Search NASA⌕ Search

Engineering topics

Hurd, Joseph

Publications and source records attributed to Hurd, Joseph.

LCSL-II Cryomodule Testing at Fermilab

Cold powered testing of all LCLS-II production cryomodules at Fermilab is complete as of February 2021. A total of twenty-five tests on both 1.3 GHz and 3.9 GHz cryomodules were conducted over a nearly five year time span beginning in the summer of 2016. During the course of this campaign cutting-edge results for cavity Q₀ and gradient in continuous wave operation were achieved. A summary of all test results will be presented, with a comparison to established acceptance criteria, as well as overall test stand statistics and lessons learned.

43 PARTICLE ACCELERATORS↗

PIP-II Injector Test Cryogenic Transfer Line

PIP-II Injector Test will test a nearly full-scale front end of PIP-II accelerator. The cryogenic transfer line will provide 2 K, 5 K and 40 K refrigeration for Half Wave Resonator and Single Spoke Resonator cryomodules. This paper will focus on design, installation and operation plan of the cryogenic transfer line.

43 PARTICLE ACCELERATORS↗

Fermilab Cryogenic Test Facilities

Fermi National Accelerator Laboratory (Fermilab) has multiple cryogenic test facilities, undertaking testing of superconducting magnets, Superconducting Radio Frequency (SRF) cavities, SRF cryomodules and other helium cryogenic components. The test areas within Fermilab include: Meson Cryogenic Test facility (Meson), Industrial Building 1 (IB-1), Heavy Assembly Building/Illinois Accelerator Research Center (HAB/IARC), New Muon Lab, (NML) and the Cryomodule Test Facility (CMTF). Meson and HAB/IARC utilize repurposed Tevatron era reciprocating engine based cryogenic refrigerator systems, whereas CMTF and IB-1 utilize gas bearing turbine based coldboxes. Each of these test areas support the various Fermilab projects and collaborations including the Linear Coherent Light Source II (LCLS-II), Proton Improvement Plan II (PIP-II), High Luminosity Large Hadron Collider (HL-LHC), and Mu2e. This paper outlines the diverse and extensive cryogenic test capabilities within Fermilab.

43 PARTICLE ACCELERATORS↗

Commissioning and Operation of FAST Electron Linac at Fermilab

We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the machine was commissioned with beam in 2017. The maximum total beam energy of about 300 MeV was achieved with the record energy gain of 250 MeV in the ILC-type SRF cryomodule. The pho-toinjector was tuned to produce trains of 200 pC bunches with a frequency of 3 MHz at a repetition rate of 1 Hz. This report describes the aspects of machine commission-ing such as tuning of the SRF cryomodule and beam optics optimization. We also present highlights of an experimental program carried out parasitically during the two-month run, including studies of wake-fields, and advanced beam phase space manipulation.

43 PARTICLE ACCELERATORS↗

Operational Experience from LCLS-II Cryomodule Testing

This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

Wang, Renzhuo↗