for understanding the mechanism of sugar translocation.

59 BASIC BIOLOGICAL SCIENCES↗

Experimental Study of Synchro-Betatron Coupling Induced By Dipole Modulation

Synchro-betatron coupling in a proton storage ring with electron cooling was studied experimentally by modulating a transverse dipole field close to the synchrotron frequency. The combination of the electron cooling and transverse field modulation on the synchrotron oscillation is equivalent to a dissipative parametric resonant system. The proton bunch was observed to split longitudinally into two pieces, or beamlets, converging toward attractors of the dissipative system. These phenomena might be important in understanding the effect of ground vibration on the Superconducting Super Collider beam, and the effect of power supply ripple on the Relativistic Heavy-Ion Collider beam.

43 PARTICLE ACCELERATORS↗

RHIC performance for FY2011 Au+Au heavy ion run

Following the Fiscal Year (FY) 2010 (Run-10) Relativistic Heavy Ion Collider (RHIC) Au+Au run, RHIC experiment upgrades sought to improve detector capabilities. In turn, accelerator improvements were made to improve the luminosity available to the experiments for this run (Run-11). These improvements included: a redesign of the stochastic cooling systems for improved reliability; a relocation of 'common' RF cavities to alleviate intensity limits due to beam loading; and an improved usage of feedback systems to control orbit, tune and coupling during energy ramps as well as while colliding at top energy. We present an overview of changes to the Collider and review the performance of the collider with respect to instantaneous and integrated luminosity goals. At the conclusion of the FY 2011 polarized proton run, preparations for heavy ion run proceeded on April 18, with Au+Au collisions continuing through June 28. Our standard operations at 100 GeV/nucleon beam energy was bracketed by two shorter periods of collisions at lower energies (9.8 and 13.5 GeV/nucleon), continuing a previously established program of low and medium energy runs. Table 1 summarizes our history of heavy ion operations at RHIC.

43 PARTICLE ACCELERATORS↗

Evaluating the dynamic aperture evaluation for the new RHIC 250 GeV polarized proton lattice

To increase luminosity in the Relativistic Heavy Ion Collider's (RHIC's) polarized proton 250 GeV operations, we are considering reducing {beta}* to 0.65 m at the interaction points (IPs), and increasing bunch intensity. The new working point near the 2/3 integer will used on the ramp to preserve polarization. In addition, we plan to adjust the betatron-phase advances between IP6 and IP8 to (k+1/2)*{pi} so to lower the dynamic beta-beat from the beam-beam interaction. The effects of all these changes will impact the dynamic aperture, and hence, it must be evaluated carefully. In this article, we present the results of tracking the dynamic aperture with the proposed lattices.

43 PARTICLE ACCELERATORS↗

AGS tune jump power supply design and test

A horizontal tune jump system has been installed to overcome the horizontal intrinsic spin resonances, which requires jumping the horizontal tune 0.04 units 82 times, 41 up and 41 down. Two quadruple magnets have been installed in AGS ring to perform this. The pulsed magnet current ranges from about 140A near injection to about 1400A later. The current pulse rise and fall time are around 100uS and flat tops time is around 4mS. These quadruples have separated supplies. This tune jump pulse power supply employees all semiconductor parts as well as the main switches. During dummy load and magnet testing, the test results showed that the power supply could meet the specification. This article will describe some details of power supply simulation, design and testing. Some test waveforms and pictures are presented in this paper.

43 PARTICLE ACCELERATORS↗

Medium energy heavy ion operations at RHIC

As part of the search for a phase transition or critical point on the QCD phase diagram, an energy scan including 5 different energy settings was performed during the 2010 RHIC heavy ion run. While the top beam energy for heavy ions is at 100 GeV/n and the lowest achieved energy setpoint was significantly below RHICs injection energy of approximately 10 GeV/n, we also provided beams for data taking in a medium energy range above injection energy and below top beam energy. This paper reviews RHIC experience and challenges for RHIC medium energy operations that produced full experimental data sets at beam energies of 31.2 GeV/n and 19.5 GeV/n. The medium energy AuAu run covered two beam energies, both above the RHIC injection energy of 9.8 GeV but well below the standard store energy of 100 GeV (see table 1). The low energy and full energy runs with heavy ions in FY10 are summarized in [1] and [2]. Stochastic Cooling ([3]) was only used for 100 GeV beams and not used in the medium energy run. The efficiency of the transition from 100 GeV operation to 31.2 GeV and then to 19.5 GeV was remarkable. Setup took 32 h and 19 h respectively for the two energy settings. The time in store, defined to be the percentage of time RHIC provides beams in physics conditions versus calendar time, was approximately 52% for the entire FY10 heavy ion run. In both medium energy runs it was well above this average, 68% for 31.5 GeV and 82% for 19.5 GeV. For both energies RHIC was filled with 111 bunches with 1.2 10{sup 9} and 1.3 10{sup 9} ions per bunch respectively.

43 PARTICLE ACCELERATORS↗

RHIC Polarized proton operation

The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above injection, the polarized hydrogen jet target runs for every fill with both beams. Based on the known analyzing power, there is very little polarization loss between injection and 100 GeV. An alternative way is to measure the asymmetry at 100 GeV followed by ramping up to 250 GeV and back down to 100 GeV and then to measure the asymmetry again at 100 GeV. If the asymmetry after the down ramp is similar to the measurement before the up ramp, polarization was also preserved during the ramp to 250 GeV. The analyzing power at storage energy can then be extracted from the asymmetries measured at 100 GeV and 250 GeV. The tune and orbit feedbacks are essential for the down ramp to be possible. The polarized proton operation is still going on. We will push bunch intensity higher until reaching the beam-beam limit. The even higher intensity will have to wait for the electron lenses to compensate the beam-beam effect. To understand the details of spin dynamics in RHIC with two snakes, spin simulation with the real magnet fields have been developed recently. The study will provide guidance for possible polarization loss schemes. Further polarization gain will requires a polarized source upgrade; more careful setup jump quads in the AGS to get full benefit; and control emittance in the whole accelerator chain.

08 HYDROGEN↗

Studies and proposed changes to the RHIC p-Carbon polarimeters for the upcoming RUN-11

The RHIC polarized proton complex utilizes polarimeters in each of the Blue and Yellow beams that measure the beam polarization through the p-Carbon elastic scattering process in the Coulomb Nuclear Interference kinematic region. This along with a Polarized Hydrogen Jet Target that utilizes the proton-proton elastic scattering process to first measure the analyzing power of the reaction and using the reverse process to measure the beam polarization. The latter is used to calibrate the p-Carbon polarimeters at the desired beam energy. In Run 9 RHIC ran with beams at center-of-mass energies of 200 and 500 GeV respectively. The higher beam intensities as well as the fact that the 250 GeV beam size is much smaller than that at 100 GeV resulted in significantly higher rates seen by the polarimeters and led to observed instability. In this paper, we will discuss the problems encountered and the tests that were carried out using the AGS as a proxy in an attempt to solve the problems and the path forward we took towards the upcoming polarized proton Run11.

08 HYDROGEN↗

Measurements of the energy dependence of the analyzing power in pp elastic scattering in the CNI region

We present new measurements of the analyzing power A{sub N} in proton-proton elastic scattering in the Coulomb-Nuclear Interference region at {radical}s = 7.7 and 21.7 GeV obtained with the polarized atomic hydrogen jet target at RHIC. These measurements complement our earlier results at {radical}s = 6.8 and 13.7 GeV confirming the presence of a hadronic helicity flip amplitude contribution in proton-proton elastic scattering at lower energies ({radical}s <8 GeV) while higher energy data ({radical}s >13 GeV) are consistent with no hadronic helicity flip contribution.

08 HYDROGEN↗

Run-09 pC polarimeter analysis

Analysis of PC polarimeter data at {radical}s = 200 and 500 GeV from Run9 is presented. Final polarization results, fill-by-fill, for blue and yellow beams, as to be used by RHIC experiments (in collisions) are released and collected in http://www4.rcf.bnl.gov/cnipol/pubdocs/Run09Offline/. Global relative systematic uncertainties {delta}P/P (to be considered as correlated from fill to fill) are 4.7% for 100 GeV beams, and 8.3% (12.1%) for blue (yellow) 250 GeV beams. For a product of two beam polarizations P{sub B} {center_dot} P{sub Y} (used in double spin asymmetry measurements) the relative uncertainty {delta}(P{sub B} {center_dot} P{sub Y})/(P{sub B} {center_dot} P{sub Y}) 8.8% for 100 GeV beams and 18.5% for 250 GeV beams. For the average between two beam polarization (P{sub B} + P{sub Y})/2 (used in single spin asymmetry measurements, when data from two polarized beams are combined) the relative uncertainty is 4.4% for 100 GeV beams and 9.2% for 250 GeV beams. Larger uncertainties for 250 GeV beams relate to significant rate related systematic effects experienced in the first part of Run9 (due to thicker targets used and smaller trans. beam size at higher beam energy).

43 PARTICLE ACCELERATORS↗

RHIC PERFORMANCE DURING THE FY10 200 GeV Au+Au HEAVY ION RUN

Since the last successful RHIC Au+Au run in 2007 (Run-7), the RHIC experiments have made numerous detector improvements and upgrades. In order to benefit from the enhanced detector capabilities and to increase the yield of rare events in the acquired heavy ion data a significant increase in luminosity is essential. In Run-7 RHIC achieved an average store luminosity of <L> = 12 x 10{sup 26} cm{sup -2} s{sup -1} by operating with 103 bunches (out of 111 possible), and by squeezing to {beta}* = 0.85 m. This year, Run-10, we achieved <L> = 20 x 10{sup 26} cm{sup -2} s{sup -1}, which put us an order of magnitude above the RHIC design luminosity. To reach these luminosity levels we decreased {beta}* to 0.75 m, operated with 111 bunches per ring, and reduced longitudinal and transverse emittances by means of bunched-beam stochastic cooling. In addition we introduced a lattice to suppress intra-beam scattering (IBS) in both RHIC rings, upgraded the RF control system, and separated transition crossing times in the two rings. We present an overview of the changes and the results of Run-10 performance.

43 PARTICLE ACCELERATORS↗

Spin dynamics simulations at AGS

To preserve proton polarization through acceleration, it is important to have a correct model of the process. It has been known that with the insertion of the two helical partial Siberian snakes in the Alternating Gradient Synchrotron (AGS), the MAD model of AGS can not deal with a field map with offset orbit. The stepwise ray-tracing code Zgoubi provides a tool to represent the real electromagnetic fields in the modeling of the optics and spin dynamics for the AGS. Numerical experiments of resonance crossing, including spin dynamics in presence of the snakes and Q-jump, have been performed in AGS lattice models, using Zgoubi. This contribution reports on various results so obtained.