Search NASA⌕ Search

Engineering topics

Huque, Naeem

Publications and source records attributed to Huque, Naeem.

RFD pre-series cavity testing

This talk presents the results and status of the testing of the RFD bare cavities for the High Luminosity Upgrade of the LHC and the preparations for testing and preparing dressed cavities to be cryostated at TRIUMF and installed in the LHC.

Castilla Loeza, Alejandro↗

DEVELOPMENT OF A PROTOTYPE 197 MHz CRAB CAVITY FOR THE ELECTRON-ION COLLIDER AT JLAB

Thomas Jefferson National Accelerator Facility (JLab) is currently developing a prototype 197MHz Radio-Frequency Dipole (RFD) crab cavity as part of the Electron-Ion Collider (EIC) to be built at Brookhaven National Laboratory (BNL). Cryomodules containing these cavities will be part of the Hadron Storage Ring (HSR) of the EIC. The prototype cavity is constructed primarily of formed niobium sheets of thickness 4.17mm, with machined niobium parts used as interfaces where tight tolerancing is required. The cavity?s large size and complex features present sever-al challenges in fabrication, tuning, and RF testing. Structural and forming analyses have been carried out to optimize the design and fabrication processes. An overview of the design phase and the current state of fabrication are presented in this paper.

Huque, Naeem↗

Cryogenic RF tests of US LARP DQW SPS-series cavities

Crab cavities are one of the several components included in the luminosity upgrade of the Large Hadron Collider (HL-LHC). For nominal operation, the cavities have to provide a nominal deflecting kick of 3.4 MV per cavity in Continuous Wave operation at 2 K. The requirement for an unjacketed cavity – bare cavity equipped with Higher-Order Mode (HOM) filters and field antenna – is to reach at least a deflecting voltage of 4.1 MV (20% margin) with the heat load to the 2 K bath below 10 W. Cryogenic RF tests confirmed the required performances in bare cavities, with several cavities exceeding the required voltage by more than 50%. However, the first tests of a Double-Quarter Wave (DQW) cavity with one out of three HOM filters did not reach the required voltage. The present paper describes the studies and tests conducted to understand the limiting factor in the operation of a DQW cavity with HOM filters in the most up-to-date prototypes produced in the US and based on the DQW SPS-series design. The recipe to meet the performance specification for a bare DQW cavity with HOM filters and exceed the voltage requirement by more than 35% is discussed.

43 PARTICLE ACCELERATORS↗

Improvements to LCLS-II Cryomodule Transportation

The Linear Coherent Light Source (LCLS-II) is currently being constructed at the SLAC National Laboratory. A total of 35 cryomodules will be fabricated at Jefferson Lab (JLab) in Virginia and Fermi National Laboratory (FNAL) in Illinois and transported via road to SLAC. A shipping frame with an inner bed isolated by springs was designed to protect the CMs from shocks and vibrations during shipments. Successful road testing of the JLab prototype paved the way for production CM shipments. The initial production shipments lead to several catastrophic failures in beamline vacuum in the cryomodules. The failures were determined to be due to fatigue in Fundamental Power Coupler (FPC) bellows due to excessive motion during shipment. A series of instrumented CM shipping tests and component tests were undertaken to develop a solution. A modified spring layout was tested and implemented, which reduced shocks on the CMs. FPC coupler bellows restraints were tested on a shaker table and on a CM during shipping; they were able to reduce bellows motion by a factor of three. The updated shipping system is currently in use and has successfully delivered six cryomodules to SLAC from JLab and FNAL.

43 PARTICLE ACCELERATORS↗

UPGRADES TO CRYOGENIC CAPABILITIES FOR CRYOMODULE TESTING AT JLAB

The cryogenic facilities for cryomodule testing at Jefferson Lab (JLab) have been modified and to enable testing of Linear Coherent Light Source-II (LCLS-II) cryomodules. Temporary changes in u-tube connec-tions at the Cryogenic Test Facility (CTF) has enabled rates of cavity cooling that are a factor of 10 higher than previously achieved. Cryogenic connections at JLab?s Low Energy Recirculator Facility (LERF) have been repurposed to enable two LCLS-II cryomodules to be tested in series. This testing shares the helium space with the Central Helium Liquefier (CHL) that is also used by the Continuous Electron Beam Accelera-tor Facility (CEBAF). Cryomodule testing can occur while beam operation is ongoing at CEBAF. Improve-ments to these facilities have allowed the testing of the JLab?s highest ever performing cryomodules.

Huque, Naeem↗

Room Temperature Measurements of Higher Order Modes for the SPS Prototype RF-Dipole Crabbing Cavity

LHC High Luminosity Upgrade will be developing two local crabbing systems to increase the luminosity of the colliding bunches at the ATLAS and CMS experiments. One of the crabbing systems uses the rf-dipole cavity design that will be crabbing the beam in the horizontal plane. The fully integrated crabbing cavity has two higher order mode couplers in damping those excited modes. Currently two sets of HOM couplers have been fabricated at Jefferson Lab for prototyping and testing with the LARP crabbing cavities. This paper presents the measurements of the higher order modes with the prototype HOM couplers carried out at room temperature.

de Silva, SUbashini U.↗

LCLS-II CRYOMODULE TRANSPORT SYSTEM TESTING

The Cryomodules (CM) for the Linear Coherent Light Source II (LCLS-II) will be shipped to SLAC (Menlo Park, California) from JLab (Newport News, Virginia) and FNAL (Batavia, Illinois). A transportation system has been designed and built to safely transport the CMs over the road. It uses an array of helical isolator springs to attenuate shocks on the CM to below 1.5g in all directions. The system rides on trailers equipped with Air-Ride suspension, which attenuates vibration loads. The prototype LCLS-II CM (pCM) was driven 750 miles to test the transport system; shock loggers recorded the shock attenuation on the pCM and vacuum gauges were used to detect any compromises in beamline vacuum. Alignment measurements were taken before and after the trip to check whether cavity positions had shifted beyond the ± 0.2mm spec. Passband frequencies and cavity gradients were measured at 2K at the Cryomodule Test Facility (CMTF) at JLab to identify any degradation of CM performance after transportation. The transport system was found to have safely carried the CM and is cleared to begin shipments from JLab and FNAL to SLAC.

Huque, Naeem↗

RESULTS OF ACCELERATED LIFE TESTING OF LCLS-II CAVITY TUNER MOTOR

An Accelerated Life Test (ALT) of the Phytron stepper motor used in the LCLS-II cavity tuner has been conducted at JLab. Since the motor will reside inside the cryomodule, any failure would lead to a very costly and arduous repair. As such, the motor was tested for the equivalent of 30 lifetimes before being approved for use in the production cryomodules. The 9-cell LCLS-II cavity is simulated by disc springs with an equivalent spring constant. Plots of the motor position vs. tuner position ' measured via an installed linear variable differential transformer (LVDT) ' are used to measure motor motion. The titanium spindle was inspected for loss of lubrication. The motor passed the ALT, and is set to be installed in the LCLS-II cryomodules.

Huque, Naeem↗

MAGNETIC HYGIENE CONTROL ON LCLS-II CRYOMODULES FABRICATED AT JLAB

Jefferson Lab (JLab) is in collaboration with Fermi Na-tional Accelerator Laboratory (Fermilab) to build 18 cryomodules to install at the SLAC National Accelerator Laboratory?s tunnel as part of the Linac Coherent Light Source upgrade project (LCLS-II). Each LCLS-II cry-omodule hosts 8 superconducting niobium cavities that adopt the nitrogen doping technique, which aims to en-hance the cavity quality factor Qo to reduce the consumption of liquid helium used to cool down the cavities. It is known that the Qo of niobium cavities is affected by cavity surface magnetic field. Traditionally, magnetic shields made of high magnetic permeability mu-metals are employed as a passive shielding of the ambient magnetic fluxes. During the LCLS-II cryomodule development, magnetic hygiene control that includes magnetic shielding and demagnetization of parts and the whole-machine is implemented. JLab and Fermilab worked closely on developing magnetic hygiene control procedures, identifying relevant tools, investigating causes of magnetization, magnetic field monitoring, etc. This paper focuses on JLab?s experiences with LCLS-II cryomodule magnetic hygiene control during its fabrication.

Cheng, Guangfeng↗

LCLS-II Cryomodule Production at JLAB

The LCLS-II cryomodule construction program leverages the mature XFEL cryomodule design to produce technologically sophisticated cryomodules with a minimum of R&D according to an accelerated manufacturing schedule. Jlab, as one of the partner labs, is producing 18 cryomodules for LCLS-II. To meet the quality and schedule demands of LCLS-II, many upgrades to the JLAB cryomodule assembly infrastructure and techniques have been made. JLab has installed a new cleanroom for string assembly and instituted new protocols to minimize particulate transfer into the cavities during the cryomodule construction process. JLab has also instituted a set of magnetic hygiene protocols to be used during the assembly process to minimize magnetic field impingement on the finished cavity structure. The goal has been to have gradients, both maximum and field emission onset, that do not degrade between the cavity vertical test and final cryomodule qualification, while maximizing the Q0 of each finished cavity. Results from the prototype and first production cryomodule assembly are presented.

Davis, Giles↗