Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

The Strategic Value of Human Factors Engineering in Control Room Modernization

Control room modernization is one of the most challenging and complex upgrade projects that a nuclear power plant can undertake. It can have almost as big an impact on operations as, for example, turbine replacement. The challenges of migrating an analog control system to a distributed control system are already well known and a number of nuclear utilities have embarked upon various levels of effort to upgrade some of the systems in the control room. When planning for control room upgrades, plants have to deal with a multitude of engineering, operational, and regulatory impacts. This will inevitably include several human factors considerations, such as workstation ergonomics, viewing angles, lighting, seating, new interaction modalities, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the United States Department of Energy researchers located at Idaho National Laboratory (INL) have developed research-based human factors design and evaluation methods to be used in the development of end-state concepts for modernized control rooms and to manage the various phases of the upgrade life cycle. The methodology includes interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes and operator-system interaction, and development of human-system prototypes to evaluate various aspects of proposed modifications. This methodology has been applied at a number of U.S. nuclear power plants where modernization projects are underway, including Exelon’s Braidwood and Byron plants, and Arizona Public Service's Palo Verde plant. It was demonstrated that including this methodology in the plant’s engineering process helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and provide substantial improvement in operator performance.

99 GENERAL AND MISCELLANEOUS↗

Ergonomic Safety and Health Activities to Support Commercial Nuclear Power Plant Control Room Modernization in the United States

Affordable, abundant, and reliable electricity generation is essential to fueling a nation’s robust and globally competitive economy. In the United States (U.S.), commercial nuclear power plants (NPPs) account for approximately 19% of reliable and cost-competitive baseload electricity generation. Other technologies that reduce reliance on fossil fuels and provide baseload electricity cost-competitively at a national scale are still under development. Thus, without suitable replacements for nuclear power, the generating capacity of nuclear energy in the U.S. must be continued through the safe and efficient operation of commercial NPPs. The U.S. De-partment of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) research and development (R&D) program provides the technical bases for the long-term, safe, and economical operation of NPPs. One area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D, human factors engineering (HFE), and ergonomics to enable the modernization of the instrumentation and control (I&C) technologies in NPP main control rooms (MCRs). DOE researchers, including ergonomics specialists at Idaho National Laboratory (INL) have collaborated with nu-merous commercial NPP utilities over the last few years on control room modernization. This paper summarizes recent ergonomics safety and health R&D and HFE performed in collaboration with a U.S. commercial utility to modernize their NPP MCRs.

99 GENERAL AND MISCELLANEOUS↗

Control Room Modernization End-State Design Philosophy

The Control Room Modernization (CRM) research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development program sponsored by Department of Energy (DOE) and performed in close collaboration with industry research and development programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. This report describes the background and technical basis for an end-state vision design philosophy for and advanced hybrid control room.

99 GENERAL AND MISCELLANEOUS↗

Final Report for the Advanced Outage Control Center Dashboard with Predictive Tools

The “Advanced Outage Control Center” (AOCC) pilot project was part of the Light Water Reactor Sustainability (LWRS) program and was a multi-year effort targeted at NPP outage improvement. The primary purpose of this pilot project was to improve management of NPP outages through the development of AOCC features and facilities designed specifically to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. Later stages of the project focused more on tools that utilize technology to improve the outage manager’s understanding of the true outage status. The primary tool that resulted from this research was an innovative outage information dashboard with built-in data analysis and predictive capabilities. In its present form, the dashboard specifically takes advantage of visualization techniques that allow users to view and understand the status of the outage at a glance, without the need to drill down to find detail information. The dashboard also incorporates historical performance data to help evaluate current performance. The key innovation in this dashboard concept is not only its ability to avoid the complexity of raw data presentation, but also to predict the completion of the current outage using data analysis of the current schedule and historical performance of the plant. Through the LWRS program, a relationship between Idaho National Laboratory and Arizona Public Service (APS) was established to investigate the application of specialized techniques to analyze and visualize complex outage information. APS has supported efforts to implement advanced methods to improve the management of outages at the three units of the Palo Verde Nuclear Generating Station (PVNGS). The project has produced the basic principles and methodology for the development of sophisticated outage information analysis and presentation tools.

99 GENERAL AND MISCELLANEOUS↗

Technologies for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. A new area of LWRS research, Outage Risk Management Improvement (ORMI) seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions.

99 GENERAL AND MISCELLANEOUS↗

Regulatory Aspects of the Human Factors Engineering Process in Control Room Modernization

This report describes the basic aspects of control room modernization projects in the U.S. nuclear industry and the need for supplementary guidance on the integration of human factors considerations into the licensing and regulatory aspects of digital upgrades. The report pays specific attention to the integration of principles described in NUREG-0711 (Human Factors Engineering Program Review Model) and how supplementary guidance can help to raise general awareness in the industry regarding the complexities of control room modernization projects created by many interdependent regulations, standards and guidelines. The report also describes how human factors engineering principles and methods provided by various resources and international standards can help in navigating through the process of licensing digital upgrades. In particular, the integration of human factors engineering guidance and requirements into the process of licensing digital upgrades can help reduce uncertainty related to development of technical bases for digital upgrades that will avoid the introduction of new failure modes.

99 GENERAL AND MISCELLANEOUS↗

Human Factors Engineering Aspects of Modifications in Control Room Modernization

This report describes the basic aspects of control room modernization projects in the U.S. nuclear industry and the need for supplementary guidance on the integration of human factors considerations into the licensing and regulatory aspects of digital upgrades. The report pays specific attention to the integration of principles described in NUREG-0711 (Human Factors Engineering Program Review Model) and how supplementary guidance can help to raise general awareness in the industry regarding the complexities of control room modernization projects created by many interdependent regulations, standards and guidelines. The report also describes how human factors engineering principles and methods provided by various resources and international standards can help in navigating through the process of licensing digital upgrades. In particular, the integration of human factors engineering guidance and requirements into the process of licensing digital upgrades can help reduce uncertainty related to development of technical bases for digital upgrades that will avoid the introduction of new failure modes.

97 MATHEMATICS AND COMPUTING↗

Function allocation for humans and automation in the context of team dynamics

Within Human Factors Engineering, a decision-making process called function allocation (FA) is used during the design life cycle of complex systems to distribute the system functions, often identified through a functional requirements analysis, to all human and automated machine agents (or teammates) involved in controlling the system. Most FA methods make allocation decisions primarily by comparing the capabilities of humans and automation, but then also by considering secondary factors such as cost, regulations, and the health and safety of workers. The primary analysis of the strengths and weaknesses of humans and machines, however, is almost always considered in terms of individual human or machine capabilities. Yet, FA is fundamentally about teamwork in that the goal of the FA decision-making process is to determine what are the optimal allocations of functions among agents. Given this framing of FA, and the increasing use of and sophistication of automation, there are two related social psychological issues that current FA methods need to address more thoroughly. First, many principles for effective human teamwork are not considered as central decision points or in the iterative hypothesis and testing phase in most FA methods, when it is clear that social factors have numerous positive and negative effects on individual and team capabilities. Second, social psychological factors affecting team performance and can be difficult to translate to automated agents, and most FA methods currently do not account for this effect. The implications for these issues are discussed.

Automation↗

Work Domain Analysis Methodology for Development of Operational Concepts for Advanced Reactors

This report describes a methodology to conduct a Work Domain Analysis in preparation for the development of operational concepts for new plants. This method has been adapted from the classical method described in the literature in order to better deal with the uncertainty and incomplete information typical of first-of-a-kind designs. The report outlines the strategy for undertaking a Work Domain Analysis of a new nuclear power plant and the methods to be used in the development of the various phases of the analysis. Basic principles are described to the extent necessary to explain why and how the classical method was adapted to make it suitable as a tool for the preparation of operational concepts for a new nuclear power plant. Practical examples are provided of the systematic application of the method and the various presentation formats in the operational analysis of advanced reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Integrated Tool for Functional Requirements Analysis, Function Allocation and Task Analysis

The software application is called "HFE-Trace". This is an integrated method and tool for the management of Human Factors Engineering analyses and related data. Its primary purpose is to support the coherent and consistent application of the nuclear industry's best practices for human factors engineering work. The software is a custom Microsoft® Access® application. The application is used (in conjunction with other tools such as spreadsheets, checklists and normal documents where necessary) to collect data on the design of a new nuclear power plant from subject matter experts and other sources. This information is then used to identify potential system and functional breakdowns of the intended power plant design. This information is expanded by developing extensive descriptions of all functions, as well as system performance parameters, operating limits and constraints, and operational conditions. Once these have been verified, the human factors elements are added to each function, including intended operator role, function allocation considerations, prohibited actions, primary task categories, and primary work station. In addition, the application includes a computational method to assess a number of factors such as system and process complexity, workload, environmental conditions, procedures, regulations, etc.) that may shape operator performance. This is a unique methodology based upon principles described in NUREG/CR-3331 ("A methodology for allocating nuclear power plant control functions to human or automatic control") and it results in a semi-quantified allocation of functions to three or more levels of automation for a conceptual automation system. The aggregate of all this information is then linked to the Task Analysis section of the application where the existing information on all operator functions is transformed into task information and ultimately into design requirements for Human-System Interfaces and Control Rooms. This final step includes assessment of methods to prevent potential operator errors.

Hugo, Jacques↗