Search NASASearch

Engineering topics

Hurley, M. J.

Publications and source records attributed to Hurley, M. J..

Tug rendezvous and docking with a spacecraft - A remote manned approach

The development and use of a visual simulator for remote-manned rendezvous and docking utilizing frame-by-frame, slow-scan, low-light-level TV (LLLTV) was conceived and initiated in mid-1974. The effort was limited to modification, checkout, and validation of simulator hardware specific to this task, to the development of simulation (digital computer) software, and technical support to several rendezvous and docking simulation studies. Analysis and simulation has shown that LLLTV, such as would be required for satellite inspection, could provide a suitable acquisition sensor for a remote manned rendezvous/docking subsystem. A manned, remote simulation has demonstrated its feasibility during the terminal rendezvous and docking phases. Should this approach prove fully adequate in subsequent detailed simulation studies and tests, an order-of-magnitude cost savings can be obtained for early rendezvous and docking operations.

Hurley, M. J.

Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 5: Design of the IPAD system. Part 2: System design. Part 3: General purpose utilities, phase 1, task 2

Viable designs are presented of various elements of the IPAD framework software, data base management system, and required new languages in relation to the capabilities of operating systems software. A thorough evaluation was made of the basic systems functions to be provide by each software element, its requirements defined in the conceptual design, the operating systems features affecting its design, and the engineering/design functions which it was intended to enhance.

Garrocq, C. A.

Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

Garrocq, C. A.

Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 4: Design of the IPAD system. Part 1: IPAD system design requirements, phase 1, task 2

System requirements, software elements, and hardware equipment required for an IPAD system are defined. An IPAD conceptual design was evolved, a potential user survey was conducted, and work loads for various types of interactive terminals were projected. Various features of major host computing systems were compared, and target systems were selected in order to identify the various elements of software required.

Garrocq, C. A.

Booster recovery following premature space shuttle stage separation

Abort criteria necessary to satisfy space shuttle program requirements to include intact vehicle abort capability are discussed. Intact abort implies the ability of the booster and orbiter to separate and both continue flight to a safe landing, with a full payload aboard the orbiter. Obviously, the requirement to separate early along the ascent trajectory presupposes critical operational problems that are probably booster problems and may preclude booster recovery. On the other hand, some critical problems while mated can become manageable when separated and should result in full booster recovery. All critical orbiter problems fall into this category; since stage separation without orbiter thrust is a capability of some separation system concepts, booster stage recovery following separation is a requirement.

Hurley, M. J.

Stage separation of parallel-staged shuttle vehicles, a capability assessment

The separation concept for stage separation of parallel staged space shuttle vehicles is discussed. The forward link separation concept is emphasized. The effects of aerodynamic interference and component mass are analyzed. Qualitative measurements used to perform a preliminary evaluation of various separation system concepts are presented. Line drawings are included to clarify the mechanisms and spacecraft structures used in stage separation.

Hurley, M. J.